Appendices_A_B_C.pdf

PDF 5 MB Posted

Attached to
Missouri River BSNP Structures Repairs North & South FY 22
Solicitation number
W9128F22B0010
Issued by

About this file

This document contains appendices and details for a federal solicitation for Missouri River Bank Stabilization and Navigation Project structure repairs. The U.S. Army Corps of Engineers, Omaha District, is seeking a contractor to rehabilitate damaged bank stabilization and navigation structures along approximately 230 river miles of the Missouri River from Sioux City, Iowa to Rulo, Nebraska. Appendix A includes project location maps and typical repair details. Appendix B provides information on approved rock testing facilities. Appendix C is a quarry demonstration form requiring the contractor to assess quarry sources and confirm adequate supply for the minimum 170,000 ton per year requirement. The solicitation seeks repairs including adding rock to areas of deterioration and rebuilding substantial losses to revetments, dikes, kickers, L-head dikes and vanes critical to the navigation channel.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A

Project Plans

Figure 1. Project Location Map

Figure 2. Missouri River Bank Stabilization Structure Types and Layout

Figure 3. Typical Photo of Deficient of Revetment Prior to Repair

Figure 4. Typical Photo of Deficient Dike Prior to Repair

Figure 5. Typical Revetment Repair Details

Figure 6. Typical Dike Repair Details

Appendix B USACE Approved Lab Facility Example

Example results from searching for CRD-C 144, Standard Test Method for Resistance of Rock to Freezing and Thawing are shown in the below figure. A searchable list of approved test facilities is available at:

https://mtc.erdc.dren.mil/searchvalidation.aspx

Appendix C Quarry Demonstration Form

Quarry Name Minimum Quarry Supply (tons/yr)1

I certify that I have investigated the above quarries sufficiently to determine that the quarry stone meets specifications, that the tabulated minimum stone supply from each quarry (tons/yr) is feasible, and that I am confident the total capability of all tabulated quarries equals or exceeds the minimum required supply of 170,000 tons/yr.

Contractor’s Designated Signatory _____________________________________

1 – While use of the listed quarry and the minimum supply quantity (tons/yr) for each quarry is not contractually binding, the tabulated value represents due diligence on the part of the Contractor to accurately assess quarry quality and capability.

File details come from the government source that posted it. Updated .