Attachment 14 - Draft CLIN Structure for Task Order 2 MMIII Sustainment.pdf
PDF 193 KB Posted
- Attached to
- Integration Support Contract (ISC) 2. 0 Federal contract opportunity
- Solicitation number
- FA8207-21-R-0001
About this file
This document is an attachment to a task order solicitation for engineering and integration support services. The contractor will provide systems engineering and integration support for the Minuteman III and Ground Based Strategic Deterrence weapon programs, including field engineering technical services across multiple functional areas. The period of performance is from December 2021 through December 2026. Pricing will be cost plus award fee for labor and cost reimbursement for travel and other direct costs. The Air Force Materiel Command Nuclear Weapons Center is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER FOR SUPPLIES OR SERVICES RS
1. CONTRACT/PURCH ORDER/AGREEMENT NO.
FA820720D9999
2. DELIVERY ORDER/CALL NO.
FA8207-20-F-2002
3. DATE OF ORDER/CALL
(YYYYMMMDD)
4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY
DX: A2
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBC
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Stephen Gacioch/AFLCMC stephen.gacioch@us.af.mil
Phone: (801) 586- 8042
7. ADMINISTERED BY (If other than 6) CODEFA8207 8. DELIVERY FOB
DESTINATION
OTHER
(See Schedule if other)
9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date)
(YYYYMMMDD)
SEE SCHEDULE
12. DISCOUNT TERMS
11. X IF BUSINESS IS
SMALL
SMALL
DISAD-VANTAGED
WOMEN-OWNED
13. MAIL INVOICES TO
SEE BLK 15
14. SHIP TO CODE
SEE LINE ITEM SCHEDULE
15. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.) MARK ALL
PACKAGES AND
PAPERS WITH
IDENTIFICATION
NUMBERS IN
BLOCKS 1 AND 2.
16.
TYPE
OF
ORDER
DELIVERY/
CALL
PURCHASE
X This delivery order/call is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract.
Reference your Dated: furnish the following terms specified herein.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
If this box is marked, supplier must sign Acceptance and return the following number of copies: 1 (YYYYMMMDD)
18.
ITEM NO.
19.
SCHEDULE OF SUPPLIES/SERVICES
(SEE SCHEDULE)
20. QUANTITY
ORDERED/
ACCEPTED*
21.
UNIT
22.
UNIT PRICE
23.
AMOUNT
ROUTINE
* If quantity accepted by the Government is same as quantity ordered, indicate by X. If different, enter actual quantity accepted below quantity ordered and encircle.
24. UNITED STATES OF AMERICA
BY: Kyle G. Chase kyle.chase@us.af.mil
CONTRACTING/ORDERING OFFICER - -
X
25. $
26.
DIFFERENCES
27a. QUANTITY IN COLUMN 20 HAS BEEN:
INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO
THE CONTRACT EXCEPT AS NOTED:
28. SHIP. NO.
PARTIAL
FINAL
29. D.O. VOUCHER NO.
36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.
31. PAYMENT
COMPLETE
PARTIAL
FINAL
32. PAID BY
30.
INITIALS
33. AMOUNT VERIFIED CORRECT FOR
34. CHECK NUMBER
35. BILL OF LADING NO.
37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED
(YYYYMMMDD)
40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.
DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
SEE SCHEDULE
SCD:A
EFT:T
ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE
(YYYYMMMDD)
d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
f. TELEPHONE NUMBER g. E-MAIL ADDRESS
a. DATE
(YYYYMMMDD)
b. SIGNATURE AND TITLE OF CONTRACTING OFFICER
Total
FA8207-20-F-2002
SUPPLIES OR SERVICES AND PRICES/COSTS
GROUND ELECTRICAL - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
II XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
The Total Award Fee amounts are held in Contingent Liability
Field Support - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Field Support - FTE
COST PLUS AWARD FEE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Guidance - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Ground Mechanical - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Propulsion - FTE
Item No.
Cost Plus Award Fee
Propulsion - FTE
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RS/RV - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
RS/RV - FTE
COST PLUS AWARD FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ICBM Infrastructure and Equipment (IIE) - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GROUND ELECTRICAL - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Field Support - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Field Support - CME
COST PLUS AWARD FEE
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Guidance - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
Guidance - CME
COST PLUS AWARD FEE
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Ground Mechanical - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Propulsion - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RS/RV - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook
RS/RV - CME
COST PLUS AWARD FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ICBM Infrastructure and Equipment (IIE) - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
GROUND ELECTRICAL - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Field Support - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Limitations of Liability: Other Than High Value Item
Field Support - Travel & ODC
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Guidance - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Ground Mechanical - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Ground Mechanical - Travel & ODC
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
Propulsion - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
RS/RV - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
RS/RV - Travel & ODC
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
ICBM Infrastructure and Equipment (IIE) - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
NOT SEPARATELY PRICED
Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
GROUND ELECTRICAL - FTE
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
GROUND ELECTRICAL - FTE
Option Year 1
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
IV XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
Ground Mechanical - FTE Option Year 1
COST PLUS AWARD FEE
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Propulsion - FTE Option Year 1
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
GROUND ELECTRICAL - CME
Option Year 1
COST PLUS AWARD FEE
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Field Support - CME Option Year 1
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
Propulsion - CME Option Year 1
COST PLUS AWARD FEE
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
RS/RV - CME
Option Year 1
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
Field Support - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2022 20 DEC 2023
Guidance - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
Ground Mechanical - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
Propulsion - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Propulsion - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
RS/RV - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
ICBM Infrastructure and Equipment (IIE) - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
ICBM Infrastructure and Equipment (IIE) - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0072
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0072 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
DATA RIGHTS
Option Year 1
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA RIGHTS
Option Year 1
NOT SEPARATELY PRICED
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
GROUND ELECTRICAL - FTE
Option Year 1
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
VI XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Guidance - FTE Option Year 1
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
RS/RV - FTE
Option Year 1
COST PLUS AWARD FEE
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
ICBM Infrastructure and Equipment (IIE) - FTE Option Year 1
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
Guidance - CME Option Year 1
COST PLUS AWARD FEE
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
Ground Mechanical - CME Option Year 1
COST PLUS AWARD FEE
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 2 and the Labor Quantity Workbook
ICBM Infrastructure and Equipment (IIE) - CME Option Year 1
COST PLUS AWARD FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2023 20 DEC 2024
Field Support - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Guidance - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Ground Mechanical - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Ground Mechanical - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2023 20 DEC 2024
Propulsion - Travel & ODC Option Year 1
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High…
This is the start of the file's text. The full file is on GovTribe.