This definitive contract for $373,063.71 was awarded by the Department of the Interior National Park Service National Office to Smithgroup, Inc. for architectural and engineering design development and construction document services. Smithgroup, Inc. will provide these services to support restoration of the Dorchester Heights Monument located within the Boston National Historical Park in Washington, D.C. between April 1, 2021 and December 15, 2021 under firm fixed pricing. The original...
The U.S. National Park Service awarded a $30,605,120 firm fixed-price contract to Louis C. Allegrone, Inc., a construction firm with over 100 years of experience in restoration and preservation services, to rehabilitate the terreplein and related levels at the Statue of Liberty National Monument on Liberty Island, New York. This contract, which has a completion date of November 14, 2025, is for the renovation of historic structures and hardscapes within the monument. Louis C. Allegrone, Inc. has...
This is a firm-fixed price contract awarded by the National Park Service (NPS), an agency within the Department of the Interior, to Louis C. Allegrone, Inc., a small business construction firm, for the structural stabilization and restoration of the Robert Gould Shaw and the 54th Regiment Memorial in Boston, Massachusetts. The contract has a potential value of $3,835,138.50 and a completion date of June 18, 2021. The work includes conserving and reinstalling the bronze relief panel, cleaning and...
The Department of the Interior National Park Service National Office awarded a $466,698.78 delivery order contract to Page Southerland Page, Inc. for BOST 254798: TITLE III RESTORE DORCHESTER HEIGHT MONUMENT AND HARDSCAPES- PAGE. The prime contractor Page Southerland Page, Inc. will provide restoration services for the Dorchester Heights Monument and hardscapes located in Washington, D.C. from September 22, 2023 through August 29, 2025. The contract utilizes a time and materials pricing type.
The Department of the Interior National Park Service awarded a firm-fixed-price delivery order contract to Smithgroup, Inc. (doing business as Smithgroupjjr) for the Dorchester Heights Monument Restoration project in Washington, DC. The $278,020.36 contract does not have a set-aside designation and is part of the Dorchester Heights Monument major program. Smithgroup, a professional services firm, has experience providing a range of architecture, engineering, planning, and design services to...
This is a $4,485,414.00 Firm Fixed Price Definitive Contract awarded by the National Office of the National Park Service, a civilian agency, to Louis C. Allegrone, Inc., a small business construction firm, for the rehabilitation of the foundation and supporting walls of the VAMA 161264 project in Hyde Park, NY. The contract has a set-aside designation for total small businesses and was awarded on September 23, 2016 with a completion date of November 17, 2017. Louis C. Allegrone, Inc. has...
The Department of the Interior National Park Service Northeast Region awarded a $120,708 delivery order to KEE Solutions LLC under the Great American Outdoors Act Multiple Award Task Order Contract vehicle. The delivery order is for repointing work at the Bunker Hill Monument Pyramidion and Observatory in Boston, Massachusetts, to be completed between September 2022 and July 2023 on a firm fixed price basis. As part of ongoing preservation efforts, the project entails repointing the...
This is a firm fixed-price delivery order awarded by the Department of the Interior National Park Service Northeast Region to Mills & Schnoering Architects LLC, a small business architecture and historic preservation firm based in Princeton, New Jersey. The $139,133.08 contract is for an architectural conditions assessment and plan for the Dorchester Heights Monument in Thomas Park, Boston, Massachusetts. The task order requires an exterior aerial lift survey, assessment of critical...
This definitive contract for $1,175,794.09 was awarded by the Department of the Interior National Park Service National Office to Tavares LLC for the stabilization of monuments in Boston, Massachusetts. The contract has a period of performance from June 2, 2021 through March 29, 2022 and utilizes a firm fixed price structure. It was set aside under the 8(a) Program for small businesses owned and controlled by socially and economically disadvantaged individuals. Tavares LLC will perform...
This is a $205,885.72 firm fixed-price delivery order awarded by the Department of the Interior National Park Service to Eyp, Inc., an architectural and engineering services firm, for pre-design and schematic design services related to the rehabilitation of hardscapes at Dorchester Heights in Boston, Massachusetts. The work is part of a larger infrastructure renovation program and is not associated with a set-aside contract vehicle. Eyp, Inc. is a subsidiary of WHR Architects, Inc. and has...