This document outlines a cost-plus-award-fee contract structure to provide engineering support services for the Ground Based Strategic Deterrent (GBSD) program across multiple weapon systems. Key details include:
-
The contractor shall provide full-time equivalents for engineering and technical services to support GBSD, Dem/Val, MK21A, Fuze, and SE&I per the attached performance work statement and labor quantity workbook.
-
Cost reimbursement contract line items cover engineering support services, travel and other direct costs. Award fees are established for evaluation periods to incentivize performance.
-
Option years extend services from 2021 through 2026. Deliverables include CDRLs and data rights per the DD Forms in Section J.
-
The Department of the Air Force Materiel Command Nuclear Weapons Center is the contracting agency. The contractor shall provide support at the locations and during the periods of performance specified.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER FOR SUPPLIES OR SERVICES RS
1. CONTRACT/PURCH ORDER/AGREEMENT NO.
FA820720D9999
2. DELIVERY ORDER/CALL NO.
FA8207-20-F-2005
3. DATE OF ORDER/CALL
(YYYYMMMDD)
4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY
DX: A2
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBB
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Justin Rogers/AFNWC justin.rogers.28@us.af.mil
Phone: (801) 586- 2580
7. ADMINISTERED BY (If other than 6) CODEFA8214 8. DELIVERY FOB
DESTINATION
OTHER
(See Schedule if other)
X
9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date)
(YYYYMMMDD)
SEE SCHEDULE
12. DISCOUNT TERMS
11. X IF BUSINESS IS
SMALL
SMALL
DISAD-VANTAGED
WOMEN-OWNED
13. MAIL INVOICES TO
SEE BLK 15
14. SHIP TO CODE
SEE LINE ITEM SCHEDULE
15. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.) MARK ALL
PACKAGES AND
PAPERS WITH
IDENTIFICATION
NUMBERS IN
BLOCKS 1 AND 2.
16.
TYPE
OF
ORDER
DELIVERY/
CALL
PURCHASE
X This delivery order/call is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract.
Reference your Dated: furnish the following terms specified herein.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
If this box is marked, supplier must sign Acceptance and return the following number of copies: (YYYYMMMDD)
18.
ITEM NO.
19.
SCHEDULE OF SUPPLIES/SERVICES
(SEE SCHEDULE)
20. QUANTITY
ORDERED/
ACCEPTED*
21.
UNIT
22.
UNIT PRICE
23.
AMOUNT
ROUTINE FAST PAY PROCEDURES APPLY
* If quantity accepted by the Government is same as quantity ordered, indicate by X. If different, enter actual quantity accepted below quantity ordered and encircle.
24. UNITED STATES OF AMERICA
BY: Kyle G. Chase kyle.chase@us.af.mil
CONTRACTING/ORDERING OFFICER - -
25. $
26.
DIFFERENCES
27a. QUANTITY IN COLUMN 20 HAS BEEN:
INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO
THE CONTRACT EXCEPT AS NOTED:
28. SHIP. NO.
PARTIAL
FINAL
29. D.O. VOUCHER NO.
36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.
31. PAYMENT
COMPLETE
PARTIAL
FINAL
32. PAID BY
30.
INITIALS
33. AMOUNT VERIFIED CORRECT FOR
34. CHECK NUMBER
35. BILL OF LADING NO.
37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED
(YYYYMMMDD)
40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.
DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
SEE SCHEDULE
SCD:A
EFT:T
ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE
(YYYYMMMDD)
d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
f. TELEPHONE NUMBER g. E-MAIL ADDRESS
a. DATE
(YYYYMMMDD)
b. SIGNATURE AND TITLE OF CONTRACTING OFFICER
Total
FA8207-20-F-2005
SUPPLIES OR SERVICES AND PRICES/COSTS
GBSD Engineering - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
II XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
The Total Award Fee amounts are held in Contingent Liability
Dem/Val - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Dem/Val - FTE
COST PLUS AWARD FEE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
MK21A - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Fuze - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GBSD SE&I - FTE
Item No.
Cost Plus Award Fee
GBSD SE&I - FTE
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GBSD Engineering - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
GBSD Engineering - CME
COST PLUS AWARD FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Dem/Val - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
MK21A - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Fuze - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
Fuze - CME
COST PLUS AWARD FEE
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GBSD SE&I - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
GBSD SE&I - CME
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GBSD Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Dem/Val - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
R425
Dem/Val - Travel & ODC
COST REIMBURSEMENT - NO FEE
Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
MK21A - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Fuze - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Fuze - Travel & ODC
COST REIMBURSEMENT - NO FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
GBSD SE&I - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2023
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J
Limitations of Liability: Other Than High Value Item
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
NOT SEPARATELY PRICED
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
GBSD Engineering - FTE Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 21 DEC 2023
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
IV XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee
MK21A - FTE
Option Year 1
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Fuze - FTE Option Year 1
COST PLUS AWARD FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
CME
Dem/Val - CME Option Year 1
COST PLUS AWARD FEE
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
MK21A - CME
Option Year 1
COST PLUS AWARD FEE
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
GBSD Engineering - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
Dem/Val - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
MK21A - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
MK21A - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
Fuze - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
GBSD SE&I - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
GBSD SE&I - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS
DATA RIGHTS
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A
GBSD Engineering - FTE Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
VI XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Dem/Val - FTE Option Year 1
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services
GBSD SE&I - FTE
Option Year 1
COST PLUS AWARD FEE
The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
MK21A - CME
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Fuze - CME Option Year 1
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Dem/Val - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Dem/Val - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
MK21A - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Fuze - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Fuze - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
GBSD SE&I - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: IAW Section J CDRLs and PWS
DATA RIGHTS
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
GBSD Engineering - FTE Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
Dem/Val - FTE Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services
Dem/Val - FTE Option Year 1
COST PLUS AWARD FEE
The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
VIII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GBSD SE&I - FTE
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
GBSD Engineering - CME Option Year 1
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Fuze - CME Option Year 1
COST PLUS AWARD FEE
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 5 and the Labor Quantity Workbook attached in section J.
GBSD SE&I - CME
Option Year 1
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
Dem/Val - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
MK21A - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
Fuze - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee
Fuze - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
GBSD SE&I - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2024 20 DEC 2025
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
Option Year 1
NOT SEPARATELY PRICED
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS
DATA RIGHTS
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE