USS_MICHIGAN_FY19_ERP_-_ERRATA_2.pdf
PDF 1019 KB Posted
- Attached to
- USS Michigan FY19 ERP Federal contract opportunity
- Solicitation number
- N4523A19R0801
About this file
N4523A19R0801 Work Specification Package ERRATA 2
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS MICHIGAN (SSGN 727)
NWRMC-501-19
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
123-11-001
111-11-002
524-10-002
123-11-002
528-10-002
151-11-001
123-11-003
528-10-001
151-11-002
524-10-001
DATED: 11/20/2018 11:08:23AMPage 1 of 1
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 111-11-002 (E2)
COAR: 16 PCN: SSPS-L005
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
1. SCOPE:
1.1 Title: Superstructure Group 10; repair
1.2 Location of Work:
1.2.1 Superstructure Group 10 Frame 105 to Frame 118
1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations and non-watertight access hatches)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs
2.5 111-4642859 Rev D, Superstructure Main Deck Frames 93-106
2.6 111-4642846 Rev G, Superstructure Frames 93-106
2.7 111-4642860 Rev E, Superstructure Main Deck Frames 107-117
2.8 111-4642849 Rev G, Superstructure Frames 107-117
2.9 111-4775429 Rev F, Superstructure Frames 118-AFT
2.10 111-4642861 Rev F, Superstructure Main Deck Frames 118-AFT
2.11 111-4642835 Rev C, Superstructure Typical Details
2.12 113-4789068 Rev H, 113-4789068 Rev H, FDN Cleat Box Aft
2.13 113-4789212 Rev D, FDN Cleat Box Aft Details Sheet 02
2.14 123-4642952 Rev H, Superstructure Hatch & Fitting – Matl and Gen Notes
2.15 123-4642953 Rev F, Superstructure Hatch & Fitting – Arrangement & Details
2.16 111-6558972 Rev B, TLA superstructure Mods Fr 105-114
2.17 7550683 Rev A, ShipAlt 0548 SSGN Class 6” CM Misc Ext Mod
2.18 SMS 1510-081-005, Insp Superstructure and Fairwater Non-watertight Access Hatches and Cvrs
2.19 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
2.20 SMS 6350-081-001, Inspect; repair vibration damping.
2.21 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION
SSP: NWRMC-501-19 2 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
DETAILS
2.22 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &
SUPERSTRUCTURE
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment- A and provide repair plan to the SUPERVISOR, prior to start for production work.
3.1.1 Submit one legible copy, in approved transferrable media, of the repair plan identified in 3.1 to the SUPERVISOR.
3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4 using 2.5 through 2.17 for guidance.
3.2.1 Template exact sizes, locations, and configurations from existing shipboard conditions prior to removal and re-installation to ensure clearances are maintained.
3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.
3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to
SUPERVISOR.
3.2.4 Notify the Supervisor and provide PSNS access to surfaces of the superstructure after repairs are complete but prior to final blast and paint to remap the surfaces.
3.2.5 Accomplish repairs to the re-mapped surfaces not accepted by PSNS in accordance with 2.1 through 2.4 using 2.5 through 2.17 for guidance.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.6 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 After completion of weld repairs at the location listed in Attachment A.
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.7 Accomplish nondestructive magnetic particle testing in
accordance with 2.2. through 2.4.
3.2.7.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.8 Submit one legible copy, in approved transferrable media, of final repair report Attachment A, and any Objective Quality Evidence (OQE) required by 2.2 and 2.3 to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.21 and 2.22.
SSP: NWRMC-501-19 3 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
3.3.1 Do NOT grind below the valleys of the welded areas.
3.4 Accomplish the requirements of 2.19 Enclosure (2) for Strip back distances for heat sensitive material.
3.5 Accomplish fit-up and installation of all the non-watertight access covers identified in 2.14 thru 2.17 after repairs, to ensure the Noise Requirements of 2.18 are met.
4. NOTES:
4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 PSNS will provide initial mapping measurements of Superstructure groups 2 and 10 to the contractor.
4.3 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.
4.3.1 PSNS engineering requires 48 hour advance notice for POA inspections.
4.4 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.
4.5 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.
4.6 Contractor will procure materials not listed in paragraph 5 of work item 992-10-001 to accomplish the work as defined in this work item.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE INSTRUCTIONS
N4523A-17-C-0001
Repair actions shall be circled in the Repair Action Column for each type of defect. Several repair actions may be required to accomplish repairs.
Repair Action Definitions
MT: MT satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
For these specific types of defects, the following Repair Actions are required and shall be annotated/circled in the Repair Action Column as being accomplished:
Cracks:
Cracks shall be verified by MT inspection. Cracks verified by MT shall be cleared by grinding and a satisfactory MT accomplished. Based on excavation LxWxD, weld repair may or may not be required (MT / WR or MT / WRNR)
Cracks verified MT Sat prior to excavation and do not require any additional action shall be annotated as such. (MT / WRNR)
Deformations:
Deformed structure may be straightened, weld repaired, or replaced. ( S or WR or Rep)
The final Length (L:), Width (W:), and Depth (D:) shall be documented in the Final Repair Length, Width, & Depth Column for each defect.
If items are combined due to location and ease of repair, a positive statement shall be made in the remarks section identifying all sites that were combined. Remark will be made in each site that is affected.
SSP: NWRMC-501-19 5 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE
N4523A-17-C-0001
XXXXX‐XXXXX‐XXX
Noun Name Repair
Page _ of _
Site No. Defect Description/Location Repair Action: (Circle all that apply) Final Repair Length, Width, & Depth Signature, Badge, Date Remarks:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
SSP: NWRMC-501-19 6 of 6 ITEM NO: 111-11-002
ERRATA NO. 2
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT: MT Satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
GAS FREE CERTIFICATION REQUIRED
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 123-11-001 (E2)
COAR: 16 PCN: SSPS-L006
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
HOSKINS, JENNIFER
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 1A; repair
1.2 Location of Work:
1.2.1 MBT 1A
1.2.1.1 MBT (plating and framing to include hangers, hand grabs, foundations)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs
2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27
2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS
2.7 101-4640631 Rev H, CENTERLINE LONG'L BHD FRAMES 4-15
2.8 101-4640625 Rev H, MBT 1A & 1B BHD FRAMES 4, 5, & 6
2.9 101-4640626 Rev C, NON PRESSURE HULL FRAMES 7, 8, & 9
2.10 101-4640627 Rev F, MBT BHD 10 & NP HULL FR 11
2.11 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
2.12 SMS 6350-081-001, Inspect; repair vibration damping
2.13 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION
DETAILS
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
3.1.1 Submit one legible copy, in approved transferrable media, of the repair plan identified in 3.1 to the SUPERVISOR.
SSP: NWRMC-501-19 2 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4, using 2.5 through 2.10 for guidance.
3.2.1 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.
3.2.2 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to
SUPERVISOR.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.3 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 After completion of weld repairs at the location listed in Attachment A
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.4 Accomplish nondestructive magnetic particle testing in
accordance with 2.2.through 2.4.
3.2.4.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.5 Submit one legible copy, in approved transferrable media, of final repair report Attachment A, and any Objective Quality Evidence (OQE) required by 2.2 and 2.3 to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Accomplish the requirements of 2.11 Enclosure (2) for strip back distances for heat sensitive material.
3.4 Remove existing insulation and sound damping in way of weld repairs from each location listed in 1.2, using 2.12 for guidance.
3.4.1 Remove all tile/insulation remnants, glue and corrosion products.
3.4.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.
3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.13.
3.5.1 Do NOT grind below the valleys of the welded areas.
4. NOTES:
4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.
4.2.1 PSNS engineering requires 48 hour advance notice for POA
SSP: NWRMC-501-19 3 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
inspections.
4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.
4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.
4.5 Contractor will procure materials not listed in paragraph 5 of work item 992-10-001 to accomplish the work as defined in this work item.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE INSTRUCTIONS
N4523A-17-C-0001
Repair actions shall be circled in the Repair Action Column for each type of defect. Several repair actions may be required to accomplish repairs.
Repair Action Definitions
MT: MT satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
For these specific types of defects, the following Repair Actions are required and shall be annotated/circled in the Repair Action Column as being accomplished:
Cracks:
Cracks shall be verified by MT inspection. Cracks verified by MT shall be cleared by grinding and a satisfactory MT accomplished. Based on excavation LxWxD, weld repair may or may not be required (MT / WR or MT / WRNR)
Cracks verified MT Sat prior to excavation and do not require any additional action shall be annotated as such. (MT / WRNR)
Deformations:
Deformed structure may be straightened, weld repaired, or replaced. ( S or WR or Rep)
The final Length (L:), Width (W:), and Depth (D:) shall be documented in the Final Repair Length, Width, & Depth Column for each defect.
If items are combined due to location and ease of repair, a positive statement shall be made in the
SSP: NWRMC-501-19 5 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE
N4523A-17-C-0001
XXXXX‐XXXXX‐XXX
Noun Name Repair
Page _ of _
Site No. Defect Description/Location Repair Action: (Circle all that apply) Final Repair Length, Width, & Depth Signature, Badge, Date Remarks:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
SSP: NWRMC-501-19 6 of 6 ITEM NO: 123-11-001
ERRATA NO. 2
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT: MT Satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 123-11-002 (E2)
COAR: 16 PCN: SSPS-L007
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 2A; repair
1.2 Location of Work:
1.2.1 MBT 2A
1.2.1.1 MBT (plating and framing to include hangers, hand grabs, foundations)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs
2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27
2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS
2.7 101-4640631 Rev H, CENTERLINE LONG'L BHD FRAMES 4-15
2.8 101-4640627 Rev F, MBT BHD 10 & NP HULL FR 11
2.9 101-4640628 Rev F, NON PRESSURE HULL FRAMES 12, 13, & 14
2.10 101-4640629 Rev F, MAIN BALLAST TANK BULKHEAD 15 AND NON-PRESSURE
HULL FRAME 16
2.11 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
2.12 SMS 6350-081-001, Inspect; repair vibration damping
2.13 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION
DETAILS
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
the repair plan identified in 3.1 to the SUPERVISOR.
SSP: NWRMC-501-19 2 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4, using 2.5 through 2.10 for guidance.
3.2.1 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.
3.2.2 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to
SUPERVISOR.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.3 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 After completion of weld repairs at the location listed in Attachment A
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.4 Accomplish nondestructive magnetic particle testing in
accordance with 2.2. through 2.4.
3.2.4.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.5 Submit one legible copy, in approved transferrable media, of final repair report Attachment A, and any Objective Quality Evidence (OQE) required by 2.2 and 2.3 to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Accomplish the requirements of 2.11 Enclosure (2) for strip back distances for heat sensitive material.
3.4 Remove existing insulation and sound damping in way of weld repairs from each location listed in 1.2, using 2.12 for guidance.
3.4.1 Remove all tile/insulation remnants, glue and corrosion products.
3.4.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.
3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.13.
3.5.1 Do NOT grind below the valleys of the welded areas.
4. NOTES:
4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.
4.2.1 PSNS engineering requires 48 hour advance notice for POA
SSP: NWRMC-501-19 3 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
inspections.
4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.
4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.
4.5 Contractor will procure materials not listed in paragraph 5 of work item 992-10-001 to accomplish the work as defined in this work item.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE INSTRUCTIONS
N4523A-17-C-0001
Repair actions shall be circled in the Repair Action Column for each type of defect. Several repair actions may be required to accomplish repairs.
Repair Action Definitions
MT: MT satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
For these specific types of defects, the following Repair Actions are required and shall be annotated/circled in the Repair Action Column as being accomplished:
Cracks:
Cracks shall be verified by MT inspection. Cracks verified by MT shall be cleared by grinding and a satisfactory MT accomplished. Based on excavation LxWxD, weld repair may or may not be required (MT / WR or MT / WRNR)
Cracks verified MT Sat prior to excavation and do not require any additional action shall be annotated as such. (MT / WRNR)
Deformations:
Deformed structure may be straightened, weld repaired, or replaced. ( S or WR or Rep)
The final Length (L:), Width (W:), and Depth (D:) shall be documented in the Final Repair Length, Width, & Depth Column for each defect.
If items are combined due to location and ease of repair, a positive statement shall be made in the
SSP: NWRMC-501-19 5 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE
N4523A-17-C-0001
XXXXX‐XXXXX‐XXX
Noun Name Repair
Page _ of _
Site No. Defect Description/Location Repair Action: (Circle all that apply) Final Repair Length, Width, & Depth Signature, Badge, Date Remarks:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
SSP: NWRMC-501-19 6 of 6 ITEM NO: 123-11-002
ERRATA NO. 2
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT: MT Satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 123-11-003 (E2)
COAR: 16 PCN: SSPS-L008
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 3A; repair
1.2 Location of Work:
1.2.1 MBT 3A
1.2.1.1 MBT (plating and framing to include hangers, hand grabs, foundations)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs
2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27
2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS
2.7 101-4640630 Rev G, NON-PRESSURE HULL 17, 18, 19
2.8 101-4640632 Rev G, CL LONG BHD FRS 15 – 25
2.9 101-4640558 Rev L, PRESSURE HULL FRS 23 – 25
2.10 100-4642351 Rev E, PENETRATIONS NON PRESSURE HULL BOW FR 94 DETAILS
2.11 515-4695737 Rev E, MBT 1, 2 & 3 VENT VALVE HOUSING & DETAIL – SSBN
TRIDENT CLASS
2.12 101-4640634 Rev E, NON PRESSURE HULL FRS 20 – 22
2.13 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
2.14 SMS 6350-081-001, Inspect; repair vibration damping
2.15 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION
DETAILS
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
SSP: NWRMC-501-19 2 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
3.1.1 Submit one legible copy, in approved transferrable media, of the repair plan identified in 3.1 to the SUPERVISOR.
3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4, using 2.5 through 2.12 for guidance.
3.2.1 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.
3.2.2 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to
SUPERVISOR.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.3 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 After completion of weld repairs at the location listed in Attachment A.
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.4 Accomplish nondestructive magnetic particle testing in
accordance with 2.2 through 2.4.
3.2.4.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.5 Submit one legible copy, in approved transferrable media, of final repair report Attachment A, and any Objective Quality Evidence (OQE) required by 2.2 and 2.3 to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Accomplish the requirements of 2.13 Enclosure (2) for strip back distances for heat sensitive material.
3.4 Remove existing insulation and sound damping in way of weld repairs from each location listed in 1.2, using 2.14 for guidance.
3.4.1 Remove all tile/insulation remnants, glue and corrosion products.
3.4.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.
3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.15.
3.5.1 Do NOT grind below the valleys of the welded areas.
4. NOTES:
4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be
SSP: NWRMC-501-19 3 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
accomplished by PSNS of the area under the tile/insulation.
4.2.1 PSNS engineering requires 48 hour advance notice for POA inspections.
4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.
4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.
4.5 Contractor will procure materials not listed in paragraph 5 of work item 992-10-001 to accomplish the work as defined in this work item.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE INSTRUCTIONS
N4523A-17-C-0001
Repair actions shall be circled in the Repair Action Column for each type of defect. Several repair actions may be required to accomplish repairs.
Repair Action Definitions
MT: MT satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
For these specific types of defects, the following Repair Actions are required and shall be annotated/circled in the Repair Action Column as being accomplished:
Cracks:
Cracks shall be verified by MT inspection. Cracks verified by MT shall be cleared by grinding and a satisfactory MT accomplished. Based on excavation LxWxD, weld repair may or may not be required (MT / WR or MT / WRNR)
Cracks verified MT Sat prior to excavation and do not require any additional action shall be annotated as such. (MT / WRNR)
Deformations:
Deformed structure may be straightened, weld repaired, or replaced. ( S or WR or Rep)
The final Length (L:), Width (W:), and Depth (D:) shall be documented in the Final Repair Length, Width, & Depth Column for each defect.
If items are combined due to location and ease of repair, a positive statement shall be made in the
SSP: NWRMC-501-19 5 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE
N4523A-17-C-0001
XXXXX‐XXXXX‐XXX
Noun Name Repair
Page _ of _
Site No. Defect Description/Location Repair Action: (Circle all that apply) Final Repair Length, Width, & Depth Signature, Badge, Date Remarks:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
SSP: NWRMC-501-19 6 of 6 ITEM NO: 123-11-003
ERRATA NO. 2
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT: MT Satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 151-11-001 (E2)
COAR: 16 PCN: SSPS-L046
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 5 ITEM NO: 151-11-001
ERRATA NO. 2
1. SCOPE:
1.1 Title: Group 2 Safety Track; repair
1.2 Location of Work:
1.2.1 Main Deck Safety Track, Frames 62-71 (Group 2)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) 7650-081-091 Rev D, Chg 3, Submarine Structural Inspection and Repairs
2.5 111-4642856 Rev G, SSBN Trident Class Superstructure Main Deck Frs 51 to 83
2.6 605-4645173 Rev J, SSBN Trident Class Label Plates Structural
2.7 605-4645174 Rev K, SSBN Trident Class Label Plates Structural
2.8 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION DETAILS
2.9 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &
SUPERSTRUCTURE
2.10 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
3.1.1 Submit one legible copy, in approved transferrable media, of the repair plan identified in 3.1 to the SUPERVISOR.
3.2 Accomplish repairs identified using Attachment A in accordance with
2.1 through 2.4 using 2.5 through 2.7 for guidance.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.1 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 after completion of weld repairs at the location listed in Attachment A.
SSP: NWRMC-501-19 2 of 5 ITEM NO: 151-11-001
ERRATA NO. 2
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.2 Accomplish nondestructive magnetic particle testing in
accordance with 2.2 through 2.4.
3.2.2.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.3 Paint used in the manufacturing of Label plates shall be in accordance with MIL-PRF-24635, Type 2, Class 1, Grade A.
3.2.4 Submit one legible copy, in approved transferrable media, of a report to include Attachment A and any additional OQE required by 2.2 and 2.3, to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.8 and 2.9.
3.3.1 Do NOT grind below the valleys of the welded areas.
3.4 Accomplish the requirements of 2.10 Enclosure (2) for Strip back distances for heat sensitive material.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Puget Sound Naval Shipyard (PSNS) will provide a list of areas requiring repair to the contractor using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Procure material not already identified as Government Furnished Material (GFM) in paragraph 5 of work item 992-10-001 to accomplish this work.
4.3 Preservation of the repaired Safety Track will be on a separate Work Item.
4.4 PSNS will perform the Strength Pull Test and Operational Test of the repaired safety track.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 3 of 5 ITEM NO: 151-11-001
ERRATA NO. 2
USS MICHIGAN FY19
ERP
Column 1: Site No.
ATTACHMENT A ‐ REPAIR/REPLACE TABLE INSTRUCTIONS
Record Site No. using a unique site designator (e.g. 01, 02, 03, ect)
Column 2:
Column 3:
Defect Description/Location
Record a brief description of defect along with location and length of defect indexed from nearest frame.
Repair Action
Circle either Repair, Safety Track stays in place repaired via weld or Replace, UNSAT Safety Track removed and replaced with manufactured track.
Column 4:
Column 5:
Repair/Replace
Record Length (L). Width (W), and Depth (D) for repair or just Length for replacement of track.
NDT Requirements
Circle required NDT inspections: VT and/or MT
Column 6: Sign Off
Sign offs for Inspection results and accomplishing repairs
Column 7: Remarks
Add notes as needed.
*NOTE: Width and Depth not required for replacement of Safety Track
USS MICHIGAN FY19
ERP
ATTACHMENT A ‐ REPAIR TABLE SAFETY TRACK
Safety Track Repair Page
_ of _
Site No. Defect Description/Location Repair Action:
(Circle one)
Repair/Replace:
Length, *Width, & *Depth
NDT (Circle all that Apply):
Signature, Badge, Date Remarks:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
USS MICHIGAN FY19
ERP
ATTACHMENT A ‐ REPAIR TABLE SAFETY TRACK Safety Track Repair Page
_ of _
Site No. Defect Description/Location Repair Action:
(Circle one)
Repair/Replace:
Length, *Width, & *Depth
NDT (Circle all that Apply):
Signature, Badge, Date Remarks:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 151-11-002 (E2)
COAR: 16 PCN: SSPS-L047
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 151-11-002
ERRATA NO. 2
1. SCOPE:
1.1 Title: Group 10 Safety Track; repair
1.2 Location of Work:
1.2.1 Main Deck Safety Track, Frames 105-118 (Group 10)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , FY19
2.2 T9074-AD-GIB/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) 7650-081-091 Rev D, Chg 3, Submarine Structural Inspection and Repairs
2.5 600-4694412 Rev B, SSBN Trident Class Topside Safety Track Extension
2.6 111-6558972 Rev B, SSBN Trident Class TLA Superstructure Modifications Frames 105-114
2.7 111-4642859 Rev D, SSBN Trident Class Superstructure Main Deck FRs 93-106
2.8 111-4642860 Rev E, SSBN Trident Class Superstructure Main Deck Frs 107 to 117
2.9 111-4642861 Rev F, SSBN Trident Class Superstructure Main Deck Frs
118-AFT
2.10 605-4645173 Rev J, SSBN Trident Class Label Plates Structural
2.11 605-4645174 Rev K, SSBN Trident Class Label Plates Structural
2.12 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION
DETAILS
2.13 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &
SUPERSTRUCTURE
2.14 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
SSP: NWRMC-501-19 2 of 6 ITEM NO: 151-11-002
ERRATA NO. 2
the repair plan identified in 3.1 to the SUPERVISOR.
3.2 Accomplish repairs identified using Attachment A in accordance with
2.1 through 2.4 using 2.5 through 2.11 for guidance.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.1 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 after completion of weld repairs at the location listed in Attachment A.
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.2 Accomplish nondestructive magnetic particle testing in
accordance with 2.2 through 2.4.
3.2.2.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.3 Paint used in the manufacturing of Label plates shall be in accordance with MIL-PRF-24635, Type 2, Class 1, Grade A.
3.2.4 Submit one legible copy, in approved transferrable media, of a report to include Attachment A and any additional OQE required by 2.2, to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.12 and 2.13.
3.3.1 Do NOT grind below the valleys of the welded areas.
3.4 Accomplish the requirements of 2.14 Enclosure (2) for Strip back distances for heat sensitive material.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Puget Sound Naval Shipyard (PSNS) will provide a list of areas requiring repair to the contractor using Attachment A.
4.1.1 Repair site square inches reported via attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Procure material not already identified as Government Furnished Material (GFM) in work item 992-10-001 to accomplish this work.
4.3 Preservation of the repaired Safety Track will be on a separate Work Item.
4.4 PSNS will perform the Strength Pull Test and Operational Test of the repaired safety track.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
SSP: NWRMC-501-19 3 of 6 ITEM NO: 151-11-002
ERRATA NO. 2
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 151-11-002
ERRATA NO. 2
USS MICHIGAN FY19
ERP
Column 1: Site No.
ATTACHMENT A ‐ REPAIR/REPLACE TABLE INSTRUCTIONS
Record Site No. using a unique site designator (e.g. 01, 02, 03, ect)
Column 2:
Column 3:
Defect Description/Location
Record a brief description of defect along with location and length of defect indexed from nearest frame.
Repair Action
Circle either Repair, Safety Track stays in place repaired via weld or Replace, UNSAT Safety Track removed and replaced with manufactured track.
Column 4:
Column 5:
Repair/Replace
Record Length (L). Width (W), and Depth (D) for repair or just Length for replacement of track.
NDT Requirements
Circle required NDT inspections: VT and/or MT
Column 6: Sign Off
Sign offs for Inspection results and accomplishing repairs
Column 7: Remarks
Add notes as needed.
USS MICHIGAN FY19
ERP
ATTACHMENT A ‐ REPAIR TABLE SAFETY TRACK
Safety Track Repair Page
_ of _
Site No. Defect Description/Location Repair Action:
(Circle one)
Repair/Replace:
Length, *Width, & *Depth
NDT (Circle all that Apply):
Signature, Badge, Date Remarks:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
USS MICHIGAN FY19
ERP
ATTACHMENT A ‐ REPAIR TABLE SAFETY TRACK Safety Track Repair Page
_ of _
Site No. Defect Description/Location Repair Action:
(Circle one)
Repair/Replace:
Length, *Width, & *Depth
NDT (Circle all that Apply):
Signature, Badge, Date Remarks:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
Repair / Replace L: W: D: VT / MT
Repair:
Inspect:
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 524-10-001 (E2)
COAR: 16 PCN: SSPS-L011
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
LEWIS, ANNA
SSP: NWRMC-501-19 1 of 6 ITEM NO: 524-10-001
ERRATA NO. 2
1. SCOPE:
1.1 Title: Auxiliary Tank 1 (AUX-1); repair
1.2 Location of Work:
1.2.1 AUX Tank 1
1.2.1.1 Tank plating and framing to include hangers, hand grabs, foundations
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY19
2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes
2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs
2.5 520-4687596 Rev C, Manhole Structural Inspection and Repairs
2.6 115-4677726 Rev K, Tank Auxiliary No. 1
2.7 115-4677725 Rev F, Tank Auxiliary Notes & L/M
2.8 SMS 6350-081-001, Inspect; repair vibration damping
2.9 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION DETAILS
2.10 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions
3. REQUIREMENTS:
(V)(G) "VERIFY ATTACHMENT A"
3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment A and provide repair plan to the SUPERVISOR, prior to start for production work.
3.1.1 Submit one legible copy, in approved transferrable media, of the repair plan identified in 3.1 to the SUPERVISOR.
3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4, using 2.5 through 2.7 for guidance.
3.2.1 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.
3.2.2 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to
SSP: NWRMC-501-19 2 of 6 ITEM NO: 524-10-001
ERRATA NO. 2
SUPERVISOR.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.2.3 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 and 2.3 After completion of weld repairs at the location listed in Attachment A.
(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.2.4 Accomplish nondestructive magnetic particle testing in
accordance with 2.2 through 2.4.
3.2.4.1 Submit one legible copy, in approved transferrable
media, of the results of the magnetic particle testing inspections upon completion.
3.2.5 Submit one legible copy, in approved transferrable media, of final repair report Attachment A, and any Objective Quality Evidence (OQE) required by 2.2 and 2.3 to the SUPERVISOR within 72 hours after completion of the repairs.
3.3 Remove existing insulation and sound damping in way of weld repairs from each location listed in 1.2, using 2.8 for guidance.
3.3.1 Remove all tile/insulation remnants, glue and corrosion products.
3.3.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.
3.4 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.9.
3.4.1 Do NOT grind below the valleys of the welded areas.
3.5 Accomplish the requirements of 2.10 Enclosure (2) for strip back distances for heat sensitive material.
4. NOTES:
4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment A.
4.1.1 Repair site square inches reported via Attachment A will be deducted from the overall total square inches listed in the 042-01- 001 042-10-001 work item.
(E2)
4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.
4.2.1 PSNS engineering requires 48 hour advance notice for POA inspections.
4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until Puget Sound Naval Shipyard (PSNS) Code 250VS engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.
4.4 PSNS engineering requires 3 working days to complete review after
SSP: NWRMC-501-19 3 of 6 ITEM NO: 524-10-001
ERRATA NO. 2
final repairs are completed and Attachment A is submitted.
4.5 Contractor will procure materials not listed in paragraph 5 of 992- 10-001 to accomplish the work as defined in this work item.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: NWRMC-501-19 4 of 6 ITEM NO: 524-10-001
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE INSTRUCTIONS
N4523A-17-C-0001
Repair actions shall be circled in the Repair Action Column for each type of defect. Several repair actions may be required to accomplish repairs.
Repair Action Definitions
MT: MT satisfactory S: Straightened REP: Replaced WRNR: Weld Repair Not Required WR: Weld Repaired
For these specific types of defects, the following Repair Actions are required and shall be annotated/circled in the Repair Action Column as being accomplished:
Cracks:
Cracks shall be verified by MT inspection. Cracks verified by MT shall be cleared by grinding and a satisfactory MT accomplished. Based on excavation LxWxD, weld repair may or may not be required (MT / WR or MT / WRNR)
Cracks verified MT Sat prior to excavation and do not require any additional action shall be annotated as such. (MT / WRNR)
Deformations:
Deformed structure may be straightened, weld repaired, or replaced. ( S or WR or Rep)
The final Length (L:), Width (W:), and Depth (D:) shall be documented in the Final Repair Length, Width, & Depth Column for each defect.
If items are combined due to location and ease of repair, a positive statement shall be made in the
SSP: NWRMC-501-19 5 of 6 ITEM NO: 524-10-001
ERRATA NO. 2
ATTACHMENT A - REPAIR TABLE
N4523A-17-C-0001
XXXXX‐XXXXX‐XXX
Noun Name Repair
Page _ of _
Site No. Defect Description/Location Repair Action: (Circle all that apply) Final Repair Length, Width, & Depth Signature, Badge, Date Remarks:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
MT / S / REP / WRNR / WR L: W: D:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.