Needle Rock Pavement Parking Repairs
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 127EAX24Q0036
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Scottsdale, Arizona 85262, United States
- Points of contact
-
- Troy A. McCullough troy.mccullough@usda.gov (757) 349-5638
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The U.S. Department of Agriculture (USDA) Forest Service is seeking a contractor to repair a damaged section of the Needle Rock parking area within the Tonto National Forest. The scope of work includes addressing damaged asphalt pavement, concrete curbing, embankment failure, and pavement undercutting. The contractor will be required to submit a Technical Proposal in the form of a Performance Work Statement (PWS) or Statement of Work (SOW) that outlines their technical approach, performance metrics, and measures, with considerations for stormwater management. The contractor must comply with FHWA FP-14 standard specifications and Forest Service supplemental specifications. The period of performance is from September 3, 2024 to December 6, 2024.
Paragraph 2:
This opportunity is set aside for small businesses. The contract value and budget range are not provided in the pre-solicitation notice. Key deliverables include a Proposed Project Plan, 100-Year Floodplain Map and Hydrologic Analysis, Erosion and Sediment Control Plan, Temporary Traffic Control Plan, and weekly progress reports. The pre-solicitation notice does not mention any potential incumbents or current contractors.
Notice text
This is a Presolicitation notice for an upcoming solicitation for the below requirement.
The Contractor will be responsible for repairing a damaged section of the Needle Rock parking area. The scope of repair encompasses damaged asphalt pavement, damaged concrete curbing, embankment failure, and undercutting of pavement. Additionally, the Contractor holds the responsibility of drafting a Technical Proposal in the form of a Performance Work Statement (PWS) or Statement of Work (SOW) that outlines their technical approach to implementing a permanent fix along with performance metrics, outcomes, and measures. This approach should include considerations for stormwater management while aligning with the objectives and criteria specified in this Statement of Objectives.
Files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Objectives.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Needle Rock Pavement Parking Repairs | Award Notice | |
| Needle Rock Pavement Parking Repairs | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Chino Emergency Repairs | Forest Service | Total Small Business | |
| CO-rocky MTN arsnl NWR-patch hill road | — | No set-aside | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| YELL 338223 - Bridge Preservation | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity