HVAC Equipment Replacement, Memphis
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12639523R0014
- Agency
- Marketing and Regulatory Programs Business Services Animal and Plant Health Inspection Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Bartlett, Tennessee 38133, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to replace HVAC equipment at the USDA AMS Cotton and Tobacco Program headquarters in Memphis, Tennessee. Offerors are requested to submit proposals to supply and install replacement chillers up to 200 tons, boilers up to 2821 MMBH output, a plate frame heat exchanger, cooling towers up to 200 tons, and air compressors up to 50 HP. Proposals will be evaluated on a life cycle cost basis for the chillers considering factors such as initial cost, energy use, maintenance costs, and lead times over a 20-year period. Other equipment will be selected based on weighted criteria of initial cost, efficiency, and lead time. Proposals are due by June 8, 2023.
The set-aside is designated for total small business. The NAICS code is 238220 and PSC code R499. Proposals are sought to replace specific HVAC equipment within the listed ranges at the Bartlett, Tennessee facility. Evaluation will be based on life cycle cost for chillers and weighted criteria for other equipment. Award of multiple proposal packages is anticipated with an estimated value over $500,000 to be completed within 180 days of notice to proceed.
Notice text
8 versions
Update #8 · Latest ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Amendment 0003 documents are posted below.
In response to questions received from an interested vendor:
- As-built drawings are not available.
- A permit is not expected to be required for this project.
Amendment 0004 is posted below.
Amendment 0005 is posted below.
Amendment 0006 is posted below.
Amendment 0007 posted below--it extends the time that proposals are due to 3 p.m. CT today.
Update #7 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Amendment 0003 documents are posted below.
In response to questions received from an interested vendor:
- As-built drawings are not available.
- A permit is not expected to be required for this project.
Amendment 0004 is posted below.
Amendment 0005 is posted below.
Amendment 0006 is posted below.
Update #6 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Amendment 0003 documents are posted below.
In response to questions received from an interested vendor:
- As-built drawings are not available.
- A permit is not expected to be required for this project.
Amendment 0004 is posted below.
Amendment 0005 is posted below.
Update #5 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Amendment 0003 documents are posted below.
In response to questions received from an interested vendor:
- As-built drawings are not available.
- A permit is not expected to be required for this project.
Amendment 0004 is posted below.
Update #4 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Amendment 0003 documents are posted below.
In response to questions received from an interested vendor:
- As-built drawings are not available.
- A permit is not expected to be required for this project.
Update #3 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Amendment 0002 and the site visit attendance sheet are posted below.
Update #2 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Amendment 0001 posted below.
Update #1 ·
The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.
The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.
Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.
Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.
Solicitation and attachments are posted below.
Attachments
| File | Type | Posted |
|---|---|---|
| 12639523R0014-0007.pdf | ||
| 12639523R0014-0006.pdf | ||
| 12639523R0014-0005.pdf | ||
| 12639523R0014-0004.pdf | ||
| Amendment 0003_Equipment Present Worth Analysis 2023May18.xlsx | XLSX spreadsheet | |
| 12639523R0014-0003.pdf | ||
| USDA Memphis Mechanical Mod pre bid attendance sheet.pdf | ||
| Memphis TN Mechanical Mod pre-bid site visit.xlsx | XLSX spreadsheet | |
| 12639523R0014-0002.pdf | ||
| 12639523R0014-0001.pdf | ||
| Atch 6_Equipment Present Worth Analysis.xlsx | XLSX spreadsheet | |
| Atch 4_ proposal package schedule.pdf | ||
| Atch 2_Specifications.pdf | ||
| Atch 5_Structural Drawings.pdf | ||
| Atch 1_federal construction wage rates_Shelby County.pdf | ||
| Atch 3_Drawings.pdf | ||
| 12639523R0014.pdf |
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| HVAC Equipment Replacement, Memphis | Award Notice | |
| HVAC Equipment Replacement, Memphis | Solicitation | |
| HVAC Equipment Replacement, Memphis | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity