This solicitation package seeks proposals to replace HVAC equipment at a USDA facility in Memphis, Tennessee. Offerors are asked to submit equipment selections and pricing for one to three 200-ton chillers, one to three steam or natural gas boilers outputting 2821 MBH, a plate frame heat exchanger, one to three 200-ton cooling towers, and one or two 40-50HP air compressors. Chiller selections must include performance data and costs for the shortest lead time, lowest cost, most efficient, and best combination options from manufacturers including Carrier, Daikin, Trane, and York. Proposals will be evaluated on life cycle cost, efficiency, lead time, and weighted criteria. Pricing should be submitted for each equipment item.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12639523R0014-0007.pdf | ||
| 12639523R0014-0006.pdf | ||
| 12639523R0014-0005.pdf | ||
| 12639523R0014-0004.pdf | ||
| Amendment 0003_Equipment Present Worth Analysis 2023May18.xlsx | XLSX spreadsheet | |
| 12639523R0014-0003.pdf | ||
| Memphis TN Mechanical Mod pre-bid site visit.xlsx | XLSX spreadsheet | |
| 12639523R0014-0002.pdf | ||
| USDA Memphis Mechanical Mod pre bid attendance sheet.pdf | ||
| 12639523R0014-0001.pdf | ||
| 12639523R0014.pdf | ||
| Atch 6_Equipment Present Worth Analysis.xlsx | XLSX spreadsheet | |
| Atch 4_ proposal package schedule.pdf | ||
| Atch 2_Specifications.pdf | ||
| Atch 1_federal construction wage rates_Shelby County.pdf | ||
| Atch 3_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12639523R0014, Attachment 5
Scott Text Box
SOLICITATION ATTACHMENT:
ORIGINAL STRUCTURAL DRAWINGS BY CSME SYSTEMS FOR THE CONSTRUCTION OF THE 1994 MEMPHIS LAB
ALSO INCLUDED ARE THE A2H CATWALK PLANS FOR THE CATWALK ADDED IN 2013
CD - CONTRACT DOCUMENTS
CR - CONTRACTOR RESPONSIBILITIES
DC - DESIGN CRITERIA
SE - SOILS AND EARTHWORK
SF - SHALLOW FOUNDATIONS (ASSUMED)
CO - CONCRETE
SS - STRUCTURAL STEEL
PG - PLATFORM GRATING
SU - SUBMITTALS
RS - REINFORCING STEEL
THE CONTRACT DOCUMENTS.
CD.1
CD.2
CD.3
SPECIFICALLY STATED OTHERWISE.
STRUCTURAL ENGINEER FOR CLARIFICATION IN THE FORM OF A REQUEST FOR
NO PERSON OR ANY REFERENCED STANDARD SPECIFICATION, MANUAL OR CODE
(WHETHER OR NOT SPECIFICALLY INCORPORATED BY REFERENCE IN THE CONTRACT
DOCUMENTS) SHALL BE EFFECTIVE TO CHANGE THE DUTIES AND RESPONSIBILITIES OF
THE OWNER, CONTRACTOR,ENGINEER, SUPPLIER, OR ANY OF THE CONSULTANTS,
AGENTS, OR EMPLOYEES FROM THOSE SET FORTH IN THE CONTRACT
DOCUMENTS. NOR SHALL IT BE EFFECTIVE TO ASSIGN TO THE STRUCTURAL
ENGINEER OF RECORD OR ANY OF THE STRUCTURAL ENGINEER OF RECORD'S
CONSULTANTS, AGENTS, OR EMPLOYEES ANY DUTY OR AUTHORITY TO SUPERVISE
OR DIRECT THE FURNISHING OR PERFORMANCE OF THE WORK OR ANY DUTY OR
AUTHORITY TO UNDERTAKE RESPONSIBILITIES CONTRARY TO THE PROVISIONS OF
CONTRACT DOCUMENTS INCLUDE, BUT ARE NOT LIMITED TO, THE STRUCTURAL
DOCUMENTS (DRAWINGS AND SPECIFICATIONS). "DRAWINGS" MEANS THE LATEST
DRAWINGS, VENDOR DRAWINGS, OR MATERIAL PREPARED AND SUBMITTED BY THE
REFERENCE TO STANDARD SPECIFICATIONS (CONCERNING STRUCTURAL DESIGN) OF
ANY TECHNICAL SOCIETY, ORGANIZATION, OR ASSOCIATION OR TO CODES OF LOCAL
OR STATE AUTHORITIES, SHALL MEAN THE LATEST STANDARD CODES, SPECIFICATION
OR TENTATIVE SPECIFICATION ADOPTED AT THE DATE OF TAKING BIDS, UNLESS
IN THE EVENT CONTRACT DOCUMENTS CONFLICT WITH THE CODE OF PRACTICE OR
SPECIFICATIONS OF ACI, PCI, AISC, AISI, SJI, OR OTHER STANDARDS, CONTACT
NOTES AND SPECIFIC DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER
GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS. CONTACT THE STRUCTURAL
ENGINEER FOR A DETERMINATION OF INTENT BEFORE PROCEEDING WITH RELATED
WORK IF THERE IS ANY DISCREPANCY OR QUESTION REGARDING WHICH NOTE OR
SPECIFICATION TO FOLLOW.
INFORMATION (RFI).
CD.4 ALL DETAILS, SECTIONS, AND NOTES ON THE DRAWINGS ARE INTENDED TO BE
TYPICAL WHERE CONDITIONS ARE SIMILAR TO THOSE INDICATED BY DETAIL, DETAIL
TITLE OR NOTE.
CD.5 USE ONLY DIMENSIONS INDICATED ON DRAWINGS. DO NOT SCALE DRAWINGS OR
USE ANY DIMENSIONS TAKEN FROM ELECTRONIC FILES.
CD.7
CD.6
STRUCTURAL DESIGN DRAWINGS, U.N.O., "SPECIFICATIONS" MEANS THE LATEST
PROJECT SPECIFICATIONS, U.N.O. CONTRACT DOCUMENTS DO NOT INCLUDE SHOP
CONTRACTOR.
CR.1
CR.2
CR.6
CR.10
CR.8
REGULATIONS.
1.
CONTRACTOR HAS SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA SAFETY
NOTIFICATION OF ENGINEER: THE CONTRACTOR SHALL NOTIFY THE STRUCTURAL
ENGINEER TWENTY-FOUR HOURS IN ADVANCE OF:
PLACING CONCRETE IN ANY FOOTING.
CR.9
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS, NEW AND
EXISTING, BY MEASUREMENTS AND SURVEYS AT THE JOB SITE, PRIOR TO SUBMITTAL
OF SHOP DRAWINGS. THE CONTRACTOR SHALL TAKE ANY AND ALL OTHER
MEASUREMENTS NECESSARY TO VERIFY CONFORMANCE WITH THE DRAWINGS AND TO
PERFORM THE WORK PROPERLY.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION, AND
REMOVAL OF ALL TEMPORARY BRACING AND CONSTRUCTION SUPPORTS, FOR NEW AND
EXISTING STRUCTURES, AS NECESSARY TO COMPLETE THE PROJECT. NO PORTION OF
CR.7
THE PROJECT, WHILE UNDER CONSTRUCTION, IS INTENDED TO BE STABLE IN THE
ABSENCE OF THE CONTRACTOR'S TEMPORARY BRACES AND SUPPORTS. CONTRACTOR
SHALL RETAIN A STRUCTURAL ENGINEER LICENSED IN THE STATE OF TENNESSEE TO
DESIGN ALL TEMPORARY BRACING AND CONSTRUCTION SUPPORTS.
ALL FIELDWORK SHALL BE COORDINATED AND CONTINUOUSLY SUPERVISED BY THECR.5
CONTRACTOR.
MATERIALS AND EQUIPMENT SHALL BE STORED AND TRANSPORTED IN A MANNER SO
AS NOT TO EXCEED THE ALLOWABLE FLOOR LOADINGS INDICATED IN THE DRAWINGS.
THE CONTRACTOR SHALL MAKE NO DEVIATION FROM THE DESIGN DRAWINGS WITHOUTCR.3
WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER.
CR.4
THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS FOR SUCCESSFUL
COMPLETION OF THIS PROJECT.
THE CONTRACTOR SHALL NOTIFY STRUCTURAL ENGINEER OF ANY DISCREPANCIES
BETWEEN THE STRUCTURAL DOCUMENTS AND ANY OTHER DOCUMENTS OR EXISTING
CONDITIONS FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
STRUCTURES ARE NOT SELF-SUPPORTING UNTIL THE COMPLETE LATERAL LOAD
SYSTEM HAS BEEN INSTALLED, AND THEY SHALL BE CONSIDERED TO REQUIRE
ERECTION BRACING, UNLESS SPECIFICALLY NOTED OTHERWISE. THE STRUCTURAL
DRAWINGS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE THE
METHOD OF CONSTRUCTION, U.N.O. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND OPERATION OF CONSTRUCTION
AND SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO.
DC.1
Cd = 3.25
R = 3.25
C
ASCE 7-05
90 MPH (3 SECOND GUST)
1.0
A.
BASIC WIND SPEED:
UNIFORM DEAD LOADS
EXPOSURE CATEGORY:
IMPORTANCE FACTOR:
1.
DC.2
1.
2.
4.
DC.6
DC.5
2.
GRAVITY LOADS
SEISMIC DESIGN DATA
WIND DESIGN DATA
UNIFORM LIVE LOADS (REDUCED AS ALLOWED BY THE BUILDING CODE)
PLATFORM:
II
D
SITE CLASS:
LATERAL LOAD SYSTEM
DESIGN BASE SHEAR: V = CsW = 1.05 KIPS
2.
6.
3.
5.
9.
11.
10.
MAPPED SPECTRAL RESPONSE ACCELERATION, S = 0.330g
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
OCCUPANCY CATEGORY
SEISMIC DESIGN CATEGORY:
BASIC SEISMIC-FORCE-RESISTING SYSTEM:
ORDINARY STEEL CONCENTRICALLY BRACED FRAMES (OSCBF)
RESPONSE MODIFICATION FACTOR:
DEFLECTION AMPLIFICATION FACTOR:
MAPPED SPECTRAL RESPONSE ACCELERATION, S = 1.194g
D
1.0IMPORTANCE FACTOR:1.
DC.4
ASCE 7-05
IIOCCUPANCY CATEGORY
4.
SPECTRAL RESPONSE COEFFICIENT, S = 0.383g SPECTRAL RESPONSE COEFFICIENT, S = 0.814g
7.
SEISMIC RESPONSE COEFFICIENT, Cs: 0.2518.
20 PSFA. PLATFORM:
ALL CONSTRUCTION SHALL BE PERFORMED IN CONFORMANCE WITH THE BUILDING
AND DESIGN CODES REFERENCED WITHIN THESE DOCUMENTS. THE PROJECT
DOCUMENTS REFER TO THE FOLLOWING CODES AND REFERENCED STANDARDS, U.N.O.
BUILDING CODE:
INTERNATIONAL BUILDING CODE (IBC 2009)
REFERENCING
MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, (ASCE7-05)
STRUCTURAL CONCRETE:
"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
THE AMERICAN CONCRETE INSTITUTE (ACI 318-2005)
STRUCTURAL STEEL:
"LRFD SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, THIRTEENTH EDITION"
THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC-360-05)
"SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS" THE AMERICAN
INSTITUTE OF STEEL CONSTRUCTION (ANSI/AISC 341-05)
HANDRAILS LOADS:DC.3
1. 50 PLF APPLIED IN ANY DIRECTION AT TOP
2. SINGLE 200 LB CONCENTRATED LOAD APPLIED IN ANY DIRECTION
AT ANY POINT ALONG THE TOP
1.
2.
4.
DIAPHRAGM.
DIAGONAL BRACING CONNECTED TO STEEL BEAMS TO CONSTITUTE A COMPLETE
BEAMS SECURED TO SUPPORTING BEAMS.
COMPLETE BRACED FRAMES.
FOUNDATION ANCHORS TIGHTENED AND FULLY EMBEDDED.
COMPLETE FOUNDATIONS, INCLUDING BACKFILL, UNDER ALL COLUMNS, WITH
3.
STRUCTURAL STABILITY IS ACHIEVED IN THE FINISHED CONSTRUCTION USING THE
FOLLOWING STRUCTURAL COMPONENTS AND CONNECTIONS, AS INDICATED IN THE
STRUCTURAL DOCUMENTS, INSTALLED IN THEIR ENTIRETY:
DS
D1
S
3.
25 PSF OR 1,400 LBS ON 3.5'x4' AREA
SE.1
SE.2
ASTM D-698.
MOISTURE.
SUBGRADE UNDER FOUNDATIONS: COMPACT TO MINIMUM DENSITY OF 98 PERCENT
COMPACTION OF 98 PERCENT STANDARD PROCTOR AT OR SLIGHTLY ABOVE OPTIMUM
FILL PLACED IN LIFTS NOT EXCEEDING 6" IN LOOSE THICKNESS TO OBTAIN A
SITE SHALL BE CLEARED OF ALL TOP SOIL, FILL, RUBBLE, ETC., AND THE REQUIRED
APPROVED SOIL MATERIALS.
1500 PSF *
1500 PSF *
SF.1
SOILS TEST RESULTS SHALL BE FORWARDED TO THE CONTRACTOR.
BY THE SOILS ENGINEER TO CONFORM TO THE ABOVE LISTED DESIGN VALUES. ALL
BY A QUALIFIED, EXPERIENCED SOILS ENGINEER. THE RESULTS SHALL BE CERTIFIED
EXPERIENCED ENGINEERING TESTING AGENCY, AND THE RESULTS SHALL BE REVIEWED
UNDISTURBED RESIDUAL SOILS. ALL SOILS TESTING SHALL BE PERFORMED BY AN
ON UNDISTURBED COMPACTED FILL, MINIMUM DENSITY 98% ASTM D-698 OR
ALL FOOTINGS SHALL BE TESTED AFTER EXCAVATION BY A QUALIFIED SOILS ENGINEER
DETERMINE IF THE ASSUMED BEARING VALUES STATED ABOVE ARE CORRECT.
AT CONTINUOUS FOOTINGS:
AT SPREAD FOOTINGS:
SF.2
SF.3
FOOTING AND GRADE BEAMS SHALL BE CAST IN NEATLY TRENCHED EXCAVATIONS (1"
WIDER EACH SIDE THAN DIMENSIONS SHOWN). IF FOOTINGS CANNOT BE CAST IN
NEAT TRENCHES, FORM FOOTINGS TO DIMENSIONS SHOWN. BOTTOM OF FOOTINGS
BEARING ON SOIL SHALL EXTEND, WITH A MINIMUM EMBEDMENT OF 6", INTO FIRM
FOUNDATION CONCRETE SHALL BE PLACED THE SAME DAY THE EXCAVATION IS
EXPOSED, SPECIAL CARE SHOULD BE TAKEN TO PROTECT THE EXPOSED SOILS
FROM BEING DISTURBED, SATURATED, OR DRIED OUT PRIOR TO THE PLACEMENT
OF SELECT FILL OR CONCRETE. WATER SHALL NOT BE ALLOWED TO STAND IN
TRENCHES BEFORE OR AFTER CONCRETE IS PLACED, BUT SHALL BE PUMPED OUT.
BEFORE FOOTINGS ARE CAST, THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL
IF BOTTOMS OF TRENCHES BECOME SOFTENED DUE TO RAIN OR OTHER WATER
EXCAVATE THE SOFTENED MATERIAL AND REPLACE WITH CONCRETE.
FOUNDATIONS ARE DESIGNED FOR AN ASSUMED MAXIMUM SOIL BEARING PRESSURE
OF:
ALL CONCRETE WORKMANSHIP AND MATERIALS SHALL CONFORM TO ACI 318 ANDCO.1
ALL LOCAL LAWS AND ORDINANCES.
ALL CONCRETE SHALL BE VIBRATED.
NO REPAIR OR RUBBING OF CONCRETE SURFACES SHALL BE MADE PRIOR TO
INSPECTION BY AND WITH APPROVAL OF THE ARCHITECT, OWNER, OR THEIR
AUTHORIZED REPRESENTATIVES.
CO.4
CO.5
CONCRETE COMPRESSIVE STRENGTH IN 28 DAYS:
FOOTINGS
EXTERIOR CONCRETE
4000 PSI (5% AIR-ENTRAINED)
4000 PSI (5% AIR-ENTRAINED)
CONCRETE SHALL BE NORMAL WEIGHT (145 PCF) UNLESS NOTED OTHERWISE.
CO.2
CO.3
APPROVAL OF THE STRUCTURAL ENGINEER.
CONTRACTOR SHALL NOT CUT, DRILL, OR MODIFY STRUCTURAL MEMBERS WITHOUT
OTHERWISE ON THE STRUCTURAL DRAWINGS.
(MILLED) ONE-PIECE SECTIONS WITHOUT SPLICES, UNLESS SPECIFICALLY NOTED
STRUCTURAL SHAPES AND PLATES SHALL BE FABRICATED FROM NEWLY ROLLEDSS.3
SS.4
SS.1
SS.2 STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS AND MATERIAL
PROPERTIES, U.N.O.:
ROLLED SHAPES, U.N.O.:
PLATES:
ANGLES:
PIPE:
HOLLOW STRUCTURAL SECTIONS:
ANCHOR BOLTS:
HEADED STUDS:
ASTM A992
ASTM A36, MINIMUM
ASTM A572 (GRADE 50)
ASTM A501 OR A53, TYPES E OR S
ASTM A500, GRADE B
ASTM F1554, GRADE 36
ASTM A108
WHERE NO CAMBER IS INDICATED, BEAMS SHALL BE FABRICATED SO THAT AFTER
ERECTION, ANY NATURAL CAMBER IS UPWARD.
FOR STEEL MEMBERS AND EMBEDMENTS EXPOSED TO WEATHER, PROVIDE HOT-DIPPED
GALVANIZED STEEL. GALVANIZING OF STEEL MEMBERS SHALL CONFORM TO ASTM A123.
ALL COPES, HOLES, OPENINGS AND MODIFICATIONS REQUIRED IN STRUCTURAL STEEL
MEMBERS FOR ERECTION OR THE WORK OF OTHER TRADES SHALL BE SHOWN ON THE
SHOP DRAWINGS FOR APPROVAL BY THE STRUCTURAL ENGINEER.
SS.6
SS.7
SS.8
PROVIDE HEADED STUDS AT 12" O.C. MAX SPACING AT ALL STEEL BEAMS
SUPPORTING COMPOSITE DECK, U.N.O.
SS.9
GUSSET PLATES SHALL BE A MINIMUM OF 3/8 INCH THICK UNLESS NOTED
OTHERWISE.
BASE PLATE CONNECTIONS ARE NOT DESIGNED TO PROVIDE STABILITY OF
COLUMNS DURING ERECTION. COLUMNS SHALL BE TEMPORARILY BRACED BY THE
ERECTOR PRIOR TO RELEASE OF THE COLUMN FROM THE HOISTING EQUIPMENT.
COLUMN ANCHOR BOLT HOLES SHALL BE OVERSIZED IN ACCORDANCE WITH AISC
MANUAL OF STEEL CONSTRUCTION, VOLUME 11, CONNECTIONS.
SS.5 FABRICATOR SHALL BE APPROVED BY THE STRUCTURAL ENGINEER. FABRICATOR
SHALL HAVE BEEN IN BUSINESS FOR A PERIOD OF THREE CONSECUTIVE YEARS AND
SHALL PROVIDE PROOF THAT THEY HAVE FABRICATED A MINIMUM OF FIVE JOBS OF
SIZE AND COMPLEXITY EQUAL TO THAT INDICATED ON THESE DRAWINGS.
SS.10
ALL MATERIAL SHALL BE FURNISHED, FABRICATED, DELIVERED, UNLOADED AND
ERECTED IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF AISC
SPECIFICATIONS.
SHOWN ON THE PLAN.
BAR GRATING SHALL BE OPEN-GRID DESIGN THAT ALLOWS LIQUIDS TO DRAIN,
PREVENTS DEBRIS BUILD-UP, PERMITS AIR CIRCULATION AND LETS LIGHT THROUGH.
BAR GRATING SHALL BE CAPABLE OF BEING CUT TO SIZE WITH A BAND SAW OR
BEARING BARS SHALL RUN IN THE SAME DIRECTION AS PEDESTRIAN TRAFFIC, AS
GRATING SHALL BE GCM-1-100 GALVANIZED BY MCNICHOLS. ENDS SHALL BE BANDED.
BAR GRATING FASTENERS: SHALL BE BY FORMED BAR GRATING CLIP. THE CLIP SHALL
BY BOLT. NOSING HARDWARE SHALL ACCOMMODATE A 1" BAR GRATING.
PLANS.
SECURE THE BEARING BAR TO SUPPORT STRUCTURE AND SHALL BE LOCKED IN PLACE
PG.7
PG.6
CUTTING TORCH.
BAR GRATING SHALL BE GALVANIZED.
PG.4
PG.5
PG.3
PG.2
PG.1
PIECES SHALL HAVE A MINIMUM LENGTH OF 7'-6", UNLESS SHOWN OTHERWISE ON THE
SU.1
THE CONTRACTOR IS TO REVIEW EACH SUBMITTAL PRIOR TO FORWARDING TO
STRUCTURAL ENGINEER. THE CONTRACTOR IS TO STAMP EACH SUBMITTAL
VERIFYING THAT THE FOLLOWING IS ADDRESSED.
THE SHOP DRAWING IS REQUESTED.
THE SHOP DRAWING IS BASED ON THE LATEST DESIGN.
THE ARCHITECT'S AND STRUCTURAL ENGINEER'S COMMENTS FROM ANY
PREVIOUS SUBMITTALS ARE ADDRESSED.
THE WORK IS COORDINATED AMONG ALL TRADES.
REVISIONS FROM PREVIOUS SUBMITTALS ARE CLEARLY MARKED BY CIRCLING OR
CLOUDS.
SUPPORTING CALCULATIONS SIGNED AND SEALED BY A LICENSED STRUCTURAL
ENGINEER IN THE STATE OF TENNESSEE ARE PROVIDED, WHERE REQUIRED
IN SU.4.
SUBMITTAL IS COMPLETE.
THE STRUCTURAL ENGINEER SHALL RETURN, WITHOUT COMMENT, SUBMITTALS WHICH
THE CONTRACTOR HAS NOT STAMPED OR WHICH DO NOT MEET THE ABOVE
REQUIREMENTS. THE STRUCTURAL ENGINEER'S REVIEW OF SUBMITTALS SHALL BE
FOR GENERAL CONFORMANCE WITH THE DESIGN INTENT. NO WORK SHALL BE STARTED
WITHOUT SUCH REVIEW.
SU.2
1.
2.
3.
4.
6.
7.
FOR COMPONENTS THAT REQUIRE ENGINEERING BY THE SUPPLIER, PROVIDE A NOTE
ON EACH SHOP DRAWING, WRITTEN AND SIGNED BY THE SUPPLIER'S ENGINEER
INDICATING THAT THE SHOP DRAWING IS IN CONFORMANCE WITH THE CALCULATIONS
OF THE SUPPLIER'S ENGINEER.
THE FOLLOWING ITEMS REQUIRE SUBMITTALS FOR STRUCTURAL REVIEW AS OUTLINED
IN THE SPECIFICATIONS:
03200 03300 05120 05120
SU.4
SU.3
CONCRETE REINFORCING LAYOUT
CONCRETE MIX DESIGN
STRUCTURAL STEEL
STRUCTURAL STEEL CONNECTIONS
C
C
S
S S
SHOP DRAWING REQUIRED
SUPPORTING CALCULATIONS REQUIRED, SIGNED AND SEALED BY A LICENSED
STRUCTURAL ENGINEER IN THE STATE OF TENNESSEE.
SU.5
S = C =
REPRODUCTION OF THE STRUCTURAL DRAWINGS FOR USE IN SHOP DRAWINGS OR
ANY OTHER PURPOSE WILL NOT BE PERMITTED WITHOUT THE WRITTEN PERMISSION
OF ASKEW HARGRAVES HARCOURT & ASSOCIATES, INC. SUBMITTALS
CONTAINING REPRODUCTIONS, IN WHOLE OR IN PART, OF THE STRUCTURAL
DRAWINGS WILL BE IMMEDIATELY REJECTED.
REVIEW OF SUBMITTAL OR SHOP DRAWINGS BY THE STRUCTURAL ENGINEER DOES
NOT RELIEVE THE CONTRACTOR OF THE SOLE RESPONSIBILITY TO REVIEW AND
CHECK ALL SUBMITTALS AND SHOP DRAWINGS BEFORE SUBMITTING TO THE
STRUCTURAL ENGINEER. CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS
AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS
THEY PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE
CONTRACT DOCUMENTS.
REGISTERED PROFESSIONAL ENGINEER'S SEAL IS REQUIRED ON ALL CALCULATIONS
SUBMITTED.
SU.6
SU.7
THIRTY DAYS PRIOR TO SUBMITTING SHOP DRAWINGS, THE CONTRACTOR SHALL
SUBMIT FOR STRUCTURAL ENGINEER'S REVIEW A SCHEDULE WHICH DETAILS THE
ESTIMATED QUANTITY OF SHOP DRAWINGS AND THE DATE THE SHOP DRAWINGS WILL
BE RECEIVED BY THE STRUCTURAL ENGINEER. THE STRUCTURAL ENGINEER SHALL
HAVE THE OPPORTUNITY TO REVIEW THE PROPOSED SCHEDULE AND SUBMIT
COMMENTS TO THE CONTRACTOR. THE FINAL SHOP DRAWING SCHEDULE SHALL BE
DEVELOPED AND SUBMITTED TO THE STRUCTURAL ENGINEER. IN ACCORDANCE WITH
THE SHOP DRAWING SCHEDULE, THE STRUCTURAL ENGINEER WILL RETURN THE SHOP
DRAWING ITEMS WITHIN TEN WORKING DAYS AFTER HAVING RECEIVED THE
REPRODUCIBLE SHOP DRAWING.
5.
ASTM A615, GRADE 60
CONCRETE REINFORCEMENT:
MINIMUM LAP FOR ANY BAR:
REINFORCING STEEL DESIGNATED CONTINUOUS SHALL BE LAPPED AS FOLLOWS:
REINFORCING BAR STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS:
RS.5
1.
2.
3.
RS.2
CLASS "B" TENSION LAP (PER ACI 318-05)
18 INCHES
WHERE BARS OF DIFFERENT SIZES LAP, PROVIDE LAP SPLICE LENGTH FOR LARGER
BAR.
WHERE DOWELS ARE INDICATED BUT NOT SIZED, PROVIDE DOWELS THAT MATCH SIZE
AND LOCATION OF MAIN REINFORCEMENT AND LAP SPLICE WITH THE MAIN
REINFORCEMENT.
RS.13
SURFACES NOT FORMED:
FORMED SURFACES IN CONTACT WITH
SOIL OR WATER, OR EXPOSED TO WEATHER:
SPREAD FOOTINGS:
STRIP FOOTINGS:
RS.14
RS.15
3"
2"
BOTTOM 0.18%
BOTTOM 0.20%
REINFORCING SHALL NOT BE HEATED OR WELDED.
RS.1
RS.16
RS.17
DETAILING OF CONCRETE REINFORCEMENT AND ACCESSORIES SHALL BE IN
ACCORDANCE WITH ACI DETAILING MANUAL, SP-66, THE CRSI MANUAL OF STANDARD
PRACTICE AND ACI 318.
REINFORCEMENT SHALL HAVE THE FOLLOWING CONCRETE PROTECTION (CLEAR
COVER). U.N.O.:
NO CONSTRUCTION SHALL BE MADE WITHOUT REINFORCEMENT. THE FOLLOWING
PERCENTAGE OF THE GROSS CROSS SECTIONAL AREA SHALL BE PROVIDED AS A
MINIMUM REINFORCEMENT WHERE NO REINFORCEMENT IS INDICATED:
REINFORCING PLACEMENT SHALL BE APPROVED BY THE ENGINEER OR THEIR
AUTHORIZED REPRESENTATIVE BEFORE CONCRETE IS PLACED.
APPLY BROOM FINISH TO CONCCRETE SURFACES.CO.6
MAXIMUM WATER TO CONCRETE RATIO OF 0.45.
SEAL
REVISIONS
PROJECT NO.
DATE:
DRAWN:
SHEET TITLE:
SHEET NO:
CHECKED:
ASKEW HARGRAVES HARCOURT
& ASSOCIATES, INC.
MEMPHIS, TN.
901.372.0404 www.a2h.com
HERNANDO, MS.
662.298.2188
A H
A
P P
L I N
G R
O A
D M
E M
P H
IS
T
N
S0.1
GENERAL NOTES &
QUALITY
ASSURANCE
S H
E R
R O
D C
O N
S T
R U
C T
IO
N
C O
P
E N
T H
O U
S E
A C
C E
S S
P L A
T F
O R
M
RDMTLK
02/05/2013
12340
SCALE: 12" = 1'-0"
D1
GENERAL NOTES
A
D
C1
S1.1
C5
S1.1
B
C
2 3 4 5 6 7 8
3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9"
30' - 0"
1'
5'
1'
7'
W12X40
W12X40
C
X .5
W
X
C
X .5
C
X .5
C
X .5
C
X .5
C
X .5
C
X .5
L X
X
/4 L
X
X
/4
L X
X
/4
L X
X
/4
L X
X
/4
L X
X
/4
L X
X
/4
L X
X
/4
B3
S1.1
C
X .5
SINGLE SWING GATE
L
X
X
/4
EDGE OF CONC.
PENTHOUSE FLOOR REMOVABLE GATE HINGE
ON HANDRAIL
STRIKE PLATE ON HANDRAIL
GRADE LEVEL
0' - 0"
BEAM BEARING
17' - 7"
1 9
C1
S1.1
C5
S1.1
2 3 4 5 6 7 8
3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9"
30' - 0"
CHANNEL
SEE PLAN
EXIST. ROOF
HORIZ. BRACING
SEE PLAN
1' - 0" 6' - 3 1/4"
7' - 3 1/4"
S1.1
C3 S1.1
C4
EXISTING FOUNDATION
VERIFY DEPTH,
EXPECTED 1'-6"
BELOW GRADE
EXIST. ASPH.
6' - 0"
0.5% SLOPE
0'
COVER EXIST.
PIPE FULL LENGTH
W/ COMPRESSIVE
FOAM, TOP & SIDES
3'
1'
BEAM BEARING
17' - 7"
A DB C
1' - 0" 5' - 0" 1' - 0"
7' - 0"
BAR GRATING
SEE GEN. NOTES
STEEL BEAM
SEE PLAN
CHANNEL
SEE PLAN
HORIZ. BRACING
SEE PLAN
STEEL BEAM
SEE PLAN
0'
3/8" STIFF. PL.
@ CONNECTIONSS1.1
D2HANDRAIL
POST, TYP.
GRADE LEVEL
0' - 0"
BEAM BEARING
17' - 7"
A DB C
1' - 0" 5' - 0" 1' - 0"
7' - 0"
W
X
W
X
BAR GRATING
SEE GEN. NOTES
HORIZ. BRACING
SEE PLAN
BEARING
PL.1/2"x27"x0'-6"
STEEL BEAM
W/ 3/8" STIFF.
PL. @ CONN.
SEE PLAN
BASE PL.1/2"x12"x1'-0"
W/ (4)-1/2" DIA.
ANCHOR BOLTS
0' - 4" 0' - 4"
WORK POINT,
TYP.
L3X 3X1/4
L3X3X1/4
L3X3X1/4
L3X3X1/4
L3X 3X1/4
L3X3X1/4
L3X3X1/4
3/8" STIFF. PL.
TO MATCH WEB
LOCATIONS
STEEL BEAM
SEE PLAN
BASE PL.1/2"x18"x1'-0"
W/ (4)-1/2" DIA.
ANCHOR BOLTS
A
D
C5
S1.1
B
C
2 3 4 5 6 7 8
1'
5'
1'
7'
3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 1' - 0"
30' - 0"
1' - 0" 6' - 3 1/4"
7' - 3 1/4"
6'
3'
5'
3'
B3
S1.1
EXIST. CATCH BASIN
W/ MAN HOLE
EXIST. CURB
S L
O P
E D
O W
N
BEAM BEARING
17' - 7"
1 2
3' - 9"
(2)-3/8" DIA. HAS ROD
W/ HILTI HIT-RE 500
EPOXY ADHESIVE
ANCHOR SYSTEM
(3 3/8" EMBED)
EXISTING ROOF
HORIZ. BRACING
SEE PLAN
CHANNEL
SEE PLAN
STEEL BEAM
W/ 3/8" STIFF.
PL. @ CONN.
SEE PLAN
BAR GRATING
SEE GEN. NOTESSLOPE BAR GRATING
TO MATCH SLAB ELEV.
EXIST.
POUR STOP
BUILDING EDGE
(BEYOND)
EXIST.
ROLL-UP
DOOR
L1x1x1/4"
3/16
TYP.
2@8
3/8" STIFF. PL.
EACH SIDE
BEAM BEARING
17' - 7"
3' - 9"
STEEL BEAM
W/ 3/8" STIFF.
PL. @ CONN.
SEE PLAN
BAR GRATING
SEE GEN. NOTES
HORIZ. BRACING
SEE PLAN
CHANNEL
SEE PLAN
BEARING PL.
SEE C5/S1.1
1' - 0"
BUILDING EDGE
W/ GUTTER
3/8" STIFF. PL.
@ BEARING
WORK AREA
NORTH
BEAM BEARING
17' - 7"
PL.10"x3"x0'-0 3/8"
W/ (2)-1/2" BOLTS
(2)-L2x2x1/4x1'-0"
W/ (2)-1/2" BOLTS
HANDRAIL
POST
1/4"
1/4"
TYP.
3/16
TYP.
3/16
TYP.
STEEL BEAM
SEE PLAN
SEAL
REVISIONS
PROJECT NO.
DATE:
DRAWN:
SHEET TITLE:
SHEET NO:
CHECKED:
ASKEW HARGRAVES HARCOURT
& ASSOCIATES, INC.
MEMPHIS, TN.
901.372.0404 www.a2h.com
HERNANDO, MS.
662.298.2188
A H
A
P P
L I N
G R
O A
D M
E M
P H
IS
T
N
S1.1
PLANS & DETAILS
S H
E R
R O
D C
O N
S T
R U
C T
IO
N
C O
P
E N
T H
O U
S E
A C
C E
S S
P L A
T F
O R
M
RDMTLK
02/05/2013
12340
SCALE: 1/4" = 1'-0"
B1
FRAMING PLAN
SCALE: 1/4" = 1'-0"
B3
LONGITUDINAL SECTION
SCALE: 3/4" = 1'-0"
C1
CROSS SECTION
SCALE: 1/2" = 1'-0"
C5
COLUMN FRAME ELEVATION
SCALE: 1/4" = 1'-0"
A1
FOUNDATION PLAN
SCALE: 3/4" = 1'-0"
C3
BEAM BEARING ON PENTHOUSE SLAB SECTION
SCALE: 3/4" = 1'-0"
C4
BEAM BEARING SECTION
SCALE: 1/64" = 1'-0"
D1
KEY PLAN
FACE OF BUILDING
SCALE: 3" = 1'-0"
D2
CONNECTION DETAIL
NOTES:
1. ALL CONNECTION SHALL BE BOLTED, U.N.O.
2. A SIGN WITH LOADING INFORMATION SHALL BE PROVIDED LIMITING
LIVE LOAD TO 25PSF OR 1,400LB ON A 3.5'x4' AREA.
3. HANDRAIL TO BE GALVANIZED.
4. BOLTS TO BE 1/2" DIA., U.N.O.
| TEMP016 |
| TEMP018 |
| TEMP017 |
| TEMP019 |
| TEMP020 |
| TEMP021 |
| TEMP022 |
| TEMP023 |
| TEMP024 |
| TEMP025 |
| TEMP026 |
| TEMP027 |
| TEMP028 |
| TEMP029 |
| TEMP030 |
| TEMP001 |
| TEMP002 |
| TEMP003 |
| TEMP004 |
| TEMP005 |
| TEMP006 |
| TEMP007 |
| TEMP008 |
| TEMP009 |
| TEMP010 |
| TEMP011 |
| TEMP012 |
| TEMP013 |
| TEMP014 |
| TEMP015 |
File details come from the government source that posted it. Updated .