Needle Rock Pavement Parking Repairs
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAX24Q0036
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Scottsdale, Arizona 85262, United States
- Points of contact
-
- Troy A. McCullough troy.mccullough@usda.gov (757) 349-5638
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking a contractor to repair a damaged section of the Needle Rock parking area located within the Tonto National Forest in Scottsdale, Arizona. The scope of work includes repairing damaged asphalt pavement, concrete curbing, embankment failure, and pavement undercutting. The contractor must also submit a technical proposal in the form of a Performance Work Statement or Statement of Work outlining their approach to implementing a permanent fix, including considerations for stormwater management. This Firm Fixed-Price contract will be awarded using the Lowest Price Technically Acceptable source selection process. The proposal submission deadline is July 24, 2024, and the period of performance is 90 days after the notice to proceed.
This is a 100% Small Business Set-Aside contract under NAICS code 237310 - Highway, Street, and Bridge Construction, with an estimated project magnitude between $25,000 and $100,000. The contractor must comply with the Forest Service's Supplemental Specifications, as well as adhere to the Tonto National Forest Industrial Fire Precautions Plan Guidelines during the performance of the work. The place of performance is the Needle Rock Recreation Area Parking Lot within the Tonto National Forest in Scottsdale, Arizona.
Notice text
The Contractor will be responsible for repairing a damaged section of the Needle Rock parking area. The scope of repair encompasses damaged asphalt pavement, damaged concrete curbing, embankment failure, and undercutting of pavement. Additionally, the Contractor holds the responsibility of drafting a Technical Proposal in the form of a Performance Work Statement (PWS) or Statement of Work (SOW) that outlines their technical approach to implementing a permanent fix along with performance metrics, outcomes, and measures. This approach should include considerations for stormwater management while aligning with the objectives and criteria specified in this Statement of Objectives.
Files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - FS Supplemental Specifications to FP-14.docx | DOCX document | |
| Attachment 5 - Location Map.docx | DOCX document | |
| Attachment 1 - Statement of Objectives.docx | DOCX document | |
| 127EAX24Q0036 - Needle Rock Pavement Repairs Solicitation.pdf | ||
| Attachment 7 - Wage Determination AZ20240008.pdf | ||
| Attachment 6 - Photos.docx | DOCX document | |
| Attachment 2 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 4 - AZ-TNF 2024 Industrial Fire Plan.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Needle Rock Pavement Parking Repairs | Award Notice | |
| This notice | Solicitation | |
| Needle Rock Pavement Parking Repairs | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Chino Emergency Repairs | Forest Service | Total Small Business | |
| AZ Coconino NF Flagstaff Garage door Replacement and Service | Forest Service | Total Small Business | |
| CO-rocky MTN arsnl NWR-patch hill road | — | No set-aside | |
| GPR Survey | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity