Atch 4_ proposal package schedule.pdf
PDF 136 KB Posted
- Attached to
- HVAC Equipment Replacement, Memphis Federal contract opportunity
- Solicitation number
- 12639523R0014
About this file
This solicitation seeks replacement HVAC equipment for a USDA facility in Memphis, Tennessee. Offerors are to provide multiple selections from manufacturers such as Carrier, Daikin, Trane and York for one to three 200-ton chillers, one to three 2821 MBH steam boilers, a plate frame heat exchanger, one to three 200-ton cooling towers, and one or two 40-50HP air compressors with dryers. Selection criteria include first cost, efficiency, maintenance cost and lead time for the chillers. Other equipment will be selected based on first cost, efficiency and lead time. Offerors must submit performance data and costs for all proposed equipment meeting the capacities specified. Proposal packages should be submitted for each item and manufacturer based on selection criteria such as shortest lead time or lowest first cost. Award will be made based on life cycle cost and delivery time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12639523R0014-0007.pdf | ||
| 12639523R0014-0006.pdf | ||
| 12639523R0014-0005.pdf | ||
| 12639523R0014-0004.pdf | ||
| 12639523R0014-0003.pdf | ||
| Amendment 0003_Equipment Present Worth Analysis 2023May18.xlsx | XLSX spreadsheet | |
| Memphis TN Mechanical Mod pre-bid site visit.xlsx | XLSX spreadsheet | |
| 12639523R0014-0002.pdf | ||
| USDA Memphis Mechanical Mod pre bid attendance sheet.pdf | ||
| 12639523R0014-0001.pdf | ||
| Atch 6_Equipment Present Worth Analysis.xlsx | XLSX spreadsheet | |
| Atch 2_Specifications.pdf | ||
| Atch 3_Drawings.pdf | ||
| 12639523R0014.pdf | ||
| Atch 5_Structural Drawings.pdf | ||
| Atch 1_federal construction wage rates_Shelby County.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL PACKAGE SCHEDULE - USDA AMS Cotton and Tobacco HQ, Memphis, TN
REFER TO BID FORM FOR INFORMATION REQUIRED UNDER EACH BID PACKAGE 4/25/2023
BID PACKAGE DESIGNATION EQUIPMENT REPLACED CAPACITY EXISTING MODEL NUMBER SELECTION CRITERIA DESCRIPTION OF WORK
1A - 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER
215 GROSS, 200 NET
TONS
TRANE
RTHB215FLB00EWP000UNN3LF2LF0000
SHORTEST LEAD TIME
REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND
ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION
1B- 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER
215 GROSS, 200 NET
TONS
TRANE
RTHB215FLB00EWP000UNN3LF2LF0000
LOWEST FIRST COST
REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND
ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION
1C - 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER
215 GROSS, 200 NET
TONS
TRANE
RTHB215FLB00EWP000UNN3LF2LF0000
HIGHEST EFFICIENCY
REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND
ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION
1D- 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER
215 GROSS, 200 NET
TONS
TRANE
RTHB215FLB00EWP000UNN3LF2LF0000
BEST COMBINATION
REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND
ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION
2 PLATE FRAME HEAT EXCHANGER
240 TONS, 45F LCHWT AT
43F ECWT; 480 GPM
ALFA LAVAL 30101-95949 MIN. 873 SF SURFACE REPLACE EXISTING PLATE-FRAME HEAT EXCHANGER AND VALVES. REUSE PNEUMATIC ACTUATORS
3A-1,2,3 STEAM BOILER - GAS FIRED, FORCED DRAFT
15 PSI, 2821 MBH
OUTPUT
BURNHAM EL-80-G-GP, SN 22604,5,6 LOWEST FIRST COST REPLACE EXISTING LOW PRESSURE STEAM BOILER AND FORCED DRAFT BURNER
3B-1,2,3 STEAM BOILER - GAS FIRED, FORCED DRAFT
15 PSI, 2821 MBH
OUTPUT
BURNHAM EL-80-G-GP, SN 22604,5,6 HIGHEST EFFICIENCY REPLACE EXISTING LOW PRESSURE STEAM BOILER AND FORCED DRAFT BURNER
4A-1,2,3 COOLING TOWER - 7'10"X8'-11.5", ON EXISTING SUPPORTS
200 TONS, 600 GPM,
95/85/78F, 20HP
EVAPCO AT8-99B, S/N 942781M, 10-
386892, 942783M ALL STAINLESS REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED
4B-1,2,3 COOLING TOWER - 7'10"X8'-11.5", ON EXISTING SUPPORTS
200 TONS, 600 GPM,
95/85/78F, 20HP
EVAPCO AT8-99B, S/N 942781M, 10-
386892, 942783M
ALL STAINLESS AND
FIBERGLASS
REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED
4C-1,2,3 COOLING TOWER - 7'10"X8'-11.5", ON EXISTING SUPPORTS
200 TONS, 600 GPM,
95/85/78F, 20HP
EVAPCO AT8-99B, S/N 942781M, 10-
386892, 942783M LOWEST FIRST COST REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED
5A-1,2 SOUTH AIR COMPRESSOR, AIR DRYER, ACCESSORIES 50 HP
QUINCY QGD-50 COMPRESSOR WITH
QPNC200 AIR DRYER
QUINCY ONLY REPLACE EXISTING COMPRESSOR, REFRIGERATED AIR DRYER, AND FILTERS AS DETAILED.
5B-1,2 NORTH AIR COMPRESSOR, AIR DRYER, ACCESSORIES 50 HP
QUINCY QGV-50 COMPRESSOR WITH
QPNC200 AIR DRYER
OTHER BRANDS REPLACE EXISTING COMPRESSOR, REFRIGERATED AIR DRYER, AND FILTERS AS DETAILED.
12639523R0014, Attachment 4