This delivery order from the Department of the Interior's Fish and Wildlife Service is for fish passage assessment and design work in the Lower Columbia region. Valued at up to $81,877.90 with a completion date of December 31, 2023, the firm fixed price contract was awarded on August 4, 2020 to Waterways Consulting, Inc. of Astoria, Oregon. No set aside designation was applied to this contract funding fish passage analysis and engineering design to be conducted by Waterways Consulting in support...
The U.S. Army Corps of Engineers awarded a $894,965.14 firm-fixed-price delivery order contract to Tetra Tech, Inc. to reevaluate alternatives for the Cougar Fish Passage project near Blue River, Oregon. Tetra Tech, a global consulting and engineering services firm, will evaluate and compare two additional alternatives for the fish passage infrastructure, including providing design calculations, drawings, cost estimates, risk analysis, and construction scheduling. Tetra Tech has subcontracted...
<p>This is a $305,443.25 firm fixed-price definitive contract awarded by the Operations Center East (a civilian federal agency) to Arrodesign Inc. for the AQUATIC PASSAGE FR25 BRIDGE RECONSTRUCTION project. The contract has a set-aside designation for total small businesses and an ultimate completion date of May 15, 2011. The contract is funded under the agency's Capital Improvement & Maintenance program. No additional subcontractor information is provided.</p>
The Department of the Interior Bureau of Reclamation awarded a firm-fixed-price purchase order to the Washington State Department of Fish & Wildlife (WDFW) for $350,256.19 to provide bull trout tributary passage services in Kittitas and Yakima Counties, Washington. The contract is to establish safe fish passage conditions for upstream and downstream moving adult bull trout in tributaries flowing into Reclamation reservoirs during the spawning migration period, with options to extend the...
<p>This is a $718,764.45 Firm Fixed Price contract awarded by the Operations Center Southwest, a civilian federal agency, to Big J Construction, Inc., an SBA Certified HUBZone Firm. The contract is for the design and build of fish passages under the TAS WATDOG/SLAPJACK program. The contract has an 8(a) Sole Source set aside designation and a completion date of September 29, 2011. No additional major subcontractors are mentioned.</p>
<p>This is a federal contract award to RTR / BLE (JV), a for-profit small business organization, by the U.S. Department of the Army Corps of Engineers Engineering District Walla Walla. The contract is for a Lamprey Passage Structure Bio Evaluation with a firm fixed price of $213,266.00 and a completion date of May 31, 2020. The contract was awarded on July 19, 2018 as a Delivery Order under a set-aside for total small business. The place of performance is Burbank, WA 99323.</p>
The U.S. Army Corps of Engineers, Portland District awarded a $299,800 firm fixed price contract to HME Construction Inc. to perform dredging services at the exit of the Bradford Island Fish Ladder in Cascade Locks, Oregon. The solicitation sought bids to remove accumulated sediment and restore required water depths, with estimates for removal of approximately 215 cubic yards of material. The contract is being carried out under a total small business set-aside and is funded by the Department...
<p>The Bureau of Reclamation, Pacific Northwest Regional Office, awarded a $1,844,794.92 firm fixed price purchase order contract to Fish Transport Systems LLC, a for-profit limited liability company, to test an innovative system to move adult sockeye salmon upstream over the Cle Elum Dam in Cle Elum, Washington. The contract has a completion date of September 30, 2017 and was awarded on April 18, 2017. This contract is not associated with a set-aside designation.</p>
This is a $5,664,970.00 Firm Fixed Price federal contract awarded by the U.S. Army Corps of Engineers to Advancia Remediation Services, LLC, a minority-owned small business certified by the SBA in the 8(a) and HUBZone programs. The contract is for the "MCL - FISH PASSAGE LOW FLOW CHANNEL NOTCHING PHASE 2" project, which involves construction and environmental remediation work in Walla Walla, Washington. The contract was awarded as an 8(a) sole source set-aside and has an ultimate...
The Bureau of Land Management Oregon-Washington awarded a $272,560 firm fixed price contract to Billeter Marine LLC for the removal of an existing 42-inch diameter corrugated metal pipe and replacement with a 70-foot long by 18-foot wide galvanized steel bridge. The solicitation sought proposals to perform clearing, grubbing, constructing a stream bypass, dewatering, excavating bedrock, building geosynthetic soil abutments, placing eco-block foundations, and restoring the roadway. This total...