All NASA power processing units (ppus) including DC to DC and DC to AC converters and inverters require a DC-link capacitor, placed between the DC source (PV solar array or battery) and the…
Ended Definitive Contract Awarded Last action
- Contract number
- 80NSSC18C0126
- Awardee
-
Sigma Technologies International Group, Inc. UEI Z9AXH5DHE639
- Awarding agency
-
Shared Services Center
National Aeronautics and Space Administration
- Obligated
- $723,557
Award facts
- Contract value 100% obligated
- $723,557.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- Contracting staff
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Set-aside
- Total Small Business
- Competition
- Full and Open Competition after exclusion of sources · 500 offers Negotiated Proposal / Quote
- Pricing
- Firm Fixed Price
- Place of performance
- Oro Valley, AZ 85737, USA
- Research
- SBIR Program Phase II Action
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Other Administrative Action | $0 | |
| Original award | $723,557 |
About this award
This is a $723,557.00 Firm Fixed Price contract awarded by the National Aeronautics and Space Administration Shared Services Center to Sigma Technologies International Group, Inc. under the SBIR Program Phase II. The contract is for the development and evaluation of polymer multi-layer (PML) capacitors as an improved solution to address the failure mode identified in the multi-layer ceramic (MLC) capacitors currently used in NASA's Power Processing Units (PPUs). The PML capacitors are expected to have superior capacitance stability, higher energy density, and self-healing properties compared to the existing MLC parts. This is a total small business set-aside contract, and the work will be performed in Oro Valley, Arizona.
Description
All NASA power processing units (ppus) including DC to DC and DC to AC converters and inverters require a DC-link capacitor, placed between the DC source (PV solar array or battery) and the switching power semiconductors. NASA technical personnel has identified a failure mode in multi-layer ceramic (MLC) DC-link capacitors currently used in ppus that can cause them to short. Polymer multi- layer (PML) capacitors that sigma technologies proposed as a solution, have self-healing properties and do not short. The phase i development demonstrated that the PML parts have superior capacitance stability with temperature and voltage bias. MLC capacitance drops by as much as -80% at -196OC and -40% at +200OC , while PML capacitance variation is limited to -15% and 0% respectively. Furthermore, PML capacitors have approximately 5X higher energy density and 10X higher specific energy. In the phase II program plug compatible PML capacitors with multi-pin electrodes will be produced and evaluated with a voltage rating specifically designed for 120V ppus. Some PML parts will be produced with the same capacitance as that of mlcs and others with higher capacitance but equal or lower volume. Equal capacitance parts will dramatically reduce capacitor size and weight and will improve reliability. Higher DC-link capacitance is always desirable in PPU circuits, because and IT can further minimize ripple current, voltage fluctuations and transient suppression. Use of higher capacitance PML parts, will improve the functionality and reliability of the overall PPU circuit, without a penalty in weight and volume. PML capacitors will be supplied to NASA technical personnel during the development period for electrical and environmental evaluation. The potential business opportunity of expanding the PML capacitor market to that of high voltage and high capacitance mlcs, which are prone to micro-cracking, are costly and have inferior dielectric properties, will be explored.
Quick answers
Who was awarded contract 80NSSC18C0126?
80NSSC18C0126 was awarded to Sigma Technologies International Group, Inc. by Shared Services Center (National Aeronautics and Space Administration) on May 7, 2018.
How much is contract 80NSSC18C0126 worth?
The government has obligated $723,557 on 80NSSC18C0126.
Was contract 80NSSC18C0126 competed?
The extent of competition for 80NSSC18C0126 was full and open competition after exclusion of sources. The government received 500 offers. It was set aside: Total Small Business.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award