Integration Support Contract (ISC) 2. 0

Cancelled Solicitation Posted

Solicitation number
FA8207-21-R-0001
Agency
Nuclear Weapons Center Air Force Materiel Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
PSC
R425 Support- Professional: Engineering/Technical
Place of performance
Hill AFB, Utah 84056, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Nuclear Weapons Center is seeking proposals for the Integration Support Contract (ISC) 2.0 to provide Systems Engineering and Integration (SE&I) support for the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO. Key requirements include expertise in areas such as test anomaly root cause analysis, digital engineering, systems engineering, workforce management, and operational capabilities. Proposals will be evaluated based on Technical Capability, Mission Capability, and Cost/Price factors, with Technical Capability being the most important. Proposals are due by January 22, 2021, and the contract is scheduled to be awarded thereafter.

The solicitation is not set-aside for any socioeconomic categories. The incumbent contractor is eligible to compete for the follow-on work. The anticipated value of the contract is between $50 million minimum and $12 billion maximum over its 18-year period of performance, which includes a 5-year base period and five 1-year option periods. The work will primarily be performed at Hill AFB, UT.

Notice text

8 versions

Update #8 · Latest ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM Part 2

****************************************************

The government appreciates all of the questions and comments from Industry regarding the ISC 2.0 RFP.  We asked that the potential offerors please have their questions and comments submitted by Wednesday December 2.  Since that day, we have received many additional questions and comments.  At this point, as soon as we have all the questions answered and ready to send to our Legal Department for review, we get another couple batches of questions.  This cycle is making it so that we are not able to get the initial batch of questions through Legal review and posted.  Therefore, the government would ask that all the potential offerors please hold any additional questions and comments until we are able to post out the initial batch.  Many of the new questions coming in are questions that have been asked by other offerors, so they will be answered once everyone gets to see all the questions and all the answers.  Thanks for your consideration and patience as we are working through these and we will get them posted as soon as we are able to.   

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0001

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0001.  This amendment:

1. Adds the following provisions/clauses:

252.204-7019

252.204-7020

252.222-7999

2. Removes the following provisions/clauses:

252.215-7009

3. Provide the following updated Attachments:

Attachment 3 Labor Quantity Workbook Master

Attachment 7 Government Rights in Data and Software (GRIDS)

Attachment 8 Labor Rate Matrix

Attachment 9 Labor Category Mapping Workbook

Attachment 13 Draft CLIN Structure for Task Order 1 MMIII Directorate

Attachment 15 Draft CLIN Structure for Task Order 3 MMIII Acquisition Support

Attachment 17 Draft CLIN Structure for Task Order 5 GBSD Enterprise

Attachment 18 ISC 2.0 PWS ATO1 MMIII Directorate Support

Attachment 22 ISC 2.0 PWS ATO5 GBSD

Attachment 23 Section L

Attachment 24 Section M

Attachment 25 Task Order CLIN Numbering

4. Further, attached to this listing is the RFP CRM Questions and Answers 1 (17-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0002

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0002.  This amendment:

1. Provide the following updated Attachments:

Attachment 23 Section L

Attachment 24 Section M

2. Further, attached to this listing is the RFP CRM Questions and Answers 2 (28-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

No other changes were made to the RFP.  

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0003

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0003.  This amendment:

1. Provide the following updated Attachments:

Attachment 8 Labor Rate Matrix

Attachment 23 Section L

2. Further, attached to this listing is the RFP CRM Questions and Answers 3 (7-Jan-21).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

No other changes were made to the RFP.  

In addition to this amendment, there have been requests to post a list of all the documents that have been sent out in the Bidder's Library.  Attached to this posting is the document titled "Bidders Library Master List."  

----------------------------------------------------------------------------------------------------------------------

****************************************************

Award Schedule Update

****************************************************

There have been several questions come in regarding our award schedule.  As of right now, 21 December 2021 is still the official date. We are constantly re-evaluating schedules, but it can take time as they have to be coordinated with approval authorities. Our intention is to revise and update the schedule (if needed) and release this information with Final Proposal Revision (FPR) requests.  

----------------------------------------------------------------------------------------------------------------------

Update #7 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM Part 2

****************************************************

The government appreciates all of the questions and comments from Industry regarding the ISC 2.0 RFP.  We asked that the potential offerors please have their questions and comments submitted by Wednesday December 2.  Since that day, we have received many additional questions and comments.  At this point, as soon as we have all the questions answered and ready to send to our Legal Department for review, we get another couple batches of questions.  This cycle is making it so that we are not able to get the initial batch of questions through Legal review and posted.  Therefore, the government would ask that all the potential offerors please hold any additional questions and comments until we are able to post out the initial batch.  Many of the new questions coming in are questions that have been asked by other offerors, so they will be answered once everyone gets to see all the questions and all the answers.  Thanks for your consideration and patience as we are working through these and we will get them posted as soon as we are able to.   

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0001

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0001.  This amendment:

1. Adds the following provisions/clauses:

252.204-7019

252.204-7020

252.222-7999

2. Removes the following provisions/clauses:

252.215-7009

3. Provide the following updated Attachments:

Attachment 3 Labor Quantity Workbook Master

Attachment 7 Government Rights in Data and Software (GRIDS)

Attachment 8 Labor Rate Matrix

Attachment 9 Labor Category Mapping Workbook

Attachment 13 Draft CLIN Structure for Task Order 1 MMIII Directorate

Attachment 15 Draft CLIN Structure for Task Order 3 MMIII Acquisition Support

Attachment 17 Draft CLIN Structure for Task Order 5 GBSD Enterprise

Attachment 18 ISC 2.0 PWS ATO1 MMIII Directorate Support

Attachment 22 ISC 2.0 PWS ATO5 GBSD

Attachment 23 Section L

Attachment 24 Section M

Attachment 25 Task Order CLIN Numbering

4. Further, attached to this listing is the RFP CRM Questions and Answers 1 (17-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0002

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0002.  This amendment:

1. Provide the following updated Attachments:

Attachment 23 Section L

Attachment 24 Section M

2. Further, attached to this listing is the RFP CRM Questions and Answers 2 (28-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

No other changes were made to the RFP.  

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0003

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0003.  This amendment:

1. Provide the following updated Attachments:

Attachment 8 Labor Rate Matrix

Attachment 23 Section L

2. Further, attached to this listing is the RFP CRM Questions and Answers 3 (7-Jan-21).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

No other changes were made to the RFP.  

In addition to this amendment, there have been requests to post a list of all the documents that have been sent out in the Bidder's Library.  Attached to this posting is the document titled "Bidders Library Master List."  

----------------------------------------------------------------------------------------------------------------------

Update #6 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM Part 2

****************************************************

The government appreciates all of the questions and comments from Industry regarding the ISC 2.0 RFP.  We asked that the potential offerors please have their questions and comments submitted by Wednesday December 2.  Since that day, we have received many additional questions and comments.  At this point, as soon as we have all the questions answered and ready to send to our Legal Department for review, we get another couple batches of questions.  This cycle is making it so that we are not able to get the initial batch of questions through Legal review and posted.  Therefore, the government would ask that all the potential offerors please hold any additional questions and comments until we are able to post out the initial batch.  Many of the new questions coming in are questions that have been asked by other offerors, so they will be answered once everyone gets to see all the questions and all the answers.  Thanks for your consideration and patience as we are working through these and we will get them posted as soon as we are able to.   

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0001

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0001.  This amendment:

1. Adds the following provisions/clauses:

252.204-7019

252.204-7020

252.222-7999

2. Removes the following provisions/clauses:

252.215-7009

3. Provide the following updated Attachments:

Attachment 3 Labor Quantity Workbook Master

Attachment 7 Government Rights in Data and Software (GRIDS)

Attachment 8 Labor Rate Matrix

Attachment 9 Labor Category Mapping Workbook

Attachment 13 Draft CLIN Structure for Task Order 1 MMIII Directorate

Attachment 15 Draft CLIN Structure for Task Order 3 MMIII Acquisition Support

Attachment 17 Draft CLIN Structure for Task Order 5 GBSD Enterprise

Attachment 18 ISC 2.0 PWS ATO1 MMIII Directorate Support

Attachment 22 ISC 2.0 PWS ATO5 GBSD

Attachment 23 Section L

Attachment 24 Section M

Attachment 25 Task Order CLIN Numbering

4. Further, attached to this listing is the RFP CRM Questions and Answers 1 (17-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0002

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0002.  This amendment:

1. Provide the following updated Attachments:

Attachment 23 Section L

Attachment 24 Section M

2. Further, attached to this listing is the RFP CRM Questions and Answers 2 (28-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

No other changes were made to the RFP.  

----------------------------------------------------------------------------------------------------------------------

Update #5 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM Part 2

****************************************************

The government appreciates all of the questions and comments from Industry regarding the ISC 2.0 RFP.  We asked that the potential offerors please have their questions and comments submitted by Wednesday December 2.  Since that day, we have received many additional questions and comments.  At this point, as soon as we have all the questions answered and ready to send to our Legal Department for review, we get another couple batches of questions.  This cycle is making it so that we are not able to get the initial batch of questions through Legal review and posted.  Therefore, the government would ask that all the potential offerors please hold any additional questions and comments until we are able to post out the initial batch.  Many of the new questions coming in are questions that have been asked by other offerors, so they will be answered once everyone gets to see all the questions and all the answers.  Thanks for your consideration and patience as we are working through these and we will get them posted as soon as we are able to.   

----------------------------------------------------------------------------------------------------------------------

****************************************************

Amendment 0001

****************************************************

Attached is RFP Amendment FA8207-21-R-0001-0001.  This amendment:

1. Adds the following provisions/clauses:

252.204-7019

252.204-7020

252.222-7999

2. Removes the following provisions/clauses:

252.215-7009

3. Provide the following updated Attachments:

Attachment 3 Labor Quantity Workbook Master

Attachment 7 Government Rights in Data and Software (GRIDS)

Attachment 8 Labor Rate Matrix

Attachment 9 Labor Category Mapping Workbook

Attachment 13 Draft CLIN Structure for Task Order 1 MMIII Directorate

Attachment 15 Draft CLIN Structure for Task Order 3 MMIII Acquisition Support

Attachment 17 Draft CLIN Structure for Task Order 5 GBSD Enterprise

Attachment 18 ISC 2.0 PWS ATO1 MMIII Directorate Support

Attachment 22 ISC 2.0 PWS ATO5 GBSD

Attachment 23 Section L

Attachment 24 Section M

Attachment 25 Task Order CLIN Numbering

4. Further, attached to this listing is the RFP CRM Questions and Answers 1 (17-Dec-20).  This is the list of questions/comments submitted by Industry along with the government responses to each question. 

----------------------------------------------------------------------------------------------------------------------

Update #4 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM Part 2

****************************************************

The government appreciates all of the questions and comments from Industry regarding the ISC 2.0 RFP.  We asked that the potential offerors please have their questions and comments submitted by Wednesday December 2.  Since that day, we have received many additional questions and comments.  At this point, as soon as we have all the questions answered and ready to send to our Legal Department for review, we get another couple batches of questions.  This cycle is making it so that we are not able to get the initial batch of questions through Legal review and posted.  Therefore, the government would ask that all the potential offerors please hold any additional questions and comments until we are able to post out the initial batch.  Many of the new questions coming in are questions that have been asked by other offerors, so they will be answered once everyone gets to see all the questions and all the answers.  Thanks for your consideration and patience as we are working through these and we will get them posted as soon as we are able to.   

----------------------------------------------------------------------------------------------------------------------

Update #3 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

----------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

----------------------------------------------------------------------------------------------------------------------

****************************************************

Answers to the Questions/Comments via CRM

****************************************************

Due to the volume of the questions and comments received from Industry, the government is still working through the responses to all of the questions and making the appropriate updates to the documents.  As soon as we are able to get the questions answered and verified through our Legal Department, we will post the CRM with all the questions and answers for all potential offerors to see.  Shortly after we will issue an amendment to the solicitation attaching the updated documents that have been changed due to the questions and comments. 

For any comments, questions, or concerns please email afnwc.pzbc.isc2@us.af.mil.

----------------------------------------------------------------------------------------------------------------------

Update #2 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

****************************************************

Questions/Comments Regarding the RFP

****************************************************

Now that you have had time to review the RFP, we would ask that if you have any questions or comments, to please send them in using the CRM format used during the Draft RFP phase as soon as possible.  We would like to consolidate all of the questions and concerns and then post out the government’s responses including updated documents that are changed based on these questions.  In order to limit the number of RFP Amendments, we would ask that you get those in as soon as possible (Wednesday, December 2, 2020 by COB if possible).

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Update #1 ·

This acquisition is to provide Systems Engineering and Integration (SE&I) support for both the Minuteman III Weapon SPO and the Ground Based Strategic Deterrence Weapon SPO.

Attachments

Files attached to this notice, newest first
File Type Posted
Bidders Library Master List.xlsx XLSX spreadsheet
RFP CRM Questions and Answers 3 (7-Jan-2021).xlsx XLSX spreadsheet
FA820721R00010003.pdf PDF
Attachment 8 - Labor Rate Matrix (Updated 5-Jan-21).xlsx XLSX spreadsheet
Attachment 23 - Section L (Updated 6-Jan-2021).pdf PDF
RFP CRM Questions and Answers 2 (28-Dec-2020).xlsx XLSX spreadsheet
FA820721R00010002.pdf PDF
Attachment 23 - Section L (Updated 28-Dec-2020).pdf PDF
Attachment 24 - Section M (Updated 28-Dec-2020).pdf PDF
Attachment 8 - Labor Rate Matrix (Updated 17-Dec-20).xlsx XLSX spreadsheet
RFP CRM Questions and Answers 1 (17-Dec-20).xlsx XLSX spreadsheet
Attachment 18 - ISC2.0 PWS ATO1 MMIII DIRSUP (Updated 17-Dec-20).pdf PDF
Attachment 23 - Section L (Updated 17-Dec-20).pdf PDF
Attachment 25 - Task Order CLIN Numbering (Updated 17-Dec-20).pdf PDF
Attachment 22 - ISC2.0 PWS ATO5 GBSD (Updated 17-Dec-20).pdf PDF
FA820721R00010001.pdf PDF
Attachment 9 - Labor Category Mapping Workbook (Updated 17-Dec-20).xlsx XLSX spreadsheet
Attachment 24 - Section M (Updated 17-Dec-20).pdf PDF
Attachment 3 - Labor Quantity Workbook_Master (Updated 17-Dec-20).xlsx XLSX spreadsheet
Attachment 7 - Government Rights in Data and Software (GRIDS) (Updated 17-Dec-20).pdf PDF
Attachment 13 - Draft CLIN Structure for Task Order 1 MMIII Dir Supp (Updated 17-Dec-20).pdf PDF
Attachment 15 - Draft CLIN Structure for Task Order 3 MMIII Acquisition (Updated 17-Dec-20).pdf PDF
Attachment 17 - Draft CLIN Structure for Task Order 5 GBSD Enterprise (Updated 17-Dec-20).pdf PDF
Attachment 19 - ISC2.0 PWS ATO2 MMIII SUST (Updated 17-Dec-20).pdf PDF
Attachment 24 - Section M.pdf PDF
Attachment 19 - ISC2.0 PWS ATO2 MMIII SUST.pdf PDF
Attachment 15 - Draft CLIN Structure for Task Order 3 MMIII Acquisition.pdf PDF
Attachment 6 - Contract Data Requirements List (CDRL) Package.pdf PDF
Attachment 23 - Section L.pdf PDF
Attachment 10 - Appendix C Safety Plan.pdf PDF
Attachment 1 - BASIC PWS.pdf PDF
Attachment 20 - ISC2.0 PWS ATO3 MMIII ACQ.pdf PDF
Attachment 18 - ISC2.0 PWS ATO1 MMIII DIRSUP.pdf PDF
Attachment 17 - Draft CLIN Structure for Task Order 5 GBSD Enterprise.pdf PDF
Attachment 14 - Draft CLIN Structure for Task Order 2 MMIII Sustainment.pdf PDF
Attachment 13 - Draft CLIN Structure for Task Order 1 MMIII Directorate Support.pdf PDF
Attachment 12 - Cross Reference Matrix.xlsx XLSX spreadsheet
Attachment 9 - Labor Category Mapping Workbook.xlsx XLSX spreadsheet
Attachment 5 - GFP List.xlsx XLSX spreadsheet
FA820721R0001.pdf PDF
Attachment 25 - Task Order CLIN Numbering.pdf PDF
Attachment 22 - ISC2.0 PWS ATO5 GBSD.pdf PDF
Attachment 21 - ISC2.0 PWS ATO4 MMIII INTEG.pdf PDF
Attachment 16 - Draft CLIN Structure for Task Order 4 MMIII Integration.pdf PDF
Attachment 11 - DD254.pdf PDF
Attachment 8 - Labor Rate Matrix.xlsx XLSX spreadsheet
Attachment 7 - Government Rights in Data and Software (GRIDS).pdf PDF
Attachment 4 - Labor Categories and Qualifications.xlsx XLSX spreadsheet
Attachment 3 - Labor Quantity Workbook_Master.xlsx XLSX spreadsheet
Attachment 2 - Award Fee Plan.pdf PDF
Show all 50

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Integration Support Contract (ISC) 2. 0 This notice · Latest solicitation Solicitation
Integration Support Contract (ISC) 2. 0 Pre-Solicitation
Integration Support Contract (ISC) 2. 0 Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity