Definitive Contract 140F0121C0019

Award Date 6/28/21
Potential Completion Date 9/30/22
Potential Value $1M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Perry, UT 84302, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Fish and Wildlife Service Region 6 has awarded a Firm Fixed Price contract to Trinity Of Utah Inc., doing business as Trinity Construction Services, to construct a water control structure at the Bear River Migratory Bird Refuge in Utah. The $285,429.16 contract requires the demolition of existing concrete walls, construction of new concrete overshot gate support walls, installation of new overshot gates and operators, and installation of a new walkway and handrail. This small business...
This federal contract award, valued at $97,173.97, was issued by the U.S. Department of the Interior Fish and Wildlife Service to Jrock Construction LLC, a small business prime contractor, for the repair of the concrete water tank at the Jones Hole National Fish Hatchery in Vernal, Utah. The contract was set aside for small businesses and is a firm-fixed price purchase order. Jrock Construction LLC is a privately held limited liability company that specializes in concrete construction services...
The Department of the Interior Fish and Wildlife Service awarded a $427,000 firm fixed price contract to Jrock Construction LLC under a total small business set-aside. The contract calls for Jrock Construction to install new 45 mil reinforced flexible polypropylene pond liners in six ponds and reconfigure piping features at six catch basins at the Ouray National Fish Hatchery in Vernal, Utah. This work will fulfill requirements in the original solicitation to replace pond liners and modify...
The Department of the Interior Fish and Wildlife Service awarded Global Engineering Services Inc. a firm fixed price contract valued at thirty-nine thousand and seventy-seven dollars to remove a sound deflector at the Bear River Migratory Bird Refuge in Perry, Utah. The contract has a completion date of December 31, 2023 and was awarded on September 18, 2023 through an unrestricted solicitation posted on July 27, 2023 with proposals due by August 7, 2023. Global Engineering Services Inc. will...
This is a $357,541.98 firm fixed-price definitive contract awarded by the Department of the Interior Fish and Wildlife Service Region 6 to Trinity Of Utah Inc., doing business as Trinity Construction Services. The contract is for the rehabilitation of the Wetland Wonders Walk Trail at the U.S. Fish and Wildlife Service Bear River Migratory Bird Refuge in Box Elder County, Utah. Trinity Construction Services is an Small Business Administration (SBA) certified 8(a), economically disadvantaged...
This federal contract award is for the design and construction of a bunkhouse at the Bear River Migratory Bird Refuge, awarded by the U.S. Department of the Interior Fish and Wildlife Service (FWS) Region 6 to GE JV LLC, a minority-owned small disadvantaged business. The $1,872,310.20 fixed-price delivery order contract is part of the Great American Outdoor Design Bid Build Construction Multiple Award Task Order Contract (MATOC) issued by FWS and the U.S. Forest Service to address deferred...
<p>This is a firm-fixed-price definitive contract awarded by the U.S. Department of the Interior, Fish and Wildlife Service Region 6 to Ray Lavoie Construction for $50,751.00. The contract is for the recovery and accessible sampling deck construction at the Bear River Migratory Bird Refuge in Fernley, Nevada. The contract has no set-aside designation and the ultimate completion date is September 30, 2010. The contract was awarded on January 26, 2010.</p>
This is a firm fixed-price delivery order contract awarded by the U.S. Fish and Wildlife Service, a civilian federal agency, to W.W. Wheeler &amp; Associates, Inc., a for-profit architecture and engineering firm. The contract, valued at $378,409.64, is for the rehabilitation of the Bear River Migratory Bird Refuge in Utah under the agency's Title III dam safety program. The contract does not have a set-aside designation. This delivery order is part of a larger $20 million Indefinite Delivery...
This is a firm fixed-price definitive contract awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 6 to Intermountain Wind And Solar, LLC, a limited liability company, for the installation of a photovoltaic system at the Bear River National Migratory Bird Refuge in Perry, Utah. The contract, which has a ceiling value of $430,846.34, was awarded on April 27, 2010 with a scheduled completion date of June 16, 2011. The contract was not set aside for any special...
<p>This is a firm fixed-price purchase order awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 1 to the small business contractor Thomas Rocks, LLC. The contract is for the repair of the entrance road at the Bear Lake National Wildlife Refuge in Montpelier, Idaho, with a total award value of $89,675.00 and a completion date of July 31, 2019. The contract was set aside for total small business participation.</p>

Jrock Construction LLC has been awarded a firm fixed price definitive contract valued at one million six thousand dollars by the U.S. Department of the Interior Fish and Wildlife Service Region 1 to replace two water control structures at the Bear River Migratory Bird Refuge in Box Elder County, Utah. The contract was awarded through a full and open competition solicitation seeking a contractor to demolish existing concrete walls, install new reinforced concrete walls, place riprap and bedding, and install water control gates, handrails and gratings over a 175-day period. As a total small business set-aside, only small business concerns were eligible to compete. Work will be performed in Perry, Utah through September 2022 to support water management operations at the refuge.