Attachment J-1 Work Specification Package ERRATA 1
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS MICHIGAN (SSGN 727)
NWRMC-501-19
ERRATA NUMBER:
SPECIFICATION NUMBER:
One
THE FOLLOWING ITEMS ARE REPLACED:
042-10-001
DATED: 11/10/2018 2:56:10PMPage 1 of 1
SHIP: USS MICHIGAN (SSGN 727) ITEM NO: 042-10-001 (E1)
COAR: 16 PCN: SERV-L001
CMP: NONE
PLANNER: WRIGHT , ANNA
COOPER, DANIEL
SSP: NWRMC-501-19 1 of 3 ITEM NO: 042-10-001 ERRATA NO. One
1. SCOPE:
1.1 Title: Work Place Requirements
1.2 Location of Work:
1.2.1 USS MICHIGAN (SSGN-727),Puget Sound Naval Shipyard and
Intermediate Maintenance Facility(PSNS & IMF)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , (FY19)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 for schedule and associated reports.
3.2 Contractor work schedule and work breakdown structure shall coincide with PSNS & IMF work specified in Attachment A.A Revision One.
(E1)
3.3 Project Work Place Requirements:
3.3.1 Perform touch up preservation identified in the preservation work items.
3.3.1.1 Accomplish 4,148 square feet of touch up preservation to be distributed on the following work items 631-51-004, 631-51- 005, 631-51-006, 631-51-007, 631-51-008, 631-51-009, 631-51-013, 631-51-014, based on PSNS inspection results .
3.3.2 Perform structural repair work identified in the structural repair work items.
3.3.2.1 Accomplish 56,720 square inches of weld repair to be
distributed on the following work items 111-11-001, 111-11-002, 123-11-001, 123-11-002, 123-11-003 , 151-11-001, 151-11-002, 524- 10-001, 524-10-002, 528-10-001, and 528-10-002, based on PSNS structural inspection results .
3.3.3 Perform sound damping and adhesive removal identified in the sound damping work items.
3.3.3.1 Accomplish the removal of 4,400 square feet of sound
damping tile and adhesive to be distributed on the following work items 636-11-001, 636-11-002, 636-11-003, 636-51-001, and 636-51- 002, as needed to accomplish the preservation and repairs of this contract.
3.3.4 Each contractor employee requiring access to the ship shall be required to attend a mandatory project indoctrination briefing approximately 2 hours long.
3.3.4.1 Contact SUPERVISOR for times and locations. Briefing
includes Project Introduction, Environmental Safety & Health, Gas Free/Confined Space Briefing, Submarine Orientation, Shipboard
SSP: NWRMC-501-19 2 of 3 ITEM NO: 042-10-001 ERRATA NO. One
Fire Safety Control, Cleanliness and Material Tracking. Employees shall sign the Employee Introduction Training Roster after completion of the training.
3.3.5 Notify the SUPERVISOR via email, 72 hours before vehicle escort is required.
3.3.5.1 Email shall include company name, drivers name, phone number, estimated arrival date, estimated arrival time and what is being delivered.
4. NOTES:
4.1 The term "SUPERVISOR" is defined as CODE 400 Project Maintenance Team.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: NWRMC-501-19 3 of 3 ITEM NO: 042-10-001 ERRATA NO. One
Tank Turn Over SP1/Wrap SP6 Repairs SP1/Wrap Sp10 Paint Final T/U 1 (Aux 1) 9/4/19 2 (San 4) 9/9/19
3 (DCT 1) 9/23/19
4 (DCT 2) 9/28/19
5 (SAN #5) 9/30/19
6 (SAN 6 ) 10/8/19
7 (AUX 4) 10/8/19
Tank Turn Over Stage PSNS Ripout PSNS MRC INSP Repairs SP1/Wrap Sp10 Paint Final T/U 3 (MBT 3A) 6/14/19 14 Jun - 21 Jun 2019 21 Jun - 22 Jul 2019 16 Jul - 12 Aug 2 (MBT 2A) 6/26/19 26 Jun - 3 Jul 2019 4 Jul - 31 Jul 2019 15 Aug - 16 Sep 1 (MBT 1A) 7/1/19 1 Jul - 8 Jul 2019 8 Jul - 29 Jul 2019 27 Aug - 30 Sep
Tank Turn Over Rmv Zincs & Tile SP1/Wrap SP6 PSNS MRC Insp Repairs SP1/Wrap Sp10 Paint Final T/U S.S.GRP 10 30-Aug-19 2 Sept - 16 Sept 17 Sep - 23 Sept 24 Sept - 7 Oct 8 Oct - 28 Oct 29 Oct - 20 Dec 23 Dec - 27 Dec 30 Dec - 16 Jan 17 Jan - 6 Feb 7 Feb- 17 Feb S.S GRP1 20-Sep-19 23 Sept - 8 Oct 9 Oct - 15 Oct 16 Oct - 31 Oct 1 Nov - 21 Nov PSNS 21 Jan - 27 Jan 28 Jan - 10 Feb 11 Feb - 25 Feb 26 Feb - 5 Mar S.S. GRP 2 4-Oct-19 7 Oct - 22 Oct 23 Oct - 29 Oct 30 Oct - 14 Nov 15 Nov - 5 Dec 6 Dec - 29 Jan 30 Jan - 6 Feb 7 Feb - 20 Feb 21 Feb - 6 Mar 9 Mar - 17 Mar
TOUCH-UP T/O INSP PREP & PAINT
S.S. GRP6 21-Jun-19 24 Jun - 25 Jun 26 june - 24 Jul S.S GRP 5 28-Aug-19 29 Aug - 30 Aug 2 Sept - 20 Sept SAIL 28-Aug-19 29 Aug - 30 Aug 2 Sept - 20 Sept S.S GRP 3 10-Jan-20 13 Jan - 14 Jan 15 Jan - 5 Feb S.S GRP 4 19-Dec-20 20 Dec - 23 Dec 24 Dec - 11 Jan S.S GRP 8 13-Nov-19 14 Nov - 15 Nov 18 Nov - 5 Dec S.S GRP 9 8-Oct-19 9 Oct - 10 Oct 11 Oct- 24 Oct S.S GRP 11 18-Jul-19 19 Jul-22 Jul 23 July - 8 Nov
PSNS does have other work within DCT 1, DCT 2, SAN 6 and S.S. Grp 1. Dates will be validated based on Project Network Schedule and KTR proposal input.
16 Oct - 18 Nov 2019 19 Nov - 19 Dec 2019 16 Oct - 18 Nov 2019 19 Nov - 19 Dec 2019
1 Nov - 4 Dec 2019 5 Dec 2019 - 14 Jan 2020
**** Repair time frames are based on average expected condition. All repair times are subject to inspection results.
External Tanks
*** Tanks are presented in order of optimum open dates based on other known work. Actual tanks opened in order given are subject to change as schedule is progressed.
Internal Tanks
24 Jun - 15 Jul Ktr Ripout, SP1, SP6
12 Aug - 30 Dec 2019 1 Aug - 15 Aug
8 Oct - 1 Nov 2019 8 Oct - 29 Oct 2019 13 Nov 2019 - 4 Jan 2020
28 Sep - 15Oct 2019 30 Sep - 21 Oct 2019 31 Oct - 11 Dec 2019
PSNS MRC INSP
26 Sep - 7 Oct 2019
1 Oct -7 Oct
22 Ovt - 30 Oct 2019
30 Oct - 12 Nov 2019
5 Sep - 25 Sep 2019
* All dates are based on a SA00 date of 28 May and are subject to change up to 4-6 Weeks.
** Current Project schedule is not yet at a point to validate any given start dates. Dates on this spreadsheet are highly susceptible to changes as schedul solidifies.
10 Sep - 30 Sep 2019 8 Oct - 20 Nov 2019 8 Oct - 25 Nov 2019
23 Sep - 15 Oct 2019
17 Sep 2019 - 30 Jan 2020 5 Aug - 26 Aug 1 Oct 2019 - 15 Jan 2020
Hull