Missouri River BSNP Structures Repairs North & South FY 22
Closed Solicitation Posted
- Solicitation number
- W9128F22B0010
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Place of performance
- Omaha, Nebraska, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for construction services to rehabilitate critical structures along the Missouri River Bank Stabilization and Navigation Project between Sioux City, Iowa and Rulo, Nebraska that were damaged in 2019 floods. The U.S. Army Corps of Engineers Omaha District will award a contract to add quarried rock to replace deteriorated areas of revetments, dikes, kickers, L-head dikes, and vanes across approximately 230 river miles. Proposals are due by September 2nd, 2022 and the award will be made to the responsible bidder offering the most advantageous price. Evaluation will consider technical qualifications, past performance, and price.
This opportunity is set aside for total small business concerns. The NAICS code is 237990 and PSC code is R999. Three contractors submitted bids by the deadline ranging from $15.3 million to $29.9 million, with the government estimate being $31.7 million. Repairs are estimated to cost between $10-25 million annually through December 2025. The place of performance covers structures from RM 729.1 to RM 497.92 along the Missouri River.
Notice text
5 versions
Update #5 · Latest ·
***17 Aug 2022 - Site Visit Sign-In uploaded to attachments***
***Firms that Submitted Acceptable Proposals in Step One***
1. Fenton Construction, Inc.
2. Legacy Corporation of Illinois
3. Midwest Construction Company
4. Western Contracting Corporation
***Drawings and Specifications for Step-2 IFB has been uploaded on 4 August 2022***
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes, and vanes.These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the contractor will rehabilitate critical damaged BSNP structures by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The project location extends from Missouri River, Sioux City, IA to Rulo, NE in the States of IA, NE, and MO.
Update #4 ·
***Firms that Submitted Acceptable Proposals in Step One***
1. Fenton Construction, Inc.
2. Legacy Corporation of Illinois
3. Midwest Construction Company
4. Western Contracting Corporation
***Drawings and Specifications for Step-2 IFB has been uploaded on 4 August 2022***
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes, and vanes.These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the contractor will rehabilitate critical damaged BSNP structures by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The project location extends from Missouri River, Sioux City, IA to Rulo, NE in the States of IA, NE, and MO.
Update #3 ·
***Drawings and Specifications for Step-2 IFB has been uploaded on 4 August 2022***
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes, and vanes.These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the contractor will rehabilitate critical damaged BSNP structures by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The project location extends from Missouri River, Sioux City, IA to Rulo, NE in the States of IA, NE, and MO.
Update #2 ·
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes, and vanes.These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the contractor will rehabilitate critical damaged BSNP structures by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The project location extends from Missouri River, Sioux City, IA to Rulo, NE in the States of IA, NE, and MO.
Update #1 ·
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes, and vanes.These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, the contractor will rehabilitate critical damaged BSNP structures by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The project location extends from the Missouri River system from Sioux City, IA (RM 729.1), downstreamto Rulo, NE (RM 497.92), covering approximately 230 river miles.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Bank Stabilization & Navigation Project (BSNP) Structures Repair Project | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs | ENDIST Rock Island | Service-Disabled Veteran-Owned Small Business | |
| Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1 | ENDIST Rock Island | No set-aside | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| Belle Fountain Ditch Cleanout Phase 2 | ENDIST Memphis | Service-Disabled Veteran-Owned Small Business | |
| Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (nesp) | ENDIST St Louis | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity