Definitive Contract 140P6024C0005
- Not listed
- A B Joint Venture, LLC has been awarded a $3.9 million firm fixed price contract by the Department of the Interior National Park Service Midwest Region to rehabilitate the Spring Hill Ranch House and associated stone terrace walls at Tallgrass Prairie National Preserve in Strong City, Kansas. The work includes membrane roofing, metal cornice and balcony restoration, masonry repair and repointing, interior finish restoration, accessibility improvements, site drainage upgrades, and structural...
- The National Park Service awarded a $5.1M firm fixed-price contract to EC Praus LLC, an SBA Certified 8(a) Joint Venture based in Provo, Utah, for construction of the Marquette Greenway Trail at Indiana Dunes National Park in Provo, Utah. The contract, competitively awarded under the 8(a) set-aside program with an ultimate completion date of March 16, 2026, will formalize approximately 2.5 miles of existing gravel trail into a 10-foot-wide asphalt multiuse trail with 2-foot gravel shoulders,...
- The Department of the Interior National Park Service Midwest Region awarded a definitive, firm-fixed price contract worth $166,902.00 to Warfeather, LLC, an SBA-certified 8(a), HUBZone, and self-certified small disadvantaged business, for the TAPR - Spring Hill Ranch Barn Stone Wall Restoration project. This is a Service-Disabled Veteran-Owned Small Business set-aside contract. The project involves deconstructing and reconstructing a mortared stone retaining wall, precast concrete steps,...
- This is a firm fixed-price purchase order awarded by the U.S. government to Dakota Prairie Landscapes, L.L.C., a woman-owned small business, for the Centennial Trail Repair project under the American Recovery and Reinvestment Act (ARRA) of 2009. The $11,639.50 contract is for construction services related to reconditioning roads, replacing culverts, improving drainage crossings, placing aggregate materials, and conducting repairs on recreational infrastructure within the Nebraska National Forest...
- The Department of the Interior National Park Service Midwest Region awarded a $2.6 million firm fixed price contract to BKM Construction LLC to replace the roof structure and vegetated roof system at the Tallgrass Prairie National Preserve Visitor Center and resurface the parking lot. The solicitation sought proposals to renovate the visitor center entry, complete roof replacements, and repair paving at the Tallgrass Prairie National Preserve located in Strong City, Kansas, with a period of...
- This is a Firm Fixed Price definitive contract awarded by the U.S. Department of Agriculture Forest Service to Yorkshire Industries LLC, a Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone) and minority-owned small business. The $549,197.26 contract is funded under the Great American Outdoors Act and involves trailhead upgrades at three locations in the Eldorado National Forest in California. The scope of work includes installing three single-unit...
- Tallgrass Restoration, LLC was awarded a $38,412 firm fixed price delivery order for invasive control services along South Patrol Road at the Midewin National Tallgrass Prairie in Wilmington, Illinois. The award was issued by the USDA Forest Service Eastern Region on December 17, 2015, with a completion date of February 24, 2016. Tallgrass currently holds two Indefinite Delivery Contracts with the Forest Service Eastern Region to provide invasive species control at Midewin Prairie, including a...
- This is a $1,868,397.34 firm-fixed price contract awarded to Terra Site Constructors LLC, a minority-owned small disadvantaged business certified under the SBA 8(a) program, to resurface a segment of the Oxon Cove Trail and add a new pedestrian bridge at Oxon Cove Park and Oxon Hill Farm in Maryland. The contract was set aside for small businesses and was awarded by the National Park Service, a civilian agency under the Department of the Interior. The work must be completed between March 2023...
- This is a $20,291.25 firm fixed price purchase order awarded by the National Park Service's Midwest Region to Prairie Lumber Inc., a small business contractor, for the supply of fencing materials for Theodore Roosevelt National Park in North Dakota. The contract has a July 2024 completion date and was set aside for 100% small business participation. The purchase order was issued under a pre-solicitation notice that announced an upcoming Request for Quotes for these fencing supplies, which...
- The National Park Service awarded a firm-fixed price contract to That Makes Sense, LLC, a small disadvantaged, veteran-owned business located in Buford, Georgia, to install steel I-beams and concrete abutments for a 50-foot trail bridge on the Blackland Prairie section of the Natchez Trace National Scenic Trail in Tupelo, Mississippi. The $49,500.00 contract was set aside for small businesses and has a performance period from July 28, 2025 to October 3, 2025. The contract was awarded on August...
This is a $487,000.00 firm fixed-price definitive contract awarded by the National Park Service's Midwest Region to A 2 Z Provision LLC, a veteran-owned small disadvantaged business, for resurfacing and realigning approximately 2,550 linear feet of gravel trail at the Tallgrass Prairie National Preserve in Kansas. The work includes constructing a 5-foot wide, 5-inch thick concrete slab along the existing trail, realigning portions of the trail away from a nearby creek, and paving parts of a parking lot and seating areas. This contract is set aside for small businesses and is part of the National Park Service's effort to improve accessibility and mitigate erosion issues at the Tallgrass Prairie National Preserve. The project is expected to be completed by April 30, 2025.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
TAPR Resurface Realign Bottomland Trail | 140P6024B0007 | Department of the Interior National Park Service Midwest Region | Pre-Solicitation 2/4 | 3/29/24, 4:35 PM | |
TAPR Resurface Realign Bottomland Trail | 140P6024B0007 | Department of the Interior National Park Service Midwest Region | Award Notice 4/4 | 7/26/24, 11:51 AM | |
Resurface and Realign Bottomland Trail - TAPR | 140P6024B0007 | Department of the Interior National Park Service Midwest Region | Pre-Solicitation 1/4 | 3/8/24, 8:19 PM | |
TAPR Resurface Realign Bottomland Trail | 140P6024B0007 | Department of the Interior National Park Service Midwest Region | Solicitation 3/4 | 6/3/24, 9:24 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Supplemental Agreement for work within scope | $0 | 3/27/25 | |
| P00001 | Supplemental Agreement for work within scope | $0 | 1/28/25 | |
| Not listed | Not listed | $487.0k | 7/26/24 |