Definitive Contract AG3434C100002
Award Date 6/7/10
Potential Completion Date 1/13/12
Potential Value $151K
Funding Federal Agency
Contracting Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
- Not listed
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Petersburg, WV 26847, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of Transportation's Federal Highway Administration awarded a $9 million firm fixed price definitive contract to Dan Williams Company for road rehabilitation work within Big Bend National Park in Texas. The solicitation sought construction services to rehabilitate approximately 2.3 miles of the Chisos Basin Road and West and North Entrance Roads, including pulverizing existing asphalt, installing concrete curb and drainage improvements, and repaving with new asphalt. Performance is...
- The National Park Service, Northeast Region, awarded a $1.56 million firm fixed-price definitive contract to Puyenpa Construction, LLC for repair and resurfacing of access routes at Big Meadows Campground in Shenandoah National Park, Luray, Virginia. The contract was set aside for HUBZone-certified small businesses and awarded on March 10, 2026, with an ultimate completion date of July 6, 2026. The work encompasses applying asphalt overlays across approximately 2.2 miles of single-lane roads and...
- The Department of the Interior National Park Service Intermountain Region awarded a $498,159 firm fixed price delivery order contract to El Paso J.a.g., Inc. doing business as El Paso Jag Inc. to replace piping and floor drains at four comfort stations built in 1960 at Big Bend National Park, Texas. This rehabilitation project will mitigate the existing plumbing and sewer drainage systems at the Chisos Basin Campground comfort stations to address issues that have arisen since their original...
- <p>The Department of the Interior National Park Service Intermountain Region awarded a $329,896.09 delivery order contract to Mirador GPS LLC under the National Park Service Intermountain Region Multiple Award Task Order Contract 2021-2026. Mirador GPS LLC will rehabilitate six camp sites in Big Bend National Park, Texas, with work to be performed between September 15, 2022 and February 28, 2023. The contract uses a firm fixed price pricing structure.</p>
- All-Rite Construction, Inc. has been awarded a firm fixed price delivery order valued at two hundred forty-nine thousand two hundred nine dollars and one cent ($249,209.01) by the National Park Service Intermountain Region to replace approximately one thousand one hundred seventy-seven (1,177) linear feet of three-inch (3") high-density polyethylene (HDPE) waterline at Big Bend National Park in Texas. Work will include installation of a new water line at a minimum four-foot (4') bury...
- The National Park Service Intermountain Region awarded a $289,991.03 firm fixed-price contract to CHP Solutions LLC, a service-disabled veteran-owned small business based in Stafford, Virginia, to replace pavement at Lees Ferry Campground within Glen Canyon National Recreation Area in Arizona. The contract, set aside for total small business, requires pulverizing existing asphalt pavement and applying a 3-inch minimum thickness Hot Mix Asphalt overlay across approximately 5,120 square yards of...
- The Department of the Interior's National Park Service awarded a firm-fixed-price purchase order to Structural Hardware And Supply, Inc., a small business manufacturer, to supply and deliver 3,972 cubic yards (5,000 tons) of road base to Big Bend National Park in Texas. The $181,120.46 contract supports infrastructure maintenance and construction projects within the national park. As a small business set-aside, this award is part of the National Park Service's ongoing efforts to utilize small...
- <p>The Department of the Interior National Park Service Intermountain Region awarded a $488,094.25 firm fixed price delivery order contract to El Paso J.a.g., Inc. doing business as El Paso Jag Inc. to re-pipe and line the wastewater lift station at Big Bend National Park, Texas. The work is to be performed between July 26, 2022 and September 11, 2023 at the park located in Big Bend, Texas.</p>
- The Department of the Interior National Park Service Intermountain Region (DOI-NPS) awarded a $323,066.77 firm fixed price delivery order to Mirador GPS LLC under the National Park Service Intermountain Region Multiple Award Task Order Contract 2021-2026 (NPS Intermountain Region MATOC 2021-2026) indefinite delivery indefinite quantity (IDIQ) master contract. Mirador GPS LLC will perform cyclic maintenance on shade structures in the Rio Grande Village Campground at Big Bend National Park,...
- The Department of the Interior National Park Service Intermountain Region awarded a $878,328 delivery order to Architectural Resources Group, Inc. for renovations at Big Bend National Park's Chisos Mountain Lodge in Texas. As the sole restaurant, lounge, lodging registration, and gift shop within the 800,000-acre Big Bend National Park, the Chisos Mountain Lodge was originally constructed as part of the Mission 66 program to upgrade park infrastructure. Architectural Resources Group will serve...
BIG BEND CAMPGROUND LOOP PAVING
Posted 6/7/10
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Paving and Drainage Improvements to Big Bend Campground Loop B, Potomac Ranger District, Monongahela National Forest | AG-3434-S-10-0005 | Department of Agriculture Forest Service R9-Eastern Region | Award Notice 1/1 | 3/23/10, 4:34 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1 | Close Out | ($122) | 1/13/12 | |
| Not listed | Not listed | $151.2k | 6/7/10 |