Answers to Bidders' Questions #26 through #33
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USS MICHIGAN ERP
N4523A19R0801
# N4523A19R0801 Dated 15 OCT 2018
Amendment 4 Answer to Bidder’s Questions
Bidder’s Question #26:
Please clarify who (PSNS, Ship, Contractor) is responsible for open/cleaning of all tanks?
Answer: PSNS will open and perform the initial wash-down of the tanks.
Bidder’s Question #27:
Please clarify if the contractor should assume that the government will be removing and reinstalling the lead in the ballast tanks?
Answer: There is no requirement for lead to be removed or reinstalled by the contractor.
Bidder’s Question #28:
When comparing Work Items 524-10-001 and 524-10-002, there are inconsistencies between the paragraphs. 002 does not have paragraphs 3.3.2 and 3.5 while Work Item 524-10-001 includes these paragraphs. Is this the intent?
Answer: Work Item 524-10-002 is missing paragraph 3.3.2 and 3.5. These paragraphs will mirror work item
524-10-001 and will be corrected in an Errata.
Bidder’s Question #29:
In Work Items 636-11-001/002/003 we believe the first paragraph of 4.3 should read "Damping tiles removed are expected to be < (LESS THAN) 10% of the total damping in the tank." vice the current > (GREATER THAN). Is this correct?
Answer: Work Items 636-11-001/002/003 will be corrected on an Errata to state: “Damping tiles removed are expected to be < (LESS THAN) 10% of the total damping in the tank.”
Bidder’s Question #30:
As we are processing preservation between SP-6 and SP-10, will the contractor be able to leave equipment inside the dock or will we have to mob/demob in between?
Answer: It is the intent to leave the preservation equipment in the dry-dock during the entire preservation process.
Bidder’s Question #31:
Please clarify on Work Item 992-10-001 para 3.5.1, how much of the 5000 Amp power is expected to be left over?
Answer: 5000 Amps is what will be available for the contractors use during contract execution.
USS MICHIGAN ERP
N4523A19R0801
Bidder’s Question #32:
Please clarify on Work Item 992-10-001, para 3.1.1 states approximately 10 X 20 feet available for stackable trailers. How much additional room is potentially available (we have vendors that offer 20 x 8' office trailers but require 16' wide for double stack)
Answer: Paragraph 3.5.4 of work item 992-10-001 states PSNS&IMF will provide Pier lay down area of 1510 sq.
ft. Office trailers should be approximately 10 X 20 feet, stackable to utilize space. There is no requirement for number of trailers.
Bidder’s Question #33:
With respect to the requirements of UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions Enclosure (2)
(referenced in multiple work items), what is the expected square footage to be estimated? Would it be prudent to bid this using the area in paragraph 3.3.2.1 of 042-10-001?”
Answer: Weld repair estimated square footage is listed in work item 042-10-001. Paragraph 3.3.2.1 states:
“Accomplish 56,720 square inches of weld repair to be distributed on the following work items 111-11-001, 111-
11-002, 123-11-001, 123-11-002, 123-11-003 , 151-11-001, 151-11-002, 524- 10-001, 524-10-002, 528-10-001, and
528-10-002, based on PSNS structural inspection results.”
END OF BIDDERS QUESTIONS:
End of Amendment 4.