This solicitation seeks proposals for the rehabilitation of damaged Missouri River Bank Stabilization and Navigation Project structures. Under the contract, the selected offeror will add quarried rock to replace deteriorated areas of revetments, dikes, kickers, L-head dikes, and vanes across approximately 230 river miles between Sioux City, IA and Rulo, NE. Proposals are due by July 15, 2022. The work is estimated to cost between $10-25 million annually and continue through December 2025. The U.S. Army Corps of Engineers District Omaha will administer the contract and conduct quality testing of placed rock.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9128F22B0010
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the rock specification, and fix several minor errors on the solicitation to include adding the phase 1 proposal due date, and update the w age determinations.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 71
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F22B0010
X 9B. DATED (SEE ITEM 11)
06-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 ‐ SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The required response date/time 15‐Jul‐2022 02:00 PM has been added.
The contractor period of performance end 870 has been added.
SECTION 00 21 00 ‐ INSTRUCTIONS
The following have been added by full text:
INSTRUCTIONS TO BIDDERS
1.1 GENERAL BIDDING INFORMATION
Bidders shall e‐mail bids to the below individuals no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recent SF 30, as applicable:
John Hickman, Contracting Officer: john.d.hickman@usace.army.mil Mark Cooley, Contract Specialist: mark.d.cooley@usace.army.mil
Each email shall contain the following information:
a. Solicitation No: W9128F22B0010
b. Bid Due Date and Time:
c. Bid Validity Date: 60 Days
Bids received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the bidder must ensure the e‐mail submission is virus‐free. The government will follow FAR 14.406 if an e‐mail bid is unreadable.
Bidders should enter a description for every file submitted. Bidders should separate files over 20 megabytes (MB) into smaller files and send separate e‐mails. Bidders shall identify each e‐mail with the number relative to the total number of e‐mails submitted (i.e., “e‐mail 1 of 4”). Bidders should request government receipt upon sending all e‐mails. Bidders should not assume e‐mail submissions are instantaneous and must consider file size and number of files sent.
Bidders must be registered in the System for Award Management (SAM) when sending the bid to comply with the annual representations and certifications requirements. The offeror certifies with its offer that the representations and certifications included in SAM are current, accurate, and complete.
1.1.1 INFORMATION TO BE PROVIDED WITH BID
Bidders must include the below information with the bid:
a. Standard Form (SF) 1442 with Blocks 14 through 20c completed and a person’s signature authorized to sign. Bidders must include their CAGE Code in Block 14, under
“CODE.”
b. Bid Schedule (SECTION 00 10 00).
c. Bid Bond (SF‐24) (only required for step two); and
d. Bidder must complete provisions from SECTION 00 45 00 – Representations and Certifications, as applicable and listed below.
i. Bidders must complete and include the certification at FAR 52.209‐13 Violation of Arms Control Treaties or Agreements‐Certification.
ii. Bidders must complete and include the representation at FAR 52.204‐24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment ONLY based on its online representation in the provision at 52.204‐26 Covered Telecommunications Equipment or Services‐Representation in
SAM.
iii. Bidders must include the representation at 252.204‐7017 Prohibition on the Acquisitions of Covered Defense Telecommunications Equipment or Services‐ Representation ONLY based on its online representation in the provision at 252.204‐7016 Covered Defense Telecommunications Equipment or Services‐ Representation in SAM.
1.1.2 BID OPENING
The government will NOT conduct a physical bid opening for this solicitation. The government will hold the bid opening by conference call at 3:00 pm CST. The government scheduled the bid opening an hour after the due date to allow enough time to download all e‐mail documents. No hard copy documents will be accepted.
1.1.3 INFORMATION FOR MODIFYING BIDS
If a bidder needs to modify its bid, the bidder shall send the revised offer by e‐mail before the date submitted within Block 13 of the SF 1442 or Block 14 of the most recently issued SF 30 applicable.
1.1.3 ARITHMETIC DISCREPANCIES
Any clerical mistake, including arithmetic discrepancies in a bid, will be handled according to FAR 14.407‐2. Any clerical error, apparent on its face in the offer, may be corrected by the contracting officer before award, but only after first obtaining bidder verification of the bid intended. The following are examples of mistakes that may be fixed:
(1) Obviously misplaced decimal points;
(2) Discrepancies between unit price and extended price (unit price will govern);
(3) Apparent errors in extension of unit prices;
(4) Apparent errors in addition of lump sum and extended prices.
1.1.4 BASIS FOR AWARD
Per FAR 52.214‐19 Contract Award‐Sealed Bidding‐Construction in Section 00 21 00 (Instructions), the government will evaluate bids in response to this solicitation without discussions. It will award a contract to the responsible bidder whose offer, conforming to the solicitation, will be most advantageous to the government, considering only price and the price related factors specified elsewhere in the solicitation.
1.1.5 DESCRIPTION OF WORK
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L‐head dikes and vanes. These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, critical damaged BSNP structures will be rehabilitated by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The quantity of rock for each site is intended to bring the structures to the lines and grades shown on the cross sections.
1.1.6 ESTIMATED CONSTRUCTION COST
The estimated magnitude of construction is between $10,000,000.00 and $25,000,000 for each site (CLIN 0001, and CLIN 0002).
1.1.7 BID GUARANTEE
See 52.228‐1, Bid Guarantee in Section 00 72 00 (General Conditions). The bid guarantee must be on SF 24 and include a Power of Attorney appointing an attorney‐in‐fact with authority to bind the surety. At the time of bid opening, the bond is enforceable against the surety should the bidder fail to meet its obligation. A power of attorney must include a certification as to the authority of the surety’s agents supported by a resolution of the surety authorizing their use and committing it bound by them. Electronic signatures and electronic, mechanically‐applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF‐24 is not required. Mailing a bid guarantee is not allowed.
1.1.8 PERFORMANCE AND PAYMENT BONDS OR ALTERNATE PAYMENT PROTECTION
See 52.228‐15 Performance and Payment Bonds‐Construction (JUN 2020) (DEVIATION 2020‐ O0016) in Section 00 72 00 (General Conditions). The performance bond must be on SF‐25, and the payment bond must be on SF‐25A. Electronic signatures and electronic, mechanically‐applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF‐25 or SF‐25A is not required.
1.1.9 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by internet access only. The government will post all solicitation documents to https://sam.gov/. The bidder is responsible for checking the website for amendments.
To view a list of interested vendors and receive notifications or e‐mail of changes regarding the solicitation, bidders must register as vendors on the website listed above. If a bidder is already registered, enter the user name and password to log in and search for the solicitation number. If you wish for general contractors, subcontractors, suppliers, plan rooms, or print shops to have the ability to contact you, click on the “Add Me to Interested Vendors” for this solicitation.
1.1.11 REJECTION OF BIDS
The government will handle the rejection of bids per FAR 14.404. The government may reject an offer if the prices for line items or subline items are materially unbalanced (see 15.404‐1(g)).
Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or underestimated as indicated by the application of cost or price analysis techniques.
1.1.12 NOTICE REGARDING BUY AMERICAN STATUTE
The Buy American statute (41 USC 83 chapter 83, Buy American) generally requires that contractors use only domestic construction material during the performance of this contract.
Exception from the Buy American statute is permitted only in the case of non‐availability of domestic construction materials or allowed under Trade Agreements if included in the solicitation. A bid offering non‐domestic construction material will not be accepted unless specifically approved by the government or authorized under Trade Agreements if included in the solicitation. When a bidder proposes to furnish non‐domestic construction material, the bid must set forth an itemization of the quantity, unit price, and intended use of any non‐domestic construction material.
1.1.13 FEDERAL, STATE AND LOCAL TAXES
The bidder is responsible for investigating applicable federal, state, and local taxes and any specific exemptions that may exist and includes applicable Value‐Added Taxes (VAT), sales, use, and excise taxes. See 52.229‐3 Federal, State, and Local in Section 00 72 00 (General Conditions).
1.1.14 NEBRASKA SALES AND USE TAX
Materials installed under this contract are not exempt, and the bidder must include tax in the bid. Telephone: (402) 595‐2065 (Department of Revenue‐Omaha).
1.1.15 MISSOURI SALES AND USE TAX
Materials installed under this contract are not exempt, and the bidder must include tax in the bid. Contact the Missouri Department of Revenue @ Business Sales/Use Taxability: 573‐751‐2836.
1.1.16 IOWA SALES AND USE TAX
The contractor is responsible for payment of Iowa Sales and Use taxes for all materials used under this contract. Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS, provision "IOWA SALES AND USE TAX," requires the Contractor to furnish to the Contracting Officer the statement required by Section 422.45 (7a), Iowa Code annotated, and to include in subcontracts and purchase orders a clause insuring submission of the statement by first tier subcontractors and suppliers and their subcontractors and suppliers. Telephone: (515) 281‐3114 (Department of Revenue).
a. In the event goods, wares or merchandise on which the Contractor has paid Iowa sales or use tax become an integral part of the project, the Contractor shall obtain appropriate forms from the Iowa State Tax Commission for recording the amount of purchases of such goods, wares, or merchandise, and shall complete, execute, and deliver them to the Contracting Officer prior to final settlement of the contract. The Contractor shall provide and report all data and information which may be necessary or required to enable the Contracting Officer to obtain all refunds from the Iowa Tax Commission to which the Federal Government may be entitled.
b. The contractor shall insert a clause containing the substance of the foregoing paragraph a. in every first tier subcontractor or vendor to include such a clause in any subcontract or purchase order which he places. The Contractor shall obtain completed forms from his subcontractor and suppliers for submission to the Contracting Officer before final settlement of the contract.
1.1.17 BIDDER’S QUESTIONS AND COMMENTS
Bidders must submit questions and comments relative to the bidding documents via Bidder Inquiry as indicated below.
Bidders may submit questions and comments relative to any proprietary concerns or bidding documents, or if the Bidder Inquiry system is out of service, to the individuals below:
Contract Specialist – Mark Cooley mark.d.cooley@usace.army.mil
Contracting Officer – John Hickman john.d.hickman@usace.army.mil
1.1.17.1 BIDDER INQUIRY
Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment.
Bidders must use the Bidder Inquiry Key and instructions below to submit and review inquiry items. A bidder who enters a comment/question will receive an acknowledgment of their comment /question by e‐mail, followed by an answer to the comment/question after the government has processed it.
The government will make available all timely questions and approved answers in ProjNet.
The Solicitation Number is: W9128F22B0010
The Bidder Inquiry Key is: 9EXVCA‐6MXRUZ
a. Registration for ProjNet Bidder Inquiry Access
1. From the ProjNet home page listed above, click on Quick Add on the upper right side of the screen.
2. Select USACE for the Agency.
3. Enter the Bidder Inquiry Key above.
4. Enter the primary e‐mail address to use for communication.
5. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E‐mail, Secret Question, Secret Answer, and Time Zone. Bidders will use the answer to the Secret Question from this point on to access the ProjNet system.
7. Click Add User. Once completed, ProjNet registration is complete, and the bidder is logged into the system.
b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, bidders will not receive a password by e‐mail.
Bidders will utilize the Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Select USACE for the Agency.
4. Enter the Bidder Inquiry Key above.
5. Enter the primary e‐mail address used to register.
6. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once complete, the bidder is logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
c. Bidders are requested to review the plans and specifications in their entirety and review the Bidder Inquiry System for answers to questions prior to submitting a new inquiry.
d. The call center operate weekdays from 8 am to 5 pm Central Standard Time Zone (Chicago). The telephone number for the call center is 800‐428‐HELP.
1.1.18 AVAILABILITY OF BID RESULTS
Bid results will be available after bid opening on https://sam.gov/.
SECTION 00 21 13 ‐ INSTRUCTIONS TO BIDDERS
The following have been deleted:
INSTRUCTIONS TO BIDDERS
SECTION 00 22 00 ‐ SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
EVALUATION CRITERIA
OFFER
EVALUATION
STEP‐ONE‐ TECHNICAL PROPOSALS EVALUATION
The Government will evaluate each offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors listed below. Each of the evaluation factors will be evaluated by the Government and either an “acceptable”, “unacceptable” or “reasonably susceptible of being made acceptable” rating will be determined by consensus of the Government evaluation board. There are no relative weights assigned to the factors. A Step‐One acceptable technical proposal must be rated “acceptable” for all evaluation factors in order to receive an overall “acceptable” technical proposal rating.
Factor and Overall Technical Proposal Ratings. Each factor and the overall technical proposal as a whole will be given one of the ratings identified and defined as follows:
FACTOR RATINGS
(Factors 1 through 3)
DEFINITION
Acceptable The proposal meets the requirements of the RFP and indicates an adequate approach and understanding of the requirements.
Reasonably Susceptible of Being Made Acceptable
(Note: This rating is not used for the overall technical proposal rating)
The proposal, as proposed, cannot be rated as Acceptable because of error(s), omissions(s) or deficiency(ies) which are capable of being corrected without a major rewrite or revision of the proposal.
Unacceptable The proposal does not meet the requirements of the RFP.
FACTOR 3 RATING
(Past Performance)
DEFINITION
Acceptable Proposal meets the requirements of the RFP, and based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Proposal does not meet the requirements of the RFP, and / or based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
1. FACTORS, SUBMISSION REQUIREMENTS, ACCEPATILITY CRITERIA.
The information provided in this section will be used in evaluating the offeror’s capability, rock supply source and rock quality, and past performance.
Project Description: The contract will require placement of stone meeting USACE specifications within the Missouri River at locations accessible via floating plant.
Placement locations will be in the general vicinity on the Missouri River between Sioux City, IA, and Rulo, NE. Placement will consist of maintenance work along the navigation channel on or near existing rock structures. Structures consist of a variety of types including revetments, reverse sills, chevrons, dikes, L‐heads, and kickers. Placement locations will generally be accessible via floating plant. Some locations may require incidental material movement to facilitate floating plant access. Placement rate will generally vary between 3 and 15 tons/foot. Drawings illustrating the work area and typical details of structure repairs are included in Appendix A.
Factor 1 – Construction Equipment, Staff, and Rock Placement Capability.
Submission Requirements:
The Contractor shall prepare and submit a narrative demonstrating adequate floating plant and equipment to perform the work. The contractor shall submit copies of all licenses and certificates required in Factor 1 in addition to the narrative. The total narrative for Factor‐One shall be no more than three pages in length and shall include, as a minimum, the following elements and sub‐elements.
1. The narrative shall identify ownership or access to floating plant equipment, pilots, operators, and crew including the following.
a. Floating plant consisting of tow vessels, material barge(s), work barge(s), excavator(s), support vessels.
i. At least two tow vessels, 27 feet long or longer.
ii. 4 equipment barges.
iii. Mechanisms to load and place rock (loaders and excavators).
iv. Support vessel such as a skiff.
v. Equipment type, manufacturer, make, model, year, dimensions, draft, propulsion engine horsepower, maximum load capacity.
b. Tow Vessel Pilots and Licenses. Identify all tow vessel pilots that may operate the tow vessels. All pilots shall be appropriately licensed. Contractor shall provide copies of all proposed tow vessel pilots’ current license.
c. Certificates of Inspection for vessels listed in 1a.
d. The narrative shall also indicate the experience of the contractor and a description of means and methods for transporting and placing up to 170,000 tons of stone per year for three consecutive years from the source locations/quarries to the placement locations on the Missouri River. The narrative shall include a means and methods paragraph(s) that provides an overview discussion that demonstrates the Contractor understands the necessary means and methods to accomplish the work. Relevant information would include assumed means and methods of transport, weekly or monthly placement rates, and transport time from the rock source. The narrative shall also account for the following parameters.
i. Placement beginning in fall of 2022 and lasting until December of 2025 assuming an annual placement period of 8 months per year.
ii. Capability shall account for an annual placement period that matches the navigation flow support season on the Missouri River. The annual placement period will include less than 8 months, from 1 April through 20 November for the entire reach of river.
Evaluation Criteria:
The Government will evaluate the contractor’s response to Factor 1 in its entirety and categorize the proposal with one combined technical evaluation for this factor. The proposal must be in an organized manner that acceptably addresses the elements and sub‐elements listed in the submission requirements.
Minimum Acceptability Criteria:
The contractor’s narrative must include all the elements and sub‐elements listed in 1a through 1d above. A table or bulletized list of available equipment is adequate for 1a provided it’s accompanied by a signed statement by the CEO or President of the company indicating that all such equipment can be or has been secured and will be made available if any contracts are awarded under Step 2 of this process. 1d may be demonstrated within the narrative by providing a statement that indicates capability to meet the sub‐portions in 1d as long as it includes a signed commitment by the CEO or President of the company.
Factor 2 – Stone Quality and Capacity.
The contract will require placement of stone meeting USACE specifications within the Missouri River at locations shown on Figure 1, Project Plans, Appendix A. Specific structures, and locations will be provided in Step 2. All stone to be placed in all locations in the eventual Step 2 plans and specifications will be subject to the specification provided in Appendix D of this solicitation. Step 1 requires investigations and a narrative describing the results of the investigations. The investigations and the narrative shall address the items specified below in the Factor 2 submission requirements. The current stone specification, in its entirety, is provided for reference in Appendix D. The Contractor shall review and fully comprehend the specification. Bidder inquries should be submitted via Projnet, as described in the earlier portion of this solicitation.
Contractors shall expect the Corps to perform quality testing of the stone supplied during performance of any contract awarded resulting from Step‐Two.
The Step‐Two project Plans and Specifications will include additional and substantial project requirements. Submittal and acceptance of the Step 1 Contractor listed stone sources does not imply any Government acceptance of Contractor identified stone sources for project use.
1. Narrative. The Contractor shall provide a brief narrative, no more than 1 page in length, summarizing the stone investigation and including all the following items.
a. The narrative shall identify and include the names of the quarries and contact information for the representatives of the quarries that were coordinated with during the investigation.
b. The narrative shall indicate whether the contractor has secured a preliminary agreement with a quarry that can supply or has previously supplied stone that meets the requirements (or similar requirements) of the specification in Appendix D.
i. Previously supplied stone must have been supplied within the last one year.
c. The total capability from all stone sources must be at least 170,000 tons a year. The narrative shall indicate whether the contractor has secured or gained access to quarries willing to supply 170,000 tons/year of stone that meets the requirements of the specification in Appendix D.
2. Quarry Demonstration Form. The Contractor shall complete Appendix C in addition to the narrative, Quarry Demonstration Form, to document stone quality and capability.
3. Testing Results ‐ All stone that will be allowed for use on the job must meet the stone quality specification requirements in Appendix D. In addition to the 1‐page narrative and the form located in Appendix C, the Contractor shall also provide available stone test results as demonstration of quality. However, no new testing is required for this submittal. Offerors who fail to provide previous, similar test results, may be rated as unacceptable. Test results shall be substantially similar to those required in the appendix D, Stone specification.
The Government will evaluate the Contractor provided documentation in its entirety and categorize the proposal with one combined technical evaluation for this factor. The Contractor should include the narrative, completed Appendix C, and any optional supplemental information combined in an organized manner for Factor 2.
The contractor proposal must, at a minimum, include and address all the elements and sub‐elements listed in the submission requirements for this factor. A Factor 2 rating of “acceptable” will be assigned if the submittal demonstrates the Contractor has provided the required narrative and quarry demonstration form.
Factor 3 – Past Performance.
The contractor must submit signed copies of all interim and final ratings received during the time period of October 1, 2017, to October 1, 2022 as included in the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System
(CPARS) or other databases using all CAGE/UEI numbers of team members (joint venture, teaming arrangement, or parent company/subsidiary/affiliate) that will be performing the work identified in Factor 1 above. All ratings must include the contact information, e‐mail or phone, of the rating official. Offerors may also utilize the Past Performance Questionairre (PPQ) provided as an attachment to this solicitation to respond. The Past Performance questioniarre must be completed by a knowledgeable customer, not by the offeror. PPQs may be submitted directly to the Contract Specialist or Contracting Officer from the customer, but must be received not later than the step 1 offer due date/time and must reference the offeror and the solicitation number the PPQ is in response to. Offerors may also submit PPQs gathered along with their step 1 response so long as the PPQ is complete, and signed by a cognizant customer. The Government reserves the right to contact any persons listed on the PPQ to validate the responses and any information found to be invalid, or if the Government is unable to validate the information with reasonable effort during the evaluation period, that information may be discounted during the evaluation.
The government will evaluate past performance ratings from all interim and final CPARS ratings and categorize the proposal with one evaluation for this factor. Contractor must submit signed copies of all interim and final CPARS ratings received for the time period of October 1, 2017, to October 1, 2022.
The Government may also review past performance information from any sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The evaluation may take into account the number and severity of problems, the demonstrated effectiveness of corrective actions taken, and the overall work record.
The contractor proposal must, at a minimum, include and address the elements and sub‐elements listed in the submission requirements for this factor. A Factor 3 rating of “acceptable” will be assigned if the submittal demonstrates all the Contractor’s ratings have been better than “unsatisfactory”. All proposals including any interim or final ratings of unsatisfactory will be rated as “unacceptable” for this factor. All contractors receiving an unacceptable rating for this factor will be disqualified from bidding in Step‐Two. Contractors that possess no CPARS ratings will be rated as “acceptable” for this factor.
The government will also independently search, secure, and review all ratings in the previously mentioned rating systems. The same acceptability criteria will apply to ratings the government discovers and secures.
Attachment 2
Past Performance Questionnaire
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ‐0)
CONTRACT INFORMATION (Contractor to complete Blocks 1‐4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5‐8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY
AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub‐ element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub‐ element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub‐element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub‐element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub‐element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
SECTION 00 73 00 ‐ SUPPLEMENTARY CONDITIONS
The following have been modified:
IA202200002
"General Decision Number: IA20220002 06/03/2022
Superseded General Decision Number: IA20210002
State: Iowa
Construction Type: Heavy River Work
Counties: Iowa Statewide.
HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING
TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI
RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA
WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES
CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING
WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE
WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES,
RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY
CONSTRUCTION.
Note: Contracts subject to the Davis‐Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but do not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage |
| | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government‐contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022 2 03/11/2022 3 04/15/2022 4 06/03/2022
* CARP0004‐007 05/01/2022
SCOTT COUNTY
Rates Fringes
CARPENTER........................$ 31.75 26.62
ENGI0150‐008 06/01/2021
CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT
COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.50 35.80
GROUP 2.....................$ 36.50 35.80
GROUP 3.....................$ 33.85 35.80
GROUP 4.....................$ 32.80 35.80
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat
GROUP 2: Asphalt Heater‐Planer Unit; Asphalt Paver; Asphalt Paver Screed; Asphalt Plant; Automatic Curbing Machine;
Backfiller (throw bucket); Blastholer Self‐Propelled Rotary Drill or Similar Machines; Boom Tractor or Side Boom;
Boring Machine (Directional, Vertical or Horizontal);
Building Hoist (1,2 or 3 drums); Caisson Auguring Machines;
Central Redi‐Mix Plant; Chip Spreader; Cleaning & Priming Machine; Combination Backhoe Front End Loader; Combination Concrete Finishing Machine and Float; Concrete Breaker or Hydro‐Hammer; Concrete Conveyor or Pump; Concrete Paver;
Concrete Spreader; Concrete Wheel Saw (Large self‐propelled); Crusher (Stone, Concrete, Asphalt, etc.);
Curing‐Tinning Machine; Dipper Dredge Crane man; Dipper Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.);
Excavator; Farm‐Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);
Grader, Motor Grader, Motor Patrol, Auto Grader, Form Grader, Pull Grader, Sub Grader, Elevating Grader; Group Equipment Greaser; Guard Rail Post Driver; Hoists;
Hydraulic Dredge Leverman or Engineer; Hydro‐Vac Truck Mounted or Pull Type, and Similar Equipment; Laser Screed;
Loader (Track, Rubber Tire or Articulated); Locomotive Engineer; Mechanic‐Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile Driver; Pipe Bending; Pug Mill; Road Widener‐Shoulder Spreader; Scraper (self‐propelled); Self‐Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad Foot Compactor; Shovel; Slip Form Paver; Steel Track‐Type Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy;
Trenching Machine (40 H.P. & over); Work Boat.
GROUP 3: Articulated Off‐Road Haul Unit; Asphalt Booster;
Boiler (Engineer or Fireman); Conveyor Over 20 H.P.;
Distributor; Driver on Truck Crane or Similar Machines;
Elevator; Farm‐Type Tractor (Without Power Attachment);
Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant;
Mechanical Broom; Mud Jack; Self‐Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine (Under 40 H.P.).
GROUP 4: Air Compressor (400 C.F.M. or over); Compact Loader (Rubber Tire, Track & Utility); Engine Driven Welding Machine; Mechanical Heater (other than steam boiler); Small Outboard Motor Boat (Safety Boat & Life Boat); Water Pump (More than one well point pump).
ENGI0234‐002 12/01/2021
REMAINING COUNTIES
Rates Fringes
Power equipment operators:
MISSISSIPPI RIVER
GROUP A....................$ 40.72 15.97
GROUP B....................$ 40.03 15.97
GROUP C....................$ 37.70 15.97
MISSOURI RIVER
GROUP A....................$ 40.24 15.97
GROUP B....................$ 39.57 15.97
GROUP C....................$ 37.70 15.97
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol (finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics ‐ welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self‐propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.
GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self‐propelled sheepsfoot roller, self‐propelled roller, dristributor, screening and washing plant, self‐propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self‐propelled elevator grader, water wagon on compaction
GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver‐oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3"", farm type tractor (pulling disc, harrow or roller).
IRON0111‐005 07/01/2021
(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE,
HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON,
LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)
Ironworker.......................$ 33.75 28.36
LABO0309‐005 01/01/2022
SCOTT COUNTY
Rates Fringes
LABORERS
GROUP 1.....................$ 31.31 23.71
GROUP 2.....................$ 31.81 23.71
GROUP 3.....................$ 32.44 23.71
LABORER CLASSIFICATIONS
GROUP 1 ‐ Flagman; Dumpman; Spotter; Broom Man; Landscaper;
Planting & Removal of Trees; Fencing Laborers; Cleaning of Forms or Lumber (in Bone Yard); Laying of Sod; Moving and/or Maintenance of Flares & Barricades; Operation of all Hand, Electric, Air, Hydraulic or Mechanically Powered Tools under the the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator; Mortar Mixer; Power & Hand Saw (When Clearing Timber); General Laborer; Material Handler; Form Handler; Concrete Dumper; Puddler; Explosives Handler;
Center Strip Handler & Installer; Prime Mover or any Mechanical Device Taking the Place of Concrete Buggy or Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting Hammer Driver; Laying & Jointing of Telephone Conduit; Gas Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin;
Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker;
Bankman on Floating Plant; Jointman With Pipelayer; Back‐up Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water Main; Batterboard Man or Laser Operator on Sewer & Water Main; Laborer in Ditch or Tunnel, on Sewer or Water Main & Telephone Conduit, Cutters; Burners; Torchman; Gravel Box Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of Steel & Rebar; & Wrecking Laborers
GROUP 2 ‐ Asphalt Raker or Luteman; Pipe Setter on Sewer or Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb Machine Operator; Concrete Burning Machine Operator; & Coring Machine Operator; Hazardous Waste Worker; Asbestos Abatement Worker
GROUP 3 ‐ Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)
PLAS0544‐001 01/01/2019
SCOTT COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.90 23.16
TEAM0371‐001 05/01/2019
SCOTT COUNTY
Truck drivers:
GROUP 1.....................$ 38.17 13.25+a GROUP 2.....................$ 38.71 13.25+a GROUP 3.....................$ 39.01 13.25+a GROUP 4.....................$ 30.34 13.25+a GROUP 5.....................$ 40.39 13.25+a
Footnote:
a. PENSION: $52.80 per day
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons , air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick‐ up‐trucks when hauling material, tools or men to and from and on the job site, and forklifts up to 6,000 lb capacity
GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A‐frame winch trucks, or similar equipment when used for transportation purposes. Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or simiolar equipment when used for transportation purposes..
GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks
GROUP 4: Oil distributors, lowboys
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
SUIA2002‐002 12/01/2014
Rates Fringes
CARPENTER
Mississippi River (Iowa Side).......................$ 28.55 16.29 Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay previalis in the adjoining states, then those rates shall apply)................$ 34.60 21.38 Missouri River..............$ 31.25 12.43
CEMENT MASON/CONCRETE FINISHER...$ 33.35 10.05
Ironworkers: (setting of all structural steel and reinforcing steel installation:)
Des Moines and Lee Counties....................$ 29.42 16.68 Dubuque, Clayton & Allamakee Counties..........$ 26.67 16.68 Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.89 16.68 Jackson, Clinton, Louisa & Muscatine Counties........$ 36.20 16.68 Woodbury & Monona Counties..$ 19.46 16.68
Laborers:
Class A Mississippi River..........$ 30.92 8.60 Missouri River.............$ 28.92 8.60 Class AA Mississippi River..........$ 31.95 8.60 Missouri River.............$ 29.95 8.60 Class B Mississippi River..........$ 29.22 8.60 Missouri River.............$ 28.22 8.60 Class C Mississippi River..........$ 26.05 8.60 Missouri River.............$ 24.05 8.60
TRUCK DRIVER
Mississippi River...........$ 24.88 10.50 Missouri River..............$ 24.88 10.50
LABORERS CLASSIFICATIONS
GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.
GROUP AA: Pipelayer, concrete specialist; tunnelman
GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .