Definitive Contract 140P6423C0017
- Not listed
- This is a $17,959,951.98 firm fixed-price definitive contract awarded by the National Park Service to Akron Building & Outdoor Maintenance Inc., a self-certified small disadvantaged business, for riverbank stabilization services at Cuyahoga Valley National Park in Ohio. The contract, which has no set-aside designation, will involve clearing banks, placing riprap, rebuilding banks, planting native vegetation, and site remediation along the Cuyahoga River, Ohio & Erie Canal Towpath...
- This is a $1,070,318.87 firm fixed-price design-build contract awarded by the National Office of the National Park Service (NPS) to SAF Inc., a minority-owned, self-certified small disadvantaged business and SBA-certified HUBZone firm based in Akron, Ohio. The contract is for riverbank stabilization, towpath trail, and Cuyahoga River improvements at the Cuyahoga Valley Scenic Railway in Brecksville, Ohio. This is an 8(a) sole source award with a period of performance through November 30, 2017....
- <p>The Department of the Interior National Park Service Midwest Region awarded a firm fixed price purchase order contract to Akron Building & Outdoor Maintenance Inc., a self-certified small disadvantaged business, for riverbank stabilization work at mile post 55.3. The contract has a potential value of $167,236.56 and a completion date of May 23, 2022. This procurement was set aside for small businesses in its entirety.</p>
- The Department of the Interior National Park Service Midwest Region awarded a $199,143.79 Firm Fixed Price contract to S T X Corp, a Veteran Owned Small Business, for the Railroad Track Maintenance Program at Cuyahoga Valley National Park. The contract, which was set aside for small businesses, involves aligning and tamping 10 miles of railroad track within the park. This work was originally solicited through a pre-solicitation notice that identified a Definitive Contract with a Project...
- The National Park Service awarded a firm fixed price delivery order valued at approximately $946,110 to Bluegrass Contracting Corporation under the Cuyahoga Valley National Park multiple award contract. The delivery order is for rehabilitation of the Station Road Bridge over the Cuyahoga River in Summit and Cuyahoga Counties, Ohio. Funding is provided by the U.S. Department of Transportation Federal Highway Administration to support infrastructure improvements within the national park. The...
- The National Park Service has awarded a $244,000.00 firm-fixed price contract to Ohio Paving & Construction, a small business, for road and parking lot improvement construction at Cuyahoga Valley National Park in Cuyahoga County, Ohio. The work includes patching, a 2-inch asphalt overlay of approximately 112,400 square feet of road and parking lot, repainting of markings, and refurbishment of two under-road culvert systems and one parking lot drainage system. This contract was set aside...
- The National Park Service awarded a $302,957.04 firm-fixed-price contract to Perrin Asphalt Co., a small business located in Akron, Ohio, for asphalt paving work at Cuyahoga Valley National Park. This contract was set aside for small businesses and has a completion date of November 30, 2019. The original solicitation was posted on FedBizOpps with a NAICS code of 237310 (Highway, Street, and Bridge Construction) and a size standard of $36.5 million. The contract was awarded under the Towpath...
- This contract, awarded by the National Park Service (NPS) to The Vallejo Co, is for the repair and resurfacing of the towpath trail at Cuyahoga Valley National Park in Ohio. The work includes grinding and repaving approximately 15,000 linear feet of the towpath, with one section paved to a depth of 4 inches to accommodate heavy equipment used for canal dredging. The contract has a ceiling value of $458,857.34 and is a firm fixed-price definitive contract. This contract was set aside for small...
- <p>The National Park Service has awarded a firm fixed-price definitive contract to Precise Boring of Ohio, LLC, a small business, for the CUVA Sewer Replacement Project at Cuyahoga Valley National Park in Amanda, Ohio. The contract, valued at $132,730.33, is to replace a failing two-inch sanitary force main. This contract was set aside for small businesses. The award was made on August 29, 2019, with a completion date of December 13, 2019.</p>
- The U.S. National Park Service Midwest Region awarded a $16,192.18 firm fixed-price purchase order to Wintrow Construction Corp, a self-certified small disadvantaged and woman-owned business, for railroad repair services at Cuyahoga Valley National Park. The contract, which has a period of performance through August 30, 2024, includes tasks such as railroad tie replacement and track alignment. This award is the latest in a series of federal contracts Wintrow Construction Corp has received for...
The National Park Service awarded a $2,280,000 firm fixed price contract to Akron Building & Outdoor Maintenance Inc. to perform riverbank stabilization work along 1,250 linear feet of riverbank along the Valley Railway within Cuyahoga Valley National Park in Northfield, Ohio. The contract has a completion date of July 15, 2024. As a 100% set-aside for total small businesses, this definitive contract for OTHER CONSTRUCTION, RIVERBANK STABILIZATION PROJECT was awarded under a pre-solicitation notice seeking proposals for labor, materials, and equipment to stabilize sections of riverbank threatened with erosion. Akron Building & Outdoor Maintenance Inc. will deliver the required riverbank stabilization services as the prime contractor for the National Park Service.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Riverbank Stabilization - Valley Railway | 140P6423R0004 | Department of the Interior National Park Service Midwest Region | Pre-Solicitation 1/3 | 4/24/23, 12:55 PM | |
Riverbank Stabilization - Valley Railway | 140P6423R0004 | Department of the Interior National Park Service Midwest Region | Award Notice 3/3 | 8/24/23, 12:34 PM | |
Riverbank Stabilization - Valley Railway | 140P6423R0004 | Department of the Interior National Park Service Midwest Region | Solicitation 2/3 | 5/19/23, 2:49 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Change Order | $0 | 3/1/24 | |
| P00001 | Other Administrative Action | $0 | 10/27/23 | |
| Not listed | Not listed | $2.3m | 8/24/23 |