Install two new forced air electric heaters in the first floor mechanical rooms to maintain temperatures at acceptable levels and prevent damage to building systems located at 515 9TH street, rapid…

Ended Definitive Contract Awarded

Contract number
47PD5326C0009
Awardee
Awarding agency
Obligated
$18,500

Award facts

Opportunity
Contract value 100% obligated
$18,500.00 Current and potential, with all options
Completion date 100% complete
  • Current, with exercised options
  • Potential, with all options
Contracting staff
Set-aside
Total Small Business
Competition
Competed under SAP · 3 offers Simplified Acquisition
Pricing
Firm Fixed Price
Place of performance
Rapid City, SD 57701, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

About this award

Public Buildings Service awarded a firm fixed price definitive contract with a ceiling value of $18,500 to Veren Industries LLC on August 26, 2026, to install two forced-air electric heaters in the first-floor mechanical rooms of the Andrew W. Bogue Federal Building at 515 9th Street, Rapid City, South Dakota, under a total small business set-aside. The originating solicitation, issued by the General Services Administration, restricted eligibility to small businesses located in South Dakota. Veren Industries LLC is an SBA Certified HUBZone Firm and is identified as minority-owned.

The scope calls for two wall-mounted forced-air electric heaters rated 15 to 20 kilowatts, each with a stand-alone wall-mounted adjustable thermostat and all required electrical components, conduit, and wiring under the National Electrical Code. The contractor is responsible for relocating electrical and mechanical building system components as needed, complying with OSHA hazardous energy control requirements, and repairing any damage caused by the project. Building operations must continue without disruption to tenants.

Ultimate completion is November 24, 2026. The solicitation sets a 30-calendar-day performance period from Notice to Proceed, September 30 through October 30, 2026, with detailed work schedules due within 7 calendar days of award and construction starting within 60 calendar days of award. Davis-Bacon prevailing wage rates apply under wage determination SD20260029, effective May 18, 2026. The contractor must provide performance and payment bonds, obtain all permits, secure GSA National Safety and Health approval of a site-specific safety and health plan before construction, and provide a one-year warranty on labor and materials.

Evaluation used lowest price technically acceptable source selection. Technical acceptability required at least two similar design-build projects completed within the past eight years and a work plan and schedule not exceeding three pages.

Description

Install two new forced air electric heaters in the first floor mechanical rooms to maintain temperatures at acceptable levels and prevent damage to building systems located at 515 9TH street, rapid city, SD 57701.

Quick answers

Who was awarded contract 47PD5326C0009?

47PD5326C0009 was awarded to Veren Industries LLC by Public Buildings Service (General Services Administration) on August 26, 2026.

How much is contract 47PD5326C0009 worth?

The government has obligated $18,500 on 47PD5326C0009.

Was contract 47PD5326C0009 competed?

The extent of competition for 47PD5326C0009 was competed under sap. The government received 3 offers. It was set aside: Total Small Business.

On GovTribe