Chiller NPW Calc
| USDA Memphis Life Cycle Cost Purchase - Present Worth Analysis | | | | | | |
| Chillers | Date: | 4/25/23 | | | | |
| | Vbl Name | | | | |
| Net Cooling Capacity, Tons | 200 | T | | | | |
| Chiller Life, years | 20 | y | | | | |
| Inflation Rate, per year | 3.00% | i | | | | |
| Initial Cost of Chiller, Dollars | | FC | | | | |
| IPLV, KW/ton at AHRI 550 Conditions | | IPLV | | | | |
| Cost of Electricity, $/KWH | $ 0.0750 | r | | | | |
| Refrigerant Proposed | | | | | | |
| Sound, dBA | | | | | | |
| Hours per year | 8760 | | | | | Two Chiller Ops |
| | | | | | 50% |
| IPLV Calculation | Load % | Load Tons | Time % | Hours | Ton-Hours | Ton-Hours |
| A | 100% | 200 | 1% | 87.6 | 17,520 | 8,760 |
| B | 75% | 150 | 42% | 3679.2 | 551,880 | 275,940 |
| C | 50% | 100 | 45% | 3942 | 394,200 | 197,100 |
| D | 25% | 50 | 12% | 1051.2 | 52,560 | 26,280 |
| | | 100% | 8,760 | 1,016,160 | 508,080 |
| Annual Energy Cost | IPLV | Ton-Hours | Energy Cost | Annual Energy Cost | | |
| 0.000 | 508,080 | $ 0.0750 | $ - 0 | | |
| KW/ton | ton hours | $/KWH | | | |
| Present Worth Cost Component | | | | | | |
| First Cost | $ - 0 | | | | | |
| Energy Cost | $ - 0 | | | | | |
| Net Present Cost | $ - 0 | | | | | |
| Project Duration, Consecutive Calendar Days | | | | | | |
Boiler NPW Calc
| USDA Memphis Life Cycle Cost Purchase - Present Worth Analysis | | | | | | |
| Boilers | | | | | | |
| | Vbl Name | | | | |
| Net Heating Output Capacity, MBH | 2821 | MBH | or LBS/HR | | | |
| Boiler Life, years | 20 | y | | | | |
| Inflation Rate, per year | 3.00% | i | | | | |
| Initial Cost of Boiler, Dollars | | FC | | | | |
| AFUE % | 80% | % | | | | |
| Cost of Natural Gas, $/MMBTU | $ 2.5000 | r | | | | |
| Heating value of gas, BTU/cubic Foot | 1.0370 | | | | | |
| Hours per year | 8760 | | | | | Two Boiler Ops |
| | | | | | 50% |
| Load Curve Calculation | Load % | Load MBH | Time % | Hours | MBH-HRs | MBH-hrs |
| A | 100% | 2,821 | 1% | 87.6 | 247,120 | 123,560 |
| B | 75% | 2,116 | 42% | 3679.2 | 7,784,267 | 3,892,134 |
| C | 50% | 1,411 | 45% | 3942 | 5,560,191 | 2,780,096 |
| D | 25% | 705 | 12% | 1051.2 | 741,359 | 370,679 |
| | | 100% | 8,760 | 14,332,937 | 7,166,468 |
| Annual Energy Cost | AFUE | MCF | Energy Cost | Annual Energy Cost | | |
| 80.00% | 6,911 | | $ - 0 | | |
| % | | $/MCF | | | |
| Present Worth Cost Component | | | | | | |
| First Cost | $ - 0 | | | | | |
| Energy Cost | $ - 0 | | | | | |
| Net Present Cost | $ - 0 | | | | | |
| Project Duration, Consecutive Calendar Days | | | | | | |
1-A,B,C,D-1
| USDA Memphis Major Equipment Replacement - Bid Package 1 Bid Form | |
| Chiller Replacement - Chiller 1 | Duplicate this form as many times as necessary (one per each manufacturer's chiller option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
Project Duration - Consecutive Calendar Days Days
| Option Designation (1A-1, 1B-1, 1C-1, 1D-1, etc.) | |
| Chiller Manufacturer for this Option: | |
| Chiller Model Number for this Option: | |
| Chiller Capacity, net tons at scheduled conditions: | tons |
| Refrigerant Proposed: | |
| Five Year Maintenance Cost (See specifications): | Dollars |
| AHRI 550 IPLV, KW/ton | KW/ton |
| Minimum Continuous Condenser Water Temperature for this chiller, Deg. F. | Deg. F. |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Chiller submittal - ARI Certified Capacity and IPLV Performance at scheduled conditions | (Y/N) |
| Chiller submittal - Weight, Dimensions | (Y/N) |
| Chiller submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Chiller submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Chiller 1, including controls integration | (Y/N) |
| Factory Startup of Chiller 1 | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
1-A,B,C,D-2
| USDA Memphis Major Equipment Replacement - Bid Package 1 Bid Form | |
| Chiller Replacement - Chiller 2 | Duplicate this form as many times as necessary (one per each manufacturer's chiller option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 1-A,B,C,D-1, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 1-A,B,C,D-1, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Chiller 1 Replacement (Additive) | Days |
| Option Designation (1A-2, 1B-2, 1C-2, 1D-2, etc.) | |
| Chiller Manufacturer for this Option: | |
| Chiller Model Number for this Option: | |
| Chiller Capacity, net tons at scheduled conditions: | tons |
| Refrigerant Proposed: | |
| AHRI 550 IPLV, KW/ton | KW/ton |
| Minimum Continuous Condenser Water Temperature for this chiller, Deg. F. | Deg. F. |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Chiller submittal - ARI Certified Capacity and IPLV Performance at scheduled conditions | (Y/N) |
| Chiller submittal - Weight, Dimensions | (Y/N) |
| Chiller submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Chiller submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Chiller 2, including controls integration | (Y/N) |
| Factory Startup of Chiller 2 | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
1-A,B,C,D-3
| USDA Memphis Major Equipment Replacement - Bid Package 1 Bid Form | |
| Chiller Replacement - Chiller 3 | Duplicate this form as many times as necessary (one per each manufacturer's chiller option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 1-A,B,C,D-1&2, Written | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 1-A,B,C,D-1&2, Numerical | Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Chiller 1&2 Replacement (Additive) | Days |
| Option Designation (1A-3, 1B-3, 1C-3, 1D-3, etc.) | |
| Chiller Manufacturer for this Option: | |
| Chiller Model Number for this Option: | |
| Chiller Capacity, net tons at scheduled conditions: | tons |
| Refrigerant Proposed: | |
| AHRI 550 IPLV, KW/ton | KW/ton |
| Minimum Continuous Condenser Water Temperature for this chiller, Deg. F. | Deg. F. |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Chiller submittal - ARI Certified Capacity and IPLV Performance at scheduled conditions | (Y/N) |
| Chiller submittal - Weight, Dimensions | (Y/N) |
| Chiller submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Chiller submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Chiller 2, including controls integration | (Y/N) |
| Factory Startup of Chiller 3 | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
| USDA Memphis Major Equipment Replacement - Bid Package 2 Bid Form | |
| Plate Heat Exchanger Replacement (PHX) | Duplicate this form as many times as necessary (one per each manufacturer's PHX option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Project Duration - Consecutive Calendar Days | Days |
| Option Designation (Bid Package 2) | |
| PHX Manufacturer for this Option: | |
| PHX Model Number for this Option: | |
| PHX Capacity, net tons at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| PHX submittal - ARI Certified Capacity at scheduled conditions | (Y/N) |
| PHX submittal - Weight, Dimensions | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of PHX, including controls integration | (Y/N) |
| Factory Startup of PHX | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
3-A,B,C-1
| USDA Memphis Major Equipment Replacement - Bid Package 3 Bid Form | |
| Steam Boiler Replacement - Boiler 1 | Duplicate this form as many times as necessary (one per each manufacturer's Boiler option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
Project Duration - Consecutive Calendar Days Days
| Option Designation (3A-1, 3B-1, 3C-1, 3D-1, etc.) | |
| Boiler Manufacturer for this Option: | |
| Boiler Model Number for this Option: | |
| Boiler Capacity, net MBH at scheduled conditions: | MBH |
| AFUE Efficiency, Percent | % |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Boiler submittal - Certified Capacity and Performance at scheduled conditions | (Y/N) |
| Boiler submittal - Weight, Dimensions | (Y/N) |
| Boiler submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Boiler 1, including controls integration | (Y/N) |
| Factory Startup of Boiler 1 | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
3-A,B,C-2
| USDA Memphis Major Equipment Replacement - Bid Package 3 Bid Form | |
| Steam Boiler Replacement - Boiler 2 | Duplicate this form as many times as necessary (one per each manufacturer's Boiler option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 3-A,B,C,D-1, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 3-A,B,C,D-1, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Boiler 1 Replacement (Additive) | Days |
| Option Designation (3A-2, 3B-2, 3C-2, 3D-2, etc.) | |
| Boiler Manufacturer for this Option: | |
| Boiler Model Number for this Option: | |
| Boiler Capacity, net MBH at scheduled conditions: | MBH |
| AFUE Efficiency, Percent | % |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Boiler submittal - Certified Capacity and Performance at scheduled conditions | (Y/N) |
| Boiler submittal - Weight, Dimensions | (Y/N) |
| Boiler submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Boiler 1, including controls integration | (Y/N) |
| Factory Startup of Boiler 1 | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
3-A,B,C-3
| USDA Memphis Major Equipment Replacement - Bid Package 3 Bid Form | |
| Steam Boiler Replacement - Boiler 3 | Duplicate this form as many times as necessary (one per each manufacturer's Boiler option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 3-A,B,C,D-1&2, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 3-A,B,C,D-1&2, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Boiler 1&2 Replacement (Additive) | Days |
| Option Designation (3A-3, 3B-3, 3C-3, 3D-3, etc.) | |
| Boiler Manufacturer for this Option: | |
| Boiler Model Number for this Option: | |
| Boiler Capacity, net MBH at scheduled conditions: | MBH |
| AFUE Efficiency, Percent | % |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Boiler submittal - Certified Capacity and Performance at scheduled conditions | (Y/N) |
| Boiler submittal - Weight, Dimensions | (Y/N) |
| Boiler submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Boiler 1, including controls integration | (Y/N) |
| Factory Startup of Boiler 1 | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
4-A,B-1
| USDA Memphis Major Equipment Replacement - Bid Package 4 Bid Form | |
| Cooling Tower Replacement - CT- 1 | Duplicate this form as many times as necessary (one per each manufacturer's Cooling Tower option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
Project Duration - Consecutive Calendar Days Days
| Option Designation (1A-1, 4B-1, 4C-1, etc.) | |
| Cooling Tower Manufacturer for this Option: | |
| Cooling Tower Model Number for this Option: | |
| Cooling Tower Capacity, net tons at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Cooling Tower submittal - CTI Certified Capacity | (Y/N) |
| Cooling Tower submittal - Weight, Dimensions | (Y/N) |
| Cooling Tower submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Cooling Tower submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Cooling Tower 1, including controls integration and Valve Relocations | (Y/N) |
| Factory Startup of Cooling Tower 1 | (Y/N) |
| TAB report for condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
4-A,B-2
| USDA Memphis Major Equipment Replacement - Bid Package 4 Bid Form | |
| Cooling Tower Replacement - CT-2 | Duplicate this form as many times as necessary (one per each manufacturer's Cooling Tower option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 4-A,B,C-1, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 4-A,B,C-1, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Cooling Tower 1 Replacement (Additive) | Days |
| Option Designation (4A-2, 4B-2, 4C-2, etc.) | |
| Cooling Tower Manufacturer for this Option: | |
| Cooling Tower Model Number for this Option: | |
| Cooling Tower Capacity, Heat of Rejection at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Cooling Tower submittal - CTI Certified Capacity at scheduled conditions | (Y/N) |
| Cooling Tower submittal - Weight, Dimensions | (Y/N) |
| Cooling Tower submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Cooling Tower submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Cooling Tower 2, including controls integration and valve relocations | (Y/N) |
| Factory Startup of Cooling Tower 2 | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
4-A,B-3
| USDA Memphis Major Equipment Replacement - Bid Package 4 Bid Form | |
| Cooling Tower Replacement - CT-3 | Duplicate this form as many times as necessary (one per each manufacturer's Cooling Tower option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 4-A,B,C-1&2, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 4-A,B,C-1&2, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Cooling Tower 1&2 Replacement (Additive) | Days |
| Option Designation (4A-3, 4B-3, 4C-3, etc.) | |
| Cooling Tower Manufacturer for this Option: | |
| Cooling Tower Model Number for this Option: | |
| Cooling Tower Capacity, Heat of Rejection at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Cooling Tower submittal - CTI Certified Capacity at scheduled conditions | (Y/N) |
| Cooling Tower submittal - Weight, Dimensions | (Y/N) |
| Cooling Tower submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Cooling Tower submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Structural Analysis and Rigging Plan | (Y/N) |
| Labor, materials, overhead, profit for complete scope of installation of Cooling Tower 3, including controls integration and valve relocations | (Y/N) |
| Factory Startup of Cooling Tower 3 | (Y/N) |
| TAB report for Chilled and condenser water flows | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
5-A,B-1
| USDA Memphis Major Equipment Replacement - Bid Package 5 Bid Form | |
| Air Compressor Replacement - AC- 1 | Duplicate this form as many times as necessary (one per each manufacturer's Air Compressor option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
Project Duration - Consecutive Calendar Days Days
| Option Designation (4A-1, 4B-1, etc.) | |
| Air Compressor Manufacturer for this Option: | |
| Air Compressor Model Number for this Option: | |
| Air Compressor Capacity, SCFM at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Air Compressor submittal - Certified Capacity | (Y/N) |
| Air Compressor submittal - Weight, Dimensions | (Y/N) |
| Air Compressor submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Air Compressor submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Labor, materials, overhead, profit for complete scope of installation of Air Compressor 1 | (Y/N) |
| Factory Startup of Air Compressor 1 | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |
5-A,B-2
| USDA Memphis Major Equipment Replacement - Bid Package 5 Bid Form | |
| Air Compressor Replacement - AC-2 | Duplicate this form as many times as necessary (one per each manufacturer's Air Compressor option) and submit. |
| Note: Bidders shall complete each and every blank affirmatively on this form in order for the bid to be responsive. | |
| Bid of (Contractor Name) | |
| Contractor Address | |
| Contractor Contact Person (Name) | |
| Contractor Contact Person (Telephone ) | |
| Contractor Contact Person (Email) | |
| Bid Amount - US Dollars, Written | Dollars |
| Bid Amount - US Dollars Numerical | Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 5-A,B-1, Written | Add/Deduct Dollars |
| Bid Amount - Add or Deduct for simultaneous award of Bid Package 5-A,B-1, Numerical | Add/Deduct Dollars |
| Additional Project Duration - Additional Consecutive Calendar Days if awarded simutaneous to Air Compressor 1 Replacement (Additive) | Days |
| Option Designation (5A-2, 5B-2, etc.) | |
| Air Compressor Manufacturer for this Option: | |
| Air Compressor Model Number for this Option: | |
| Air Compressor Capacity, SCFM at scheduled conditions: | tons |
| Attached Certifications Check List - Y/N if provided - Attached to this Bid Form | |
| Air Compressor submittal - Certified Capacity at scheduled conditions | (Y/N) |
| Air Compressor submittal - Weight, Dimensions | (Y/N) |
| Air Compressor submittal - Sound Profile dbA in 8 octave bands | (Y/N) |
| Air Compressor submittal - Electrical Data - MCA, MOP, FLA etc. | (Y/N) |
| Bid Amount Includes the following (Y/N): | |
| Labor, materials, overhead, profit for complete scope of installation of Air Compressor 2 | (Y/N) |
| Factory Startup of Air Compressor 2 | (Y/N) |
| All Contract Requirements met | (Y/N) |
| Seal of the Contractor | |
| Signature of the Contractor's Representative, Date | _________________________________________________________________________________ |