Definitive Contract 6923G523C0013

Award Date 1/9/23
Potential Completion Date 5/31/24
Potential Value $7.7M
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Massena, NY 13662, USA
Solicitation Procedures
Two Step
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of Transportation Saint Lawrence Seaway Development Corporation awarded Kubricky Construction Corp. a $6.3 million firm fixed price contract to design and construct the replacement of up to six concrete diffusers below the downstream sill at the Eisenhower Lock in Massena, New York. The solicitation sought proposals for a design-build project to replace the diffuser structures over two winter seasons, with an estimated construction cost between $5-10 million. Per the solicitation,...
This $3,576,250.00 firm fixed-price definitive contract was awarded by the Saint Lawrence Seaway Development Corporation, a civilian agency within the U.S. Department of Transportation, to Patterson Stevens Inc., a small business located in Tonawanda, New York. The contract is for concrete rehabilitation work at the Eisenhower and Snell Locks in Massena, New York, which was originally solicited as a 100% small business set-aside. The work involves demolition, steel reinforcement, and shotcrete...
<p>This is a firm fixed-price definitive contract awarded by the Saint Lawrence Seaway Development Corporation, a civilian federal agency, to Kubricky Construction Corp for $5,296,925.00. The contract, which does not have a set-aside designation, is for HFM SLOTS and has an ultimate completion date of July 19, 2017. The contract was awarded on September 30, 2015. Kubricky Construction Corp is the prime contractor, and there is no information provided about any major subcontractors.</p>
The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a $1.15 million firm fixed price contract to Patterson Stevens Inc. to perform shotcrete construction work at the Eisenhower Diffuser Pit located in Massena, New York. The contract, set aside for total small businesses, involves demolishing 35 cubic yards of deteriorated concrete and placing 40 cubic yards of new concrete reinforced with steel at the diffuser pit. The solicitation sought proposals for this...
This definitive contract for $524,869.22 was awarded by the Department of Transportation's Saint Lawrence Seaway Development Corporation to Patterson Stevens Inc., a small business contractor, for the concrete rehabilitation of the inlet manifold (&quot;teardrop&quot;) areas of the Eisenhower Lock on the Saint Lawrence Seaway. The contract involves the removal of approximately 25 cubic yards of deteriorated concrete and the placement of 50 cubic yards of new steel-reinforced dry mix shotcrete....
This $135,000.00 Firm Fixed Price delivery order was awarded by the U.S. Department of Transportation's Saint Lawrence Seaway Development Corporation to the NKB &amp; Ram-Tech JV, a for-profit organization, for a DIFFUSER STUDY TASK ORDER. The work is to be performed in Massena, New York and was completed on May 14, 2020. The delivery order was issued under the larger SLSDC Architect Engineer Services 2016-2021 indefinite delivery, indefinite quantity (IDIQ) contract vehicle. No set-aside...
The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a Definitive Contract to Shotcrete Montana LLC, a Self Certified Small Disadvantaged Business, for Firm Fixed Price services to rehabilitate concrete surfaces for the culvert valve recesses at Eisenhower Lock in Massena, New York. The contract has a potential value of $233,759.49 and a completion date of March 4, 2019. This contract award replaces a previous award due to an error encountered in the Oracle...
The U.S. federal government, through the Saint Lawrence Seaway Development Corporation (SLSDC), awarded a $94,382.00 firm fixed price contract to Dow Electric, Inc., a small business contractor located in Massena, New York. The contract is for the repair of the deteriorated concrete and steel grating framing along the drainage trench in the Eisenhower Lock Highway Tunnel. This construction project was set aside for small businesses under NAICS code 237310 (Highway, Street and Bridge...
The Federal Contract Award 6923G525C0053 was issued by the Saint Lawrence Seaway Development Corporation, a civilian agency, to the prime contractor Lavacks Custom Builders, Inc., a self-certified small disadvantaged business. The $850,000.00 definitive, firm-fixed-price contract requires the installation of new pavement, drainage structures, and fencing in the parking area on the south side of the Eisenhower Lock west of the visitor center. This contract was awarded under a total small business...
<p>The Department of Transportation's Saint Lawrence Seaway Development Corporation awarded a $275,490.00 Firm Fixed Price Definitive Contract to Continental Construction LLC, a for-profit small business, to replace old and install new steel grating covers at the Eisenhower Snell Lock. The contract has a completion date of December 20, 2019 and was awarded on July 31, 2019. This contract award is part of the agency's work to maintain and improve infrastructure along the St. Lawrence Seaway.</p>

This is a definitive contract awarded by the Saint Lawrence Seaway Development Corporation (SLSDC), a civilian agency within the U.S. Department of Transportation, to Kubricky Construction Corp, a small business, for the replacement of six deteriorated concrete diffuser structures at the Snell Lock over two winter seasons.

The contract has a ceiling value of $7,706,010.81 and is a firm fixed price contract. It was set aside for total small business participation. The project involves replacing three diffusers in the first year from early January to early March 2023 when the lock is dewatered, and three more the following winter season. Each diffuser comprises approximately 190 cubic yards of reinforced concrete and measures around 80 feet long, 14 feet wide, and 13 feet high, with sixteen openings. The work requires special access equipment and crane services due to the diffusers being 50 feet below the lock wall and submerged in 45 feet of water.