- This federal contract was awarded by the Department of Transportation Federal Highway Administration to the prime contractor Missouri River Contractors, LLC for the rehabilitation of the Many Glacier Road in Montana. The contract is a definitive, firm fixed-price contract with a potential value of $18,452,739.48 and a completion date of November 19, 2021. The work involves road and bridge repairs, including concrete work, electrical installations, asphalt paving, masonry, and traffic control...
- This is a $8,855,533.56 federal contract awarded by the Department of Transportation Federal Highway Administration to Intermountain Slurry Seal, Inc., a subsidiary of Granite Construction Incorporated, to provide pavement preservation services at East Glacier Park Village, Montana. The contract is a firm fixed price delivery order with a completion date of July 8, 2020. The contract includes pavement patching, chip sealing, microsurfacing, crack cleaning and sealing, and other road...
- On March 10, 2022, the U.S. Department of Transportation Federal Highway Administration awarded a $15,198,486.33 firm fixed price contract to Ceccanti, Inc., a for-profit S corporation construction company, to relocate approximately 8 miles of utilities including a sewer force main, power, and phone lines along Lake McDonald Road in Glacier National Park, Montana. The work must be completed by June 5, 2023. This contract was competitively awarded on a full and open basis with no set-aside...
- The Federal Highway Administration (FHWA), part of the Department of Transportation (DOT), awarded a firm fixed price contract valued at $664,099.25 to Vine Laboratories Inc. to complete subsurface investigations at five sites along Many Glacier Road in Glacier National Park, Montana. The investigations will inform mitigation designs for landsliding at mileposts 4.9, 5.00-5.25, 6.55, 7.35, and Swift. Performance will take place in West Glacier, Montana from January 2022 through November 2023....
- The Department of the Interior National Park Service Intermountain Region awarded a purchase order to Holden Excavating LLC for $183,450 on August 11, 2026, for 3/4" minus crushed gravel delivery to Glacier National Park. The order carries a total small business set-aside. Performance is in Columbus, Montana, with delivery to Babb, Montana between August 1 and September 1, 2026. The procurement calls for 3,669 tons of road mix gravel meeting a minimum 70% fractured stone requirement,...
- This federal contract award, with a ceiling value of $22,562,108.17, was issued by the Federal Highway Administration to the Alaskan Native Corporation-owned small disadvantaged business Brice Civil Constructors, Inc. The contract involves the rehabilitation of the final 9.3 miles of the Going-to-the-Sun Road and replacement of the McDonald Creek bridge in Glacier National Park, Montana. The scope of work includes new steel girder bridge construction, removal of the existing bridge, earthwork,...
- Valley Fence Incorporated received a definitive contract valued at $4,655,616.80 from the Department of Transportation Federal Highway Administration to resurface the last four miles of Camas Road within Glacier National Park, Montana. The firm fixed price contract calls for asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter installation, sidewalk construction, underdrain installation, ditch reconditioning, and signing and striping along the...
- Missouri River Contractors LLC has been awarded a definitive, firm-fixed price contract valued at $9,756,815.49 by the National Park Service to rehabilitate 13 bridges across three locations in Glacier National Park. Per the original solicitation, work will involve bridge deck and approach repair, timber pile replacement, sidewalk and curb replacement, painting, concrete repair, and other rehabilitation efforts over two construction seasons from 2022 through 2023. There was no set-aside...
- This is a $42,581,647.40 delivery order awarded by the Federal Highway Administration (FHWA), a civilian agency within the U.S. Department of Transportation (DOT), to H-K Contractors, Inc., a for-profit construction company. The delivery order is part of a larger Going-To-The-Sun Road Rehabilitation multiple-award task order contract, which has a $590 million total ceiling value. The purpose of this delivery order is to fund the Recovery, Transportation, and Accessibility Services (TAS)...
- The National Park Service Intermountain Region awarded a purchase order to Lasalle Sand & Gravel Corp for $82,968 on August 4, 2026, under a small business set-aside, for supply and delivery of 2,731 tons of 3/4" minus crushed gravel to Glacier National Park. Performance is at West Glacier, Montana. The order comprises two line items: 607 tons (Line 10) and 2,124 tons (Line 20), both firm fixed price. Delivery runs August 10 through September 19, 2026, Monday–Friday, 7:00 AM to 4:00...
The Federal Highway Administration awarded a $24.5 million definitive contract to Granite Construction Company for rehabilitation of Two Medicine Road in Glacier National Park, Montana, on August 28, 2026, under firm fixed-price pricing with no set-aside. Work spans 7.22 miles of roadway approximately 4 miles northwest of East Glacier, Montana, with ultimate completion by November 12, 2027. The scope includes asphalt pavement reconstruction (approximately 23,500 tons), replacement of existing culverts ranging from 12-inch to 120-inch diameters totaling approximately 4,650 linear feet, mill and overlay of two parking areas, concrete curbing and sidewalks, utility systems, environmental design work for streambed channel reconstruction and wetlands mitigation, sign systems, pavement markings, and turf establishment and wetland plantings. Project requirements encompass mobilization, construction survey and staking, contractor quality control and testing, and soil erosion control measures. NAICS 237310 (Highway, Street, and Bridge Construction); PSC Y1LB.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine Road | 69056726B000005 | Department of Transportation Federal Highway Administration | Solicitation 2/3 | 7/1/26, 5:51 PM | |
MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine Road | 69056726C000017 | Department of Transportation Federal Highway Administration | Award Notice 3/3 | 8/28/26, 3:31 PM | |
MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Medicine Road / MT NP GLAC 12(2) FLTP Rehabilitation of Two Medicine Road | 69056726B000005 | Department of Transportation Federal Highway Administration | Pre-Solicitation 1/3 | 3/3/26, 1:45 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Supplemental Agreement for work within scope | $481.8k | 9/8/26 |