This document outlines a cost-plus-award-fee task order solicitation for engineering and integration support services. The solicitation seeks proposals to provide systems engineering and integration support for the Minuteman III and Ground Based Strategic Deterrence weapon programs. Interested offerors should respond by the specified date to be considered for an award period extending from December 2021 through December 2024. The selected contractor will receive cost reimbursement for labor hours and expenses, with an opportunity to earn award fees based on performance evaluations against criteria like schedule, cost, and technical success. The Air Force Materiel Command Nuclear Weapons Center will administer the contract on behalf of the weapon system program offices.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER FOR SUPPLIES OR SERVICES RS
1. CONTRACT/PURCH ORDER/AGREEMENT NO.
FA820720D9999
2. DELIVERY ORDER/CALL NO.
FA8207-20-F-2003
3. DATE OF ORDER/CALL
(YYYYMMMDD)
4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY
DX: A2
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBB
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Justin Rogers/AFNWC justin.rogers.28@us.af.mil
Phone: (801) 586- 2580
7. ADMINISTERED BY (If other than 6) CODEFA8214 8. DELIVERY FOB
DESTINATION
OTHER
(See Schedule if other)
9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date)
(YYYYMMMDD)
SEE SCHEDULE
12. DISCOUNT TERMS
11. X IF BUSINESS IS
SMALL
SMALL
DISAD-VANTAGED
WOMEN-OWNED
13. MAIL INVOICES TO
SEE BLK 15
14. SHIP TO CODE
SEE LINE ITEM SCHEDULE
15. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.) MARK ALL
PACKAGES AND
PAPERS WITH
IDENTIFICATION
NUMBERS IN
BLOCKS 1 AND 2.
16.
TYPE
OF
ORDER
DELIVERY/
CALL
PURCHASE
X This delivery order/call is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract.
Reference your Dated: furnish the following terms specified herein.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
If this box is marked, supplier must sign Acceptance and return the following number of copies: 1 (YYYYMMMDD)
18.
ITEM NO.
19.
SCHEDULE OF SUPPLIES/SERVICES
(SEE SCHEDULE)
20. QUANTITY
ORDERED/
ACCEPTED*
21.
UNIT
22.
UNIT PRICE
23.
AMOUNT
ROUTINE
########### Specified Date
* If quantity accepted by the Government is same as quantity ordered, indicate by X. If different, enter actual quantity accepted below quantity ordered and encircle.
24. UNITED STATES OF AMERICA
BY: Kyle G. Chase kyle.chase@us.af.mil
CONTRACTING/ORDERING OFFICER - -
X
25. $
26.
DIFFERENCES
27a. QUANTITY IN COLUMN 20 HAS BEEN:
INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO
THE CONTRACT EXCEPT AS NOTED:
28. SHIP. NO.
PARTIAL
FINAL
29. D.O. VOUCHER NO.
36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.
31. PAYMENT
COMPLETE
PARTIAL
FINAL
32. PAID BY
30.
INITIALS
33. AMOUNT VERIFIED CORRECT FOR
34. CHECK NUMBER
35. BILL OF LADING NO.
37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED
(YYYYMMMDD)
40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.
DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
SEE SCHEDULE
SCD:A
EFT:T
ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE
(YYYYMMMDD)
d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
f. TELEPHONE NUMBER g. E-MAIL ADDRESS
a. DATE
(YYYYMMMDD)
b. SIGNATURE AND TITLE OF CONTRACTING OFFICER
Total
FA8207-20-F-2003
SUPPLIES OR SERVICES AND PRICES/COSTS
ASU - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
II XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
The Total Award Fee amounts are held in Contingent Liability
RVA CLS - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
RVA CLS - FTE
COST PLUS AWARD FEE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RVA II - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
CMPT - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FRBP - FTE
Item No.
Cost Plus Award Fee
FRBP - FTE
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FT3 - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
FT3 - FTE
COST PLUS AWARD FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ICU II - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
LCCBU - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
PTR - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services
PTR - FTE
COST PLUS AWARD FEE
The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
SACCS-R - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
TERP - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
WarTak - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
PADS-CEIU - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Limitations of Liability: Other Than High Value Item
PADS-CEIU - FTE
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ASU - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RVA CLS - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RVA II - CME
Item No.
RVA II - CME
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
CMPT - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
CMPT - CME
COST PLUS AWARD FEE
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FRBP - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FT3 - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ICU II - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
ICU II - CME
COST PLUS AWARD FEE
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
LCCBU - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
LCCBU - CME
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
PTR - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
SACCS-R - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
TERP - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
R425
TERP - CME
COST PLUS AWARD FEE
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
WarTak - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
WarTak - CME
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
PADS-CEIU - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
The available Award Fee is established in the amount of $XX,XXX.XX
ASU - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
RVA CLS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
RVA II - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
CMPT - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
FRBP - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
FRBP - Travel & ODC
COST REIMBURSEMENT - NO FEE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
FT3 - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
ASU - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
ASU - Travel & ODC
COST REIMBURSEMENT - NO FEE
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
LCCBU - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
PTR - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
PTR - Travel & ODC
COST REIMBURSEMENT - NO FEE
Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
SACCS-R - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
TERP - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
TERP - Travel & ODC
COST REIMBURSEMENT - NO FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
WarTak - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
PADS-CEIU - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
PADS-CEIU - Travel & ODC
COST REIMBURSEMENT - NO FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0076
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0076 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Exhibit: A
DATA RIGHTS
NOT SEPARATELY PRICED
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2021 20 DEC 2022
ASU - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
IV XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee
RVA CLS - FTE
COST PLUS AWARD FEE
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
RVA II - FTE
COST PLUS AWARD FEE
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FRBP - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
FT3 - FTE
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
PTR - FTE
COST PLUS AWARD FEE
The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
WarTak - FTE
Item No.
WarTak - FTE
COST PLUS AWARD FEE
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
PADS-CEIU - FTE
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
RVA II - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
RVA II - CME
COST PLUS AWARD FEE
The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
CMPT - CME
COST PLUS AWARD FEE
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
FT3 - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
ICU II - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook
ICU II - CME
COST PLUS AWARD FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
LCCBU - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
PTR - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
SACCS-R - CME
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 DEC 2022 20 DEC 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
TERP - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 3 and the Labor Quantity Workbook attached in section J.
TERP - CME
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .