USS Michigan FY19 ERP

Awarded Award Notice Posted

Solicitation number
N4523A19R0801
Agency
Naval Sea Systems Command Department of the Navy, Department of Defense
Awarded
to Imia, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
N4523A-19-C-0801 Federal contract award
NAICS code
336611 Ship Building and Repairing
PSC
Not on record
Place of performance
1400 Farragut Ave Bremerton, Washington 98314, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Awarded Vendors: International Marine and Industrial Applicators, LLC. Contract Award Dollar Amount: $9,297,412.12. Contract Award Date: 2019-07-01.

Update #4 ·

Notice Amendment 11/30/18:
FBO response date revised to reflect extended proposal due date effective per last amendment. Revised solicitation to correct the listed welding requirements in Section C and Section L is also attached..

Update #3 ·

Notice Amendment 11/28/18:
Solicitation response date extedned to 04 December 2018..

Update #2 ·


The Northwest Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bremerton, Washington intends to award a Firm-Fixed-Price, Stand-Alone contract for non-SUBSAFE structural repairs and preservation of exterior hull, superstructure, free floods and main ballast tanks in support of the USS MICHIGAN (SSGN 727) FY19 Extended Refit Period (ERP). Scope of work includes depot level preservation, hull and structural repair; anode removal, sound damping removal and safety track repairs. Contractor will be required to hold Society for Protective Coatings (SSPC) QP-1 certification (either prime or subcontractor).



All interested parties may download the solicitation and amendments at FedBizOpps (FBO), www.fedbizopps.gov. All contractors must be registered and active in the System for Award Management (SAM) www.sam.gov/portal/public/SAM/. The solicitation along with any attachments will only be available electronically at FBO. No telephone or FAX requests will be accepted, and no hard-copy solicitation/amendment will be mailed or faxed.




The Government intends to award a Firm-Fixed Price, stand-alone contract to the responsible contractor on a lowest price technically acceptable source selection in accordance with, but not limited to the Federal Acquisition Regulation (FAR) 15.101-2. The factors and associated sub-factors will be used to evaluate all offeror's Technical, Past Performance, and Price.



All RFP questions shall be submitted to Andrew Skelley, Contracting Specialist, andrew.skelley@navy.mil, by 01 November 2018 @ 2:00 PM (PST).




NOTE: The initial sources sought for this requirement was posted to FBO as solicitation N4523A18R0833.


Notice Amendment #1:
The anticipated period of performance is: Ten and a half (10.5) months, commencing on/around 28 May 2019. The dates provided in the Work Specification Package (Attachment J-1) are tentative. The date range of the period of performance will remain constant, however the Government reserves the right to adjust the start date four (4) to eight (8) weeks beyond 28 May 2019, through an amended Work Specification Package.
Responses to Bidder's Questions #1-7 attached.
Bidder's questions due date extended to 15 November 2018.
Solicitation response date extended to 30 November 2018.


.

Update #1 ·


The Northwest Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bremerton, Washington intends to award a Firm-Fixed-Price, Stand-Alone contract for non-SUBSAFE structural repairs and preservation of exterior hull, superstructure, free floods and main ballast tanks in support of the USS MICHIGAN (SSGN 727) FY19 Extended Refit Period (ERP). Scope of work includes depot level preservation, hull and structural repair; anode removal, sound damping removal and safety track repairs. Contractor will be required to hold Society for Protective Coatings (SSPC) QP-1 certification (either prime or subcontractor).



All interested parties may download the solicitation and amendments at FedBizOpps (FBO), www.fedbizopps.gov. All contractors must be registered and active in the System for Award Management (SAM) www.sam.gov/portal/public/SAM/. The solicitation along with any attachments will only be available electronically at FBO. No telephone or FAX requests will be accepted, and no hard-copy solicitation/amendment will be mailed or faxed.



The anticipated period of performance is: Ten and a half (10.5) months, commencing on/around 29 April 2019. The dates provide in the Work Specification Package (Attachment J-1) are tentative. The date range of the period of performance will remain constant, however the Government reserves the right to adjust the start and end performance dates listed through an amended Work Specification Package.



The Government intends to award a Firm-Fixed Price, stand-alone contract to the responsible contractor on a lowest price technically acceptable source selection in accordance with, but not limited to the Federal Acquisition Regulation (FAR) 15.101-2. The factors and associated sub-factors will be used to evaluate all offeror's Technical, Past Performance, and Price.



All RFP questions shall be submitted to Andrew Skelley, Contracting Specialist, andrew.skelley@navy.mil, by 01 November 2018 @ 2:00 PM (PST).



NOTE: The initial sources sought for this requirement was posted to FBO as solicitation N4523A18R0833.


.

Attachments

Files attached to this notice, newest first
File Type Posted
N4523A19R0801__Amendment_7_Summary.pdf PDF
N4523A19R0801_Revised_Solicitation_11-30.pdf PDF
N4523A19R0801__Amendment_6_Summary.pdf PDF
N4523A19R0801_Solicitation_Amendment_11-28.pdf PDF
N4523A19R0801__Amendment_5.pdf PDF
USS_MICHIGAN_FY19_ERP_-_ERRATA_2.pdf PDF
N4523A19R0801__Amendment_4_Answer_To_Bidder's_Questions.pdf PDF
N4523A19R0801__Amendment_3.pdf PDF
USS_MICHIGAN_FY19_ERP-_ERRATA_1.pdf PDF
DI-MISC-81940_Welding_Qualification_and_Training_Program.pdf PDF
A031_CDRL__Weld_Qualification_and_Training_Program-signed.pdf PDF
N4523A19R0801_Solicitation_Amendment_11-17.pdf PDF
Revised_N4523A19R0801.pdf PDF
Attachment_J3_Request_for_Clarification_Revised_10-31.docx DOCX document
N4523A19R0801__Amendment_2_Answer_To_Bidder's_Questions.docx DOCX document
N4523A19R0801__Amendment_1_Answer_To_Bidder's_Questions.docx DOCX document
Attachment_J4_Pricing_Volume_for_Solicitation.xlsx XLSX spreadsheet
Attachment_J2_Badging.pdf PDF
Attachment_J3_Request_for_Clarification.pdf PDF
Combined_CDRL_Package.pdf PDF
Attachment_J5_Previous_Efforts_Form.doc DOC document
N4523A19R0801.pdf PDF
Combined_DIDs_Package.pdf PDF
Attachment_J6_Government_Property.pdf PDF
Attachment_J1_USS_Michigan_FY19_ERP-_Contract_Package.pdf PDF
Show all 25

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
USS Michigan FY19 ERP This notice · Award Award Notice
USS michigan (ssgn 727) FY19 ERP Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity