Definitive Contract 140R2023C0007

Award Date 5/19/23
Potential Completion Date 5/31/23
Potential Value $2.4M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Not Competed
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Rancho Cordova, CA 95670, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Bureau of Reclamation awarded a $500,000.00 firm fixed price contract to Syblon-Reid Co. for the CT - FUP LEAD VALVE REPLACEMENT project. The contract has an ultimate completion date of October 24, 2025. This contract does not have a set-aside designation. Syblon-Reid Co. is a for-profit organization that specializes in construction and engineering services, particularly for water infrastructure projects, and has a history of successfully delivering similar contracts for the Bureau of...
The Department of the Interior Bureau of Reclamation awarded a $257,239.87 firm fixed price contract to Rod Transport Inc., doing business as Rod Construction, to replace the security fence and gates on the south side of the Folsom South Canal in Folsom, California. The contract is an 8(a) sole source set aside awarded to Rod Construction. Work will be performed in Folsom between September 14, 2020 and April 20, 2022 to deliver the requested security upgrades along the Folsom South Canal, a...
This is a $6,767,800.15 firm-fixed-price definitive contract awarded by the Bureau of Reclamation, a civilian agency, to Building Solutions, Inc. for the Recovery Folsom Dam Civil Maintenance Building Replacement project. The contract was competitively set aside for an 8(a) small disadvantaged business. The work is being performed in Folsom, California and has an ultimate completion date of August 22, 2012. This project is part of the American Recovery and Reinvestment Act (ARRA) program.
The U.S. Department of the Interior Bureau of Reclamation awarded a $410,515.00 Firm Fixed Price Definitive Contract to A California Corporation Division 5-15 for metalwork improvements at the Folsom Dam and Dikes in Folsom, California. The contract, which was set aside for small businesses, includes the design, fabrication, and installation of ladders, stair systems, pedestrian bridges, and guardrailing for safe access and maintenance of the dam facilities. This contract was issued under...
The U.S. Army Corps of Engineers Engineering District Sacramento awarded a $121,353,320.19 firm fixed-price contract to Folsom Dam Constructors, a for-profit organization, to raise the elevations of the Folsom Main Dam, Left Wing Dam, and Right Wing Dam in Folsom, California. This contract, which does not have a set-aside designation, is intended to increase flood protection for communities along the American River. The work will be completed by July 6, 2027 and is based on a pre-solicitation...
This is a firm fixed-price construction contract awarded by the Bureau of Reclamation, a civilian federal agency, to Suulutaaq, Inc., a small disadvantaged business, for the Folsom Right Wing Dam - North Fork Ditch Bypass Modification project. The $5,005,410.00 contract involves removing existing conduit, removing a concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. The project aims to improve seepage stability and modify the existing dam...
This is a $1,237,583.79 firm fixed price contract awarded by the Department of the Interior's Bureau of Reclamation to Harrison Western Construction Corporation, a self-certified small disadvantaged business, for the Folsom Dam Auxiliary Spillway American River Phase V - Right Bank Stabilization project. The contract, which is set aside for total small businesses, involves concrete repair work on the Folsom Dam spillway in Folsom, California, with a completion date of January 16, 2018....
This federal contract award, valued at $1,753,072.49, was issued by the U.S. Army Corps of Engineers (USACE) to Newland Entities, Inc., a small disadvantaged business, for the Right Bank Stabilization Project. This project is part of the larger Joint Federal Project Phase V, which addresses the potential destabilization of the existing slope where flows converge from the main Folsom Dam and new auxiliary spillway in Folsom, California. The primary objective is to ensure the slope between...
This is a definitive contract awarded by the Department of the Interior Bureau of Reclamation to the County of Sacramento, California, for the provision of security services at Folsom Dam. The contract has a potential value of $5,618,535.89 and is a time and materials pricing type contract. The period of performance runs from July 1, 2017 to June 30, 2018. The contract does not have a set-aside designation. As the Department of the Interior is the funding agency, this contract supports the...
This is a $30,153,967.52 firm-fixed price construction contract awarded by the U.S. Army Corps of Engineers Engineering District Sacramento to Maloney-Odin A Joint Venture, a self-certified small disadvantaged business and HUBZone joint venture, to raise Dikes 1 through 6 at the Folsom Dam in California. The work includes embankment and dike construction, excavation, compaction, concrete work, and utility relocation services. This unrestricted contract was competitively awarded based on price,...

The Department of the Interior Bureau of Reclamation (DOI) awarded a $2,398,645.23 firm fixed price definitive contract to Syblon-Reid CO., doing business as Syblon-Reid Co., to reconstruct portions of the Folsom South Canal (FSC) bank that have experienced slope failures due to bank saturation. The goal of the project is to restore the canal to its original operational condition at the location on the FSC in Rancho Cordova, California. The period of performance for reconstruction services is from May 19, 2023 through May 31, 2023.