Definitive Contract 15B41821CW430001
Award Date 6/17/21
Potential Completion Date 9/30/21
Potential Value $25K
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Terre Haute, IN, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
3
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- On July 28, 2023, the Environmental Protection Agency (EPA) Region 2 awarded a delivery order to Aptim Federal Services, LLC for the Vestal Thermal Remedial Action project under the EPA Superfund program. This $22.4 million cost-plus-fixed-fee contract, with an ultimate completion date of July 27, 2027, supports environmental remediation and cleanup activities at the Vestal, New York site. The contract was issued without a set-aside designation and is structured as a delivery order under the...
- This is a delivery order under a federal contract awarded by the Office of Land and Emergency Management, part of the U.S. Environmental Protection Agency (EPA), to ICF Incorporated, L.L.C., a global consulting and services firm. The $107,905 time-and-materials contract requires the preparation of reports and case studies on innovative hazardous waste remediation technologies, building on previous work under the same contract. This contract has no set-aside designation. ICF Incorporated,...
- Environmental Quality Management, Inc. (EQM), a minority-owned small disadvantaged business and subsidiary of Arctic Slope Regional Corporation, was awarded a delivery order modification (MOD P00004) on July 8, 2024, under the Emergency and Rapid Response Services (ERRS) contract with EPA Region 10. This modification extends the period of performance from November 30, 2025, to November 30, 2026, for environmental remediation and response services in Bothell, Washington. The delivery order...
- The General Services Administration's National Capital Region awarded a $3.41 million firm fixed-price contract to FC Remediation SEFC, LLC on March 13, 2023, for environmental remediation services at the Southeast Federal Center in Washington, D.C. The contract, which runs through March 30, 2025 (with an ultimate completion date of June 30, 2025), requires the contractor to perform soil remediation to remove contaminated soil, provide environmental oversight for Parcel H and surrounding...
- US Ecology Washington Inc., a subsidiary of Republic Services Inc., was awarded a delivery order valued at $154,821.92 by the Naval Sea Systems Command (NAVSEA) on September 24, 2025, with an ultimate completion date of September 23, 2026. This firm fixed-price delivery order, issued without set-aside designation, is a child award under US Ecology Washington's single-award indefinite delivery/indefinite quantity (ID/IQ) contract with NAVSEA. The parent ID/IQ contract, valued at $26.47 million...
- The U.S. Air Force Civil Engineer Center awarded a delivery order valued at $30.2 million on August 12, 2011, to FPM Remediations, Inc. for performance-based remediation services at five former Air Force installations: Bergstrom AFB in Texas, Carswell AFB in Texas, Eaker AFB in Arkansas, Homestead AFB in Florida, and Richard Gebaur AFB in Missouri. The contract, which is firm fixed price and has an ultimate completion date of June 30, 2024, was issued under the Worldwide Environmental...
- The Environmental Protection Agency Region 4 awarded a $862,419 delivery order against the Emergency Rapid Response Services IV indefinite-delivery/indefinite-quantity contract to C M C, Inc. to perform TIME CRITICAL REMOVAL of hazardous materials at the Florence Battery Exide Plant located in Florence, Mississippi. The removal work will be conducted from September 1, 2021 through December 23, 2021 on a time and materials basis. No subcontractors or set aside designations were identified. The...
- This federal contract was awarded by the General Services Administration's Public Buildings Service National Capital Region to FC Remediation Sefc, LLC, a for-profit environmental remediation services provider. The $145,500.00 definitive contract is for SEFC PARCELS I & F CMI WORKPLANS, which involves soil remediation, oversight, and development of corrective measures implementation work plans at the Southeast Federal Center site in Washington, D.C. The contract has a completion date of...
- FPM Remediations, Inc., an Alaska Native Corporation-owned small disadvantaged business certified under the SBA's 8(a) program and HUBZone initiative, was awarded a $209,472 firm fixed-price delivery order by the Air Force Civil Engineer Center on September 23, 2015, for remedial action at Site COW006 (Oil Water Separator 741) at the former Homestead Air Force Base in Florida. The contract, which was issued without set-aside designation under the Professional Services Schedule, was completed...
- The General Services Administration's Public Buildings Service National Capital Region awarded a definitive, firm-fixed-price contract to FC Remediation Sefc, LLC, a for-profit environmental remediation services provider, for the SEFC PARCEL L REMEDIATION project in Washington, D.C. The contract, valued at $1,151,796.66, was awarded on September 22, 2017 with a completion date of November 30, 2018. The contract did not have a set-aside designation. FC Remediation Sefc, LLC has received...
HAZARDOUS MATERIAL REMEDIATION FCI
Posted 6/17/21
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $24.5k | 6/17/21 |