<p>This is a firm fixed-price purchase order contract awarded by the U.S. Department of Agriculture's Region 9 - Eastern Region to Powell Excavating And Tree Service, a self-certified small disadvantaged business. The contract, valued at $4,550.00, is for the reinstallation of a culvert under the FR 2490 project and has a period of performance through July 30, 2015. The contract is designated as a Total Small Business set-aside.</p>
This firm fixed-price purchase order was awarded by the Department of the Interior's Bureau of Land Management (BLM) Montana-Dakotas Region to RF Construction LLC, a small business contractor based in Montana. The $149,200.00 contract is for the replacement of a culvert on the GAOA Dry Fork Road in Phillips County, Montana. The work includes removing an existing set of two corrugated steel pipe (CSP) culverts and installing a single CSP culvert with polymer coating, concrete cutoff walls, riprap...
This firm fixed price contract valued at two hundred eighty-nine thousand six hundred nine dollars and ninety cents ($289,609.90) was awarded by the United States Department of Agriculture Forest Service Rocky Mountain Region to RPM Excavating & Pumping LLC, doing business as RPM Excavating & Pumping, to replace a culvert on Red Sandstone Creek within the White River National Forest in Glenwood Springs, Colorado. The solicitation sought proposals to remove an existing sixty-two foot...
Oldcastle SW Group, Inc. was awarded a definitive contract valued at $4,371,025.99 by the United States Department of Transportation Federal Highway Administration to perform reconstruction and resurfacing work along 5.3 miles of the East Portal Access Road in Crawford, Colorado. The solicitation sought bids to pulverize and overlay 5 miles of existing pavement and reconstruct 0.3 miles, including roadway excavation, rock bolting, doweling, aggregate, full depth reclamation, and asphalt concrete...
<p>This is a $64,705.54 firm-fixed-price definitive contract awarded by the Operations Center East, a civilian U.S. government agency, to Stibbe Excavating And Grading, Inc. for the COLDWATER CREEK CULVERT REPLACEMENT project under the COLDWATER CREEK AT FR2404 CULVERT REPLACEMENT major program. The contract has an ultimate completion date of January 3, 2011 and was awarded on May 25, 2010. This contract does not have a set-aside designation.</p>
The U.S. Department of Agriculture (USDA) Forest Service awarded a $123,055 firm fixed-price delivery order contract to Price Contracting Inc., a veteran-owned small business, for the POWELL CREEK CULVERT REPLACEMENT project in Grangeville, ID. This contract was set aside for small businesses. Price Contracting Inc. has received over 30 federal contract awards from the USDA Forest Service and the Department of Transportation Federal Highway Administration since 2003 to deliver infrastructure...
The United States Department of Agriculture Forest Service, Northern Region awarded a $315,080 firm fixed price delivery order contract to Stone Ridge Construction, Inc. The project is located on Forest Road No. 282 at milepost 10.00 at the crossing of the North Fork of Little Joe Creek in Trout Creek, Montana. Improvements consist of but are not limited to the removal and salvage of the existing multi-plate steel plate arch culvert and concrete structure. The period of performance is from...
This is a firm fixed-price delivery order awarded by the U.S. Department of Agriculture Forest Service (USFS) to Price Contracting Inc., a veteran-owned small business contractor. The contract, valued at $78,365.00, is for the replacement of a culvert on National Forest System Road 432 at mile post 16.9 in Stevensville, Montana. The project is not set aside. Price Contracting Inc. has a history of providing road construction, reconstruction, and maintenance services to the USFS across Regions 1,...
This delivery order, awarded under the Department of Agriculture Forest Service R9-Eastern Region Roads and General Construction Multiple Award IDIQ, calls for the replacement of an existing failing stream crossing with a new larger culvert in Lily Pad Creek. Snow Country Contracting Inc., an SBA-certified HUBZone firm, will replace the culvert for $114,016.98 by May 15, 2022. The work supports the Forest Service's efforts to improve infrastructure and protect water quality in the Great Lakes...
The U.S. Department of Agriculture Forest Service awarded a $98,117.80 firm fixed price delivery order contract to Jack Bowen Excavating of Mt Tabor, Vermont. The contract calls for the replacement of an existing five-foot diameter culvert with a new seven-foot, three-inch wide by five-foot, three-inch high by seventy-eight-foot long aluminized steel pipe arch culvert. Additional work includes removal of an existing temporary bridge and its relocation. The contract was awarded on April 26,...