- The Department of Veterans Affairs, Veterans Integrated Service Network 21, awarded a $1.875 million definitive contract to Rock Construction Management LLC for mechanical equipment replacement at the VA Southern Nevada Healthcare System on May 6, 2026, under a service-disabled veteran-owned small business set-away. The contract scope includes decommissioning and replacing two clean steam generators, replacing heating hot water pumps, installing a new reverse osmosis feed water unit, modifying...
- This is a $4,295,427.00 firm-fixed-price definitive contract awarded by the Department of Veterans Affairs (VA) to Fedvet Construction, a service-disabled veteran-owned small business (SDVOSB), to replace the roof of Building 1 at the VA Southern Nevada Healthcare System in North Las Vegas, Nevada. The project is set to be completed by March 19, 2026. The contract was awarded on September 18, 2025, under a pre-solicitation that was posted on April 9, 2025, with a response deadline of April 17,...
- This is a $6,619,711.00 definitive, firm-fixed-price contract awarded by the U.S. Department of Veterans Affairs (VA) Veterans Health Administration (VHA) Veterans Integrated Service Network 21 (VISN 21) to Sentinel Builders, LLC, a Service-Disabled Veteran-Owned Small Business (SDVOSB). The contract is for a utility infrastructure project at the VA Sierra Nevada Health Care System Ioannis A. Lougaris Medical Center in Reno, Nevada. The work involves constructing a comprehensive utility system...
- On April 8, 2020, the Department of Veterans Affairs, Veterans Integrated Service Network 21 (VISN 21), awarded a $21.3 million Definitive Contract to Cti-Oes JV for an Energy Savings Performance Contract (ESPC) at Las Vegas area VA medical facilities. The service-disabled veteran-owned small business set-aside contract, structured as firm fixed price, extends through January 1, 2044 and encompasses energy and water conservation measures including HVAC optimization, lighting retrofits, water...
- The Department of Veterans Affairs, Veterans Integrated Service Network 21, awarded a $1.18M firm fixed-price design contract to Fourfront Design Inc. (doing business as 4 Front) on February 12, 2024, for architectural and engineering services to upgrade the Central Utility Plant at the VA Southern Nevada Healthcare System in Las Vegas. The contract, set aside for service-disabled veteran-owned small businesses, requires completion by March 17, 2027, and encompasses design services including...
- Capex Construction LLC, a service-disabled veteran-owned small business (SDVOSB) based in American Fork, Utah, was awarded a $4.19 million firm fixed-price definitive contract by the Department of Veterans Affairs' Veterans Integrated Service Network 21 on February 12, 2025. The contract encompasses flooring replacement in the Operating Room, Post Anesthesia Care Unit, and Special Procedures areas at the Las Vegas VA Medical Center in North Las Vegas, Nevada, with modification P00003 authorizing...
- <p>This is a $77,604,919.00 definitive contract awarded by the U.S. Department of Veterans Affairs (VA) Office of Construction and Facilities Management to SGJV2, LLC, a service-disabled veteran-owned small business. The contract is for the design and construction of a replacement boiler plant at the VA Medical Center in Reno, Nevada. The contract has a firm fixed price and is set to be completed by May 31, 2029.</p>
- The Department of Veterans Affairs Veterans Health Administration awarded a $1.77 million firm fixed price delivery order contract to Bexar-Advanced Solutions Group, LLC to renovate logistics space at the VA Sierra Nevada Health Care System campus located in North Las Vegas, Nevada. The contract was awarded under Veterans Integrated Service Network 21 and will support renovations and upgrades to logistics facilities at the VA medical center through May 2023. Bexar-Advanced Solutions Group will...
- The Department of Veterans Affairs, Veterans Integrated Service Network 21 (VISN 21) awarded a $5.5 million firm fixed-price definitive contract to Sentinel Builders, LLC, a Service-Disabled Veteran-Owned Small Business (SDVOSB) based in Sparks, Nevada, for HVAC replacement and flooring upgrades at the Sterile Processing Service (SPS) facility within the VA Sierra Nevada Health Care System in Reno, Nevada. The contract, awarded on October 20, 2022, with an ultimate completion date of March 31,...
- The Department of Veterans Affairs, through Veterans Integrated Service Network 21, awarded a definitive firm fixed-price contract to Fierro Construction LLC on January 28, 2026, for emergency lift station repair services at the VA Medical Center in Las Vegas. The contract, valued at $167,845.75 with no set-aside designation, requires completion by February 27, 2026, and will be performed in North Las Vegas, Nevada. This emergency repair work is critical infrastructure maintenance necessary to...
The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 21, awarded a $9.564 million definitive contract to Rock Construction Management LLC for comprehensive improvements to the Central Utility Plant at the VA Southern Nevada Healthcare System on May 11, 2026, under a Service-Disabled Veteran-Owned Small Business set-aside. The contract is firm fixed price with an ultimate completion date of May 6, 2027. Place of performance is North Las Vegas, NV. The originating market research solicitation (posted October 28, 2025, with response deadline November 4, 2025) sought qualified contractors for commercial and institutional building construction work (NAICS 236220) involving replacement of heat recovery systems, water softener piping, condensate tanks, pumps, cooling towers, and implementation of automation and control system upgrades at the medical center. The scope requires maintaining continued medical center operations through phased work execution, providing daily subcontractor briefings, adhering to strict infection control and VA security protocols, and completing third-party inspections and commissioning. The government had initially estimated project cost between $5 million and $10 million with a targeted 360-calendar-day construction schedule. This award reflects Modification P00001 to add Executive Order 14398.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Z1DA--Improve Central Utility Plant VAMC Las Vegas, NV Project 593-22-350 | 36C26126R0004 | Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 | Pre-Solicitation 2/3 | 11/18/25, 7:15 PM | |
Z1DA--Improve Central Utility Plant | 593-22-350 | 36C261-26-AP-0849 | 36C26126R0004 | Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 | Pre-Solicitation 1/3 | 10/28/25, 7:51 PM | |
Z1DA--Improve Central Utility Plant VAMC Las Vegas, NV Project 593-22-350 | 36C26126R0004 | Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 | Solicitation 3/3 | 1/14/26, 11:14 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Supplemental Agreement for work within scope | $0 | 5/14/26 |