C-hobs FA8213-18-r-3015

Awarded Award Notice Posted

Solicitation number
FA8213-17-R-DSU33
Agency
AFLCMC Hill AFB Lifecycle Management Center, Department of Defense
Awarded
to L3 Technologies, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
FA8213-19-D-0006 Federal IDV award
NAICS code
332993 Ammunition (except Small Arms) Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

About this opportunity

This Award Notice is for the C-HOBS FA8213-18-R-3015 contract awarded by the Department of the Air Force Materiel Command Lifecycle Management Center. The contract provides for the design, development, testing, and production of up to 60,000 Cockpit-Selectable Height-Of-Burst Sensor systems over an eight-year period from 2018 to 2026, with an estimated maximum value of $215.6 million. The sensor systems and associated equipment and services will replace aging systems and maintain capability for legacy and next-generation weapons.

Notice text

49 versions

Update #49 · Latest ·

Awarded Vendors: L3 TECHNOLOGIES, INC SYSTEMS COMPANY. Contract Award Dollar Amount: $131,780,189.00. Contract Award Date: 2019-03-21.

Update #48 ·

The proposal Response date has been extended to 27 February 2018 @ 1500 MT.
Updated Comment Resultion Matrix (CRM) C-HOBS has been added to answer submitted questions.
Some attachment updates that are referenced in the CRM will be completed in Amendment 3.
For any questions not answered in this Amendment, please resubmit them to kyle.andersen@us.af.mil.

Update #47 ·

Added: Jan 25, 2018 5:54 pm The proposal Response date has been extended to 27 February 2018 @ 1500 MT.

Updated Comment Resultion Matrix (CRM) C-HOBS has been added to answer submitted questions.

Some attachment updates that are referenced in the CRM will be completed in Amendment 3.

For any questions not answered in this Amendment, please resubmit them to kyle.andersen@us.af.mil

Update #46 ·

The proposal Response date has been extended to 20 February 2018 @ 1500 MT.
Attachment Comment Resultion Matrix (CRM) C-HOBS has been added to answer submitted questions.
Also the Pricing Matrix, Incremental Spares, Section L, Section M, SOO, Exhibit N, Exhibit A and TEP attachments have been updated to incorporate information from questions.
For any questions not answered in this Amendment, please resubmit them..

Update #45 ·

Added: Jan 18, 2018 5:18 pm The proposal Response date has been extended to 20 February 2018 @ 1500 MT.

Attachment Comment Resultion Matrix (CRM) C-HOBS has been added to answer submitted questions.

Also the Pricing Matrix, Incremental Spares, Section L, Section M, SOO, Exhibit N, Exhibit A and TEP attachments have been updated to incorporate information from questions.

For any questions not answered in this Amendment, please resubmit them. 

Update #44 ·

Attached is the C-HOBS FA8213-18-R-3015 Solicitation. Responses are due to the issuing office no later than 12 Feb 2018 by 5:00 PM MST. Attachment 5 "ICD" and Attachment 6 "SRD" will only be released to those that provide a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC's identified on this FBO posting. The primary POC for this solicitation is Mr. Kyle Andersen. Contact information is at the bottom of this posting.

.

Update #43 ·

Added: Dec 19, 2017 7:02 pm

Attached is the C-HOBS FA8213-18-R-3015 Solicitation.  Responses are due to the issuing office no later than 12 Feb 2018 by 5:00 PM MST.  Attachment 5 "ICD" and Attachment 6 "SRD" will only be released to those that provide a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC's identified on this FBO posting. The primary POC for this solicitation is Mr. Kyle Andersen.  Contact information is at the bottom of this posting.

Update #42 ·

Additional Q & A's are available upon request. Interested parties must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC(s) identified on this FBO posting in order to be eligible to receive the data..

Update #41 ·

Added: Dec 18, 2017 1:05 pm Additional Q&A's are available upon request.  Interested parties must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC(s) identified on this FBO posting in order to be eligible to receive the data.

Update #40 ·


Available for release is select data from Precision Selectable Height-of-Burst Sensor (P-HOBS) Contract No. FA8656-14-C-0171. Interested parties must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC(s) identified on this FBO posting in order to be eligible to receive the data.


Section 2.2.6 Subfactor 3: Management Approach para (a) Rights in Technical Data, Computer Software, and Computer Software Documentation of Section M has been revised to include the following language "The Government's intention is for the contractor to deliver complete level 3 drawings sufficient to manufacture and sustain C-HOBS product through full and open competition in the future. Offerors are not precluded from competing for award based on their refusal to provide at least Government Purpose License Rights to all data (other than the data listed as Unlimited in Table 1 of Attachment 2) and software delivered under the contract. However, an award decision will be based in part on how well the proposal meets the Government's software and data right's needs. In accordance with Table 5 "TECHNICAL RATINGS - TRADE OFF - Applicable to Data Only," an Offeror will receive a Marginal Rating under Subfactor 3(a) if it's "proposal includes Unlimited Rights to just the data items as identified in Attachment 2 and proposes in accordance with Section L, M and Attachment 2..."


The statement, "Offerors are not precluded from competing for award based on their refusal to provide at least Government Purpose License Rights to all data (other than the data listed as Unlimited in Table 1 of Attachment 2) and software delivered under the contract" simply asserts that any interested party can still submit a proposal that will be evaluated. However, Offerors' proposals that do not meet the Government's intent for obtaining level 3 drawings sufficient to manufacture and sustain C-HOBS product through full and open competition in the future will negatively affect its technical rating for Subfactor 3.

.

Update #39 ·

Added: Dec 15, 2017 5:19 pm   

Available for release is select data from Precision Selectable Height-of-Burst Sensor (P-HOBS) Contract No. FA8656-14-C-0171.  Interested parties must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC(s) identified on this FBO posting in order to be eligible to receive the data.


Section 2.2.6 Subfactor 3: Management Approach para (a) Rights in Technical Data, Computer Software, and Computer Software Documentation of Section M has been revised to include the following language "The Government's intention is for the contractor to deliver complete level 3 drawings sufficient to manufacture and sustain C-HOBS product through full and open competition in the future.  Offerors are not precluded from competing for award based on their refusal to provide at least Government Purpose License Rights to all data (other than the data listed as Unlimited in Table 1 of Attachment 2) and software delivered under the contract.  However, an award decision will be based in part on how well the proposal meets the Government's software and data right's needs.  In accordance with Table 5 "TECHNICAL RATINGS - TRADE OFF - Applicable to Data Only," an Offeror will receive a Marginal Rating under Subfactor 3(a) if  it's "proposal includes Unlimited Rights to just the data items as identified in Attachment 2 and proposes in accordance with Section L, M and Attachment 2..."


The statement, "Offerors are not precluded from competing for award based on their refusal to provide at least Government Purpose License Rights to all data (other than the data listed as Unlimited in Table 1 of Attachment 2) and software delivered under the contract" simply asserts that any interested party can still submit a proposal that will be evaluated.  However, Offerors' proposals that do not meet the Government's intent for obtaining level 3 drawings sufficient to manufacture and sustain C-HOBS product through full and open competition in the future will negatively affect its technical rating for Subfactor 3. 

Update #38 ·

The Official Synopsis that was posted on 24 July 2017 has been revised. The revised synopsis is saved as "Edited Synopsis for Cockpit-Selectable Height-of-Burst (C-HOBS) Sensor" which is included in this posting. Revisions were made to units of issue, destination information, solicitation number, anticipated CLIN structure, anticipated solicitation release date and anticipated award date..

Update #37 ·

Added: Dec 05, 2017 5:10 pm The Official Synopsis that was posted on 24 July 2017 has been revised.  The revised synopsis is saved as "Edited Synopsis for Cockpit-Selectable Height-of-Burst (C-HOBS) Sensor" which is included in this posting. Revisions were made to units of issue, destination information, solicitation number, anticipated CLIN structure, anticipated solicitation release date and anticipated award date.

Update #36 ·

Additional Q & A's are available for those who have an approved DD Form 2345..

Update #35 ·

Added: Nov 08, 2017 4:03 pm Additional Q&A's are available for those who have an approved DD Form 2345.

Update #34 ·


Final SRD is available to those who have an approved DD Form 2345. Attached to this notice is the solicitation DD254. As previously mentioned in an earlier posting to this FBO announcement, the Government intends to make available the annex to the TDP which is classified at the SECRET LEVEL. If interested in receiving the annex please provide company name, cage code and justification for your "need to know."

.

Update #33 ·

Added: Sep 20, 2017 5:02 pm  

Final SRD is available to those who have an approved DD Form 2345.  Attached to this notice is the solicitation DD254.  As previously mentioned in an earlier posting to this FBO announcement, the Government intends to make available the annex to the TDP which is classified at the SECRET LEVEL.  If interested in receiving the annex please provide company name, cage code and justification for your "need to know."

Update #32 ·



Additional Q & A's, unincorporated DSU-33 Notices of Revisions (NORs), and updated drawings as a result of incorporated DSU-33 NORs are available for those who have an approved DD Form 2345.

.

Update #31 ·

Added: Sep 19, 2017 12:55 pm  

 


Additional Q&A's, unincorporated DSU-33 Notices of Revisions (NORs), and updated drawings as a result of incorporated DSU-33 NORs are available for those who have an approved DD Form 2345.

Update #30 ·



Anticipated solicitation release date is now 28 September 2017. This date is an estimate. The Government reserves the right to release the solicitation prior to or later than 28 September 2017.

.

Update #29 ·

Added: Aug 16, 2017 3:12 pm

 


 


Anticipated solicitation release date is now 28 September 2017.  This date is an estimate.  The Government reserves the right to release the solicitation prior to or later than 28 September 2017.

Update #28 ·

Cushion Drawings 9331021, 9331022 and 9331023 are available upon request and submittal of an approved DD Form 2345..

Update #27 ·

Added: Aug 03, 2017 1:51 pm Cushion Drawings 9331021, 9331022 and 9331023 are available upon request and submittal of an approved DD Form 2345.

Update #26 ·

Industry Day 2 Q & As, Industry Day 2 slides, and the Desiccant Drawing for part number 9331010 is available upon request and submittal of an approved DD Form 2345. The M548 container drawing that is used for the DSU 33D/B is attached with this posting.

.

Update #25 ·

Added: Aug 02, 2017 12:26 pm Industry Day 2 Q&As, Industry Day 2 slides, and the Desiccant Drawing for part number 9331010 is available upon request and submittal of an approved DD Form 2345.  The M548 container drawing that is used for the DSU 33D/B is attached with this posting. 

 

Update #24 ·


24 July 2017


Official Synopsis for Cockpit-Selectable Height-of-Burst (C-HOBS) Sensor:


Subject: C-HOBS


Action Code: Synopsis


Description: The Joint Direct Attack Munition's (JDAM's) current fuze sensor, DSU-33D/B, has been in production since 1995; significant obsolescence issues prevent continued procurement of this sensor. C-HOBS is a modification program established to resolve current obsolescence issues with the DSU-33D/B sensor and to improve sensor performance. C-HOBS will maintain the same form, fit and function as the DSU-33D/B; however, due to the nature of the changes required to address the obsolescence issues, certain targets of opportunity to future-proof the sensor will be addressed. The changes include both manual and cockpit-selectable height-of-burst with improved system performance for JDAM and the Next Generation Area Attack Weapons (NGAAW) missions, which are pivotal to battlespace success. The C-HOBS requirement will be awarded via full and open competition.


National Stock Number: To be determined.


Qualification Requirement per FAR Subpart 9.2: Pre-qualification not required to propose as qualification will occur during contract performance.


Manufacturer, size, dimensions, other form, fit or functional description, predominant material of manufacture: DSU-33 Technical Data Package, C-HOBS System Requirements Document, and draft Interface Control Document (ICD) has been provided to industry upon request, and is still available upon request through the POC referenced below. The JDAM Joint Operational Requirements Document, Anti-Tamper Security Classification Guide, Final ICD and Technical Order/Technical Manual Work Package will be made available shortly. Please send requests for these documents immediately so the Government can distribute the documents as soon as they become available. A approved DD Form 2345 will be required to receive the above mentioned documents for those who have not yet submitted one to the below POC.


Anticipated Quantity: Maximum of 60,000 C-HOBS units.


Units of issue: Design and Qualification (each) C-HOBS (each), Data and Reports Not Separately Priced (lots), Data and Reports - priced, (each), First Article Acceptance Test (each), Trainers (each), Cable Kits (each), Spares (each) and Life Cycle Surveillance and Test Set, (each).


Destination information: Inspection and acceptance will be at destination for Data and Reports CLINs. Inspection and acceptance will be at origin for all other CLINs.


Delivery Schedule: It is anticipated that Design and Qualification will be completed within 24 months of contract award, and C-HOBS deliveries will have an 18 month PoP which is inclusive of a 6 month long lead time and 12 months for production.


Solicitation Number: The official solicitation number for this requirement will be FA8213-17-R-3046; however the announcement will be listed under the existing FA8213-17-R-DSU33 number as previously used on www.fbo.gov to avoid two separate listings for the same C-HOBS requirement.


NAICS Code: 332993


Classification Code: 13 - Ammunition & explosives.


Pricing Arrangement/Contract Type: The predominant pricing arrangement will be Firm Fixed Price (FFP). Additional pricing arrangements that will be utilized are Cost Plus Fixed Fee (CPFF) and Cost Reimbursable (CR).


Anticipated CLIN Structure:





CLIN


DESCRIPTION


CONTRACT TYPE


1000


Design and Qualification


CPFF


2000


Data and Reports - Not Separately Priced


N/A


2001


Data and Reports - Priced


FFP


3000


First Article Acceptance Test


FFP


3001


C-HOBS


FFP


3002


Trainers D1


FFP


3003


Trainers D2


FFP


3004


Trainers D5


FFP


3005


Cable Kits


FFP


3006


Spares


FFP


4000


C-HOBS


FFP


4001


Trainers D1


FFP


4002


Trainers D2


FFP


4003


Trainers D5


FFP


4004


Cable Kits


FFP


4005


Spares


FFP


5000


C-HOBS


FFP


5001


Trainers D1


FFP


5002


Trainers D2


FFP


5003


Trainers D5


FFP


5004


Cable Kits


FFP


5005


Spares


FFP


6000


C-HOBS


FFP


6001


Trainers D1


FFP


6002


Trainers D2


FFP


6003


Trainers D5


FFP


6004


Cable Kits


FFP


6005


Spares


FFP


7000


C-HOBS


FFP


7001


Trainers D1


FFP


7002


Trainers D2


FFP


7003


Trainers D5


FFP


7004


Cable Kits


FFP


7005


Spares


FFP


7006


Life Cycle Surveillance Test Set


FFP


8000


Travel


CR - No Fee




Period of Performance (PoP): Anticipate an eight-year PoP with a seven-year ordering period.


Proposal Submittal: Offerors will be given at least 45 days to submit a proposal starting from the solicitation release date.


Anticipated Solicitation Release Date: 8 August 2017 (date is subject to change). The Government reserves the right to release the solicitation later than this date.


Anticipated Award Date: 23 May 2018 (date is subject to change).


Set-Aside: N/A - Full and Open competition.


Place of Performance: Contractor's facility.


Foreign Participation: Prospective offerors are advised that foreign participation is not permitted.


Responsible Offerors: All responsible sources may submit a proposal, which shall be considered by the agency.


Export Controlled Data: This acquisition may/does involve technology that has a military or space application. The only US contractors who may participate are those that are certified and registered with the Defense Logistics Information Service (DLIS) (1-800-352-3572) and have a legitimate business purpose. US contractors shall submit a copy of their current, approved DD Form 2345 with their request for solicitation. The form, including instructions for completing the form is available at http://www.dtic.mil/whs/directives/forms/eforms/dd2345.pdf. The solicitation/data package will be mailed to the data custodian identified in block 3 of the DD Form 2345. Foreign participation is not authorized.


Solicitation, Notices & Amendments: The solicitation and all subsequent notices and amendments will be posted on the internet at www.fbo.gov. The Government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice.


Synopsis Respondent's: Respondents to the solicitation shall specify whether it is a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, HUBZone small business, veteran-owned small business or service-disabled veteran-owned small business. Also, respondents shall specify whether they are a U.S. or foreign-owned firm.


Inquiries: Any questions in regards to this notice must be submitted in writing (preferably by email) to the Contracting Office according to the contact information provided below:


Contracting Office Address:


Contracting Officer: Darin Huler (darin.huler@us.af.mil)


6072 Fir Ave


Bldg 1233


Hill AFB, UT 84056-5820

.

Update #23 ·

Added: Jul 24, 2017 4:33 pm

 


24 July 2017


Official Synopsis for Cockpit-Selectable Height-of-Burst (C-HOBS) Sensor:


Subject:  C-HOBS


Action Code: Synopsis


Description:  The Joint Direct Attack Munition's (JDAM's) current fuze sensor, DSU-33D/B, has been in production since 1995; significant obsolescence issues prevent continued procurement of this sensor.  C-HOBS is a modification program established to resolve current obsolescence issues with the DSU-33D/B sensor and to improve sensor performance.  C-HOBS will maintain the same form, fit and function as the DSU-33D/B; however, due to the nature of the changes required to address the obsolescence issues, certain targets of opportunity to future-proof the sensor will be addressed.  The changes include both manual and cockpit-selectable height-of-burst with improved system performance for JDAM and the Next Generation Area Attack Weapons (NGAAW) missions, which are pivotal to battlespace success. The C-HOBS requirement will be awarded via full and open competition.


National Stock Number:  To be determined.


Qualification Requirement per FAR Subpart 9.2:  Pre-qualification not required to propose as qualification will occur during contract performance.


Manufacturer, size, dimensions, other form, fit or functional description, predominant material of manufacture:  DSU-33 Technical Data Package, C-HOBS System Requirements Document, and draft Interface Control Document (ICD) has been provided to industry upon request, and is still available upon request through the POC referenced below.  The JDAM Joint Operational Requirements Document, Anti-Tamper Security Classification Guide, Final ICD and Technical Order/Technical Manual Work Package will be made available shortly.  Please send requests for these documents immediately so the Government can distribute the documents as soon as they become available.  A approved DD Form 2345 will be required to receive the above mentioned documents for those who have not yet submitted one to the below POC.


Anticipated Quantity: Maximum of 60,000 C-HOBS units.


Units of issue: Design and Qualification (each) C-HOBS (each), Data and Reports Not Separately Priced (lots), Data and Reports - priced, (each), First Article Acceptance Test (each), Trainers (each), Cable Kits (each), Spares (each) and Life Cycle Surveillance and Test Set, (each).


Destination information: Inspection and acceptance will be at destination for Data and Reports CLINs.  Inspection and acceptance will be at origin for all other CLINs.


Delivery Schedule:  It is anticipated that Design and Qualification will be completed within 24 months of contract award, and C-HOBS deliveries will have an 18 month PoP which is inclusive of a 6 month long lead time and 12 months for production.


Solicitation Number:  The official solicitation number for this requirement will be FA8213-17-R-3046; however the announcement will be listed under the existing FA8213-17-R-DSU33 number as previously used on www.fbo.gov to avoid two separate listings for the same C-HOBS requirement.


NAICS Code:  332993


Classification Code:  13 - Ammunition & explosives.


Pricing Arrangement/Contract Type:  The predominant pricing arrangement will be Firm Fixed Price (FFP).   Additional pricing arrangements that will be utilized are Cost Plus Fixed Fee (CPFF) and Cost Reimbursable (CR). 


Anticipated CLIN Structure: 


 




CLIN



DESCRIPTION



CONTRACT TYPE



1000



Design and Qualification



CPFF



2000



Data and Reports - Not Separately Priced



N/A



2001



Data and Reports - Priced



FFP



3000



First Article Acceptance Test



FFP



3001



C-HOBS



FFP



3002



Trainers D1



FFP



3003



Trainers D2



FFP



3004



Trainers D5



FFP



3005



Cable Kits



FFP



3006



Spares



FFP



4000



C-HOBS



FFP



4001



Trainers D1



FFP



4002



Trainers D2



FFP



4003



Trainers D5



FFP



4004



Cable Kits



FFP



4005



Spares



FFP



5000



C-HOBS



FFP



5001



Trainers D1



FFP



5002



Trainers D2



FFP



5003



Trainers D5



FFP



5004



Cable Kits



FFP



5005



Spares



FFP



6000



C-HOBS



FFP



6001



Trainers D1



FFP



6002



Trainers D2



FFP



6003



Trainers D5



FFP



6004



Cable Kits



FFP



6005



Spares



FFP



7000



C-HOBS



FFP



7001



Trainers D1



FFP



7002



Trainers D2



FFP



7003



Trainers D5



FFP



7004



Cable Kits



FFP



7005



Spares



FFP



7006



Life Cycle Surveillance Test Set



FFP



8000



Travel



CR - No Fee




  


 


Period of Performance (PoP):  Anticipate an eight-year PoP with a seven-year ordering period.


Proposal Submittal:  Offerors will be given at least 45 days to submit a proposal starting from the solicitation release date.


Anticipated Solicitation Release Date:   8 August 2017 (date is subject to change).  The Government reserves the right to release the solicitation later than this date.


Anticipated Award Date:  23 May 2018 (date is subject to change).


Set-Aside:  N/A - Full and Open competition.


Place of Performance:  Contractor's facility.


Foreign Participation:  Prospective offerors are advised that foreign participation is not permitted.


Responsible Offerors:  All responsible sources may submit a proposal, which shall be considered by the agency.


Export Controlled Data:  This acquisition may/does involve technology that has a military or space application.  The only US contractors who may participate are those that are certified and registered with the Defense Logistics Information Service (DLIS) (1-800-352-3572) and have a legitimate business purpose.  US contractors shall submit a copy of their current, approved DD Form 2345 with their request for solicitation.  The form, including instructions for completing the form is available at http://www.dtic.mil/whs/directives/forms/eforms/dd2345.pdf.  The solicitation/data package will be mailed to the data custodian identified in block 3 of the DD Form 2345.  Foreign participation is not authorized.


Solicitation, Notices & Amendments:  The solicitation and all subsequent notices and amendments will be posted on the internet at www.fbo.gov.  The Government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice. 


Synopsis Respondent's:  Respondents to the solicitation shall specify whether it is a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, HUBZone small business, veteran-owned small business or service-disabled veteran-owned small business.  Also, respondents shall specify whether they are a U.S. or foreign-owned firm.


Inquiries:  Any questions in regards to this notice must be submitted in writing (preferably by email) to the Contracting Office according to the contact information provided below:


Contracting Office Address:


Contracting Officer:  Darin Huler (darin.huler@us.af.mil)


6072 Fir Ave


Bldg 1233


Hill AFB, UT 84056-5820

Update #22 ·


Update:


1) The solicitation date showing as 22 Aug 2017 on the Model Contract FA821317R3046 is not accurate. The schedule to go over RFP release and Proposal due dates will be presented at Industry Day.


2) The attached Industry day 2 announcement should read 27-28 June "2017" instead of "2016."

.

Update #21 ·

Added: Jun 07, 2017 11:59 am  

Update:


1) The solicitation date showing as 22 Aug 2017 on the Model Contract FA821317R3046 is not accurate.  The schedule to go over RFP release and Proposal due dates will be presented at Industry Day.


2) The attached Industry day 2 announcement should read 27-28 June "2017" instead of "2016."

Update #20 ·

The Government has determined that C-HOBS will be competed 100% full and open.

Industry Day # 2 has been scheduled at a facility near Eglin AFB FL on the 27th - 28th of June 2017. Please reference the Industry Day 2 Announcement and Agenda attachments for additional information. Directions, registrations, and an Industry Day Question Request form are attached.


The Draft RFP has also been attached which will be the main topic of the Industry Day. Please come prepared to discuss the Draft RFP, with any comments, recommendations and questions. All documents associated with the Draft RFP are not finalized and will be changing based on further Government review and feedback from industry. Industry is highly encouraged to provide feedback, comments, and questions in writing to Darin Huler utilizing the Industry Day Question Request attachment.


A draft of the C-HOBS Interface Control Document (ICD) is available along with an updated System Requirements Document (SRD). Interested vendors must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to Darin Huler in order to be eligible to receive the ICD and SRD.


The Government team is working on getting the solicitation DD254 finalized in order to be able to provide, upon request and U.S. security classification verification, classified portions of the Technical Data Package (TDP).


Deadlines:


1) Industry Day Registrations (See Industry Day Registration Attachment) due no later than (NLT) 15 June 2017.


2) Classified discussions are not planned. If an interested party desires to present or discuss classified information, please inform Darin Huler via email NLT 15 June 2017. Based on completion of the DD254 the Government might not be able to accommodate such requests.


3) Industry Day Question Request due NLT 22 June 2017.

.

Update #19 ·

Added: Jun 02, 2017 12:29 pm The Government has determined that C-HOBS will be competed 100% full and open.

Industry Day # 2 has been scheduled at a facility near Eglin AFB FL on the 27th - 28th of June 2017.  Please reference the Industry Day 2 Announcement and Agenda attachments for additional information.  Directions, registrations, and an Industry Day Question Request form are attached.


The Draft RFP has also been attached which will be the main topic of the Industry Day.  Please come prepared to discuss the Draft RFP, with any comments, recommendations and questions. All documents associated with the Draft RFP are not finalized and will be changing based on further Government review and feedback from industry.  Industry is highly encouraged to provide feedback, comments, and questions in writing to Darin Huler utilizing the Industry Day Question Request attachment.


A draft of the C-HOBS Interface Control Document (ICD) is available along with an updated System Requirements Document (SRD).  Interested vendors must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to Darin Huler in order to be eligible to receive the ICD and SRD.


The Government team is working on getting the solicitation DD254 finalized in order to be able to provide, upon request and U.S. security classification verification, classified portions of the Technical Data Package (TDP). 


Deadlines:


1) Industry Day Registrations (See Industry Day Registration Attachment) due no later than (NLT) 15 June 2017.


2) Classified discussions are not planned.  If an interested party desires to present or discuss classified information, please inform Darin Huler via email NLT 15 June 2017.  Based on completion of the DD254 the Government might not be able to accommodate such requests.


3) Industry Day Question Request due NLT 22 June 2017.

Update #18 ·

The Government plans on making the classified portions of the DSU-33 Technical Data Package (TDP) available in preperation for an upcoming Industry Day (date to be announced within the next couple of weeks) and issuance of the draft RFP. Attendees who are interested in receiving access to the classified portions of the TDP must have a valid U.S. security clearance of SECRET or higher. The annex to the TDP is classified at the SECRET LEVEL which will only be released to interested parties with a need to know possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
In order to verify your U.S. security clearance, please enter a visit request to JPAS SMO Code HP1MFTKFT and put Mr. Kyle Chapman as the POC. Once you have submitted your visit request, please notify Darin Huler via email at darin.huler@us.af.mil and include in your email a justification statement of a need to know.
Please input and provide the requested information ASAP but no later than 31 May 2017..

Update #17 ·

Added: May 22, 2017 1:46 pm Modified: May 22, 2017 2:24 pmTrack Changes The Government plans on making the classified portions of the DSU-33 Technical Data Package (TDP) available in preperation for an upcoming Industry Day (date to be announced within the next couple of weeks) and issuance of the draft RFP.  Attendees who are interested in receiving access to the classified portions of the TDP must have a valid U.S. security clearance of SECRET or higher.  The annex to the TDP is classified at the SECRET LEVEL which will only be released to interested parties with a need to know possessing the appropriate clearance.  All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R). 

In order to verify your U.S. security clearance, please enter a visit request to JPAS SMO Code HP1MFTKFT and put Mr. Kyle Chapman as the POC. Once you have submitted your visit request, please notify Darin Huler via email at darin.huler@us.af.mil and include in your email a justification statement of a need to know. 

Please input and provide the requested information ASAP but no later than 31 May 2017.

Update #16 ·

The Government plans on making the classified portions of the DSU-33 Technical Data Package (TDP) available in preperation for an upcoming Industry Day (date to be announced within the next couple of weeks) and issuance of the draft RFP. Attendees who are interested in receiving access to the classified portions of the TDP must have a valid U.S. security clearance of SECRET or higher. The annex to the TDP is classified at the SECRET LEVEL which will only be released to interested parties with a need to know possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R). Please provide the following:

Company Name:


Cage Code:


Security POC:


Individual(s) and associated JPAS # who will receive the classified docs:


Justification statement of need to know:
Please provide this information ASAP but no later than 31 May 2017 to Darin Huler at darin.huler@us.af.mil

.

Update #15 ·

Added: May 22, 2017 1:46 pm The Government plans on making the classified portions of the DSU-33 Technical Data Package (TDP) available in preperation for an upcoming Industry Day (date to be announced within the next couple of weeks) and issuance of the draft RFP.  Attendees who are interested in receiving access to the classified portions of the TDP must have a valid U.S. security clearance of SECRET or higher.  The annex to the TDP is classified at the SECRET LEVEL which will only be released to interested parties with a need to know possessing the appropriate clearance.  All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).  Please provide the following:

Company Name:


Cage Code:


Security POC:


Individual(s) and associated JPAS # who will receive the classified docs:


Justification statement of need to know:

Please provide this information ASAP but no later than 31 May 2017 to Darin Huler at darin.huler@us.af.mil

Update #14 ·


Interested parties are invited to respond to the attached Sources Sought Synopsis.



Deadline: No Later Than 5:00 PM MDT, 24 October 2016. The USG retains the right to NOT consider late responses.

.

Update #13 ·

Added: Sep 22, 2016 5:21 pm

 


Interested parties are invited to respond to the attached Sources Sought Synopsis.


 


Deadline:  No Later Than 5:00 PM MDT, 24 October 2016.  The USG retains the right to NOT consider late responses.

Update #12 ·


The DSU-33 Industry Day slides that were presented on 17 August 2016 at Hill AFB are available upon request. Interested vendors must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement" to the POC(s) identified on this FBO posting in order to be eligible to receive the slides.

.

Update #11 ·

Added: Sep 21, 2016 3:38 pm

 


The DSU-33 Industry Day slides that were presented on 17 August 2016 at Hill AFB are available upon request.  Interested vendors must provide a copy of a signed DD Form 2345 "Military Critical Technical Data Agreement"  to the POC(s) identified on this FBO posting in order to be eligible to receive the slides.

Update #10 ·

Attached are the Question and Answers and sign-in sheet from the Industry Day held on 17 Aug..

Update #9 ·

Added: Sep 01, 2016 4:01 pm Attached are the Question and Answers and sign-in sheet from the Industry Day held on 17 Aug.

Update #8 ·

Further explanation on the twenty (20) printed single sided pages for the RFI response. Title pages and the table of contents do not count against the twenty (20) page limit.
A Government Support Contractor from HX5 that has an NDA with the Government will be attending the General and one-on-one sessions of Industry Day.

.

Update #7 ·

Added: Aug 08, 2016 10:49 am

Further explanation on the twenty (20) printed single sided pages for the RFI response.  Title pages and the table of contents do not count against the twenty (20) page limit.

A Government Support Contractor from HX5 that has an NDA with the Government will be attending the General and one-on-one sessions of Industry Day.

Update #6 ·

Added Industry Day Question Request Form. Please submit this completed form with your questions no later than 8 August 2016 5:00 MDT..

Update #5 ·

Added: Aug 03, 2016 11:09 am Added Industry Day Question Request Form. Please submit this completed form with your questions no later than 8 August 2016 5:00 MDT.

Update #4 ·

Location of the Industry Day has been confirmed and will be held at Hill AFB UT at the Base Chapel. Maps have been attached to this announcement. Address is as follows:
5711 E Avenue, Hill AFB, UT 84056.
Once you enter the South gate (heading north down Hillfield road which will take you directly to the South Gate) take the very first left which is just a few yards from the security gate. You will pass the Warrior Fitness Center and the Chapel will be on your right hand side. The Chapel is two buildings with an annex. Enter into the Chapel lobby (the southside building) and head downstairs to the basement.

.

Update #3 ·

Added: Jul 21, 2016 3:59 pm

Location of the Industry Day has been confirmed and will be held at Hill AFB UT at the Base Chapel.  Maps have been attached to this announcement.  Address is as follows:

5711 E Avenue, Hill AFB, UT 84056. 

Once you enter the South gate (heading north down Hillfield road which will take you directly to the South Gate) take the very first left which is just a few yards from the security gate.  You will pass the Warrior Fitness Center and the Chapel will be on your right hand side.  The Chapel is two buildings with an annex.  Enter into the Chapel lobby (the southside building) and head downstairs to the basement.

Update #2 ·

Please respond to both the attached RFI request and Industry Day announcement for DSU-33.
Deadlines:
-Industry Day Registration (see industry day Registration attachment) due 8 August 2016
-RFI Response (See RFI attachment) due 8 August 2016.

Update #1 ·

Added: Jul 07, 2016 2:56 pm Please respond to both the attached RFI request and Industry Day announcement for DSU-33.

Deadlines:

-Industry Day Registration (see industry day Registration attachment) due 8 August 2016
-RFI Response (See RFI attachment) due 8 August 2016

Attachments

Files attached to this notice, newest first
File Type Posted
CRM_C-HOBS_26_Feb_2018.xlsx XLSX spreadsheet
Exhibit_A_through_M_Updated_CDRLs_02-22-18.pdf PDF
FA821318R3015.pdf PDF
CRM_C-HOBS_14_Feb_2018.xlsx XLSX spreadsheet
CDRL_04_DAL_updated_w-CSOW_signed.pdf PDF
ppi_tool.accdb MDB file
CRM_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
Total_Evaluated_Price_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
CRM_C-HOBS_25_Jan_2018.XLSX XLSX spreadsheet
CRM_C-HOBS.XLSX XLSX spreadsheet
Section_M_-_17_Jan_2018.docx DOCX document
Attachment_7_Incremental_Spares_17_Jan_2018.xlsx XLSX spreadsheet
Exhibit_A_through_M_CDRLS_Updated_--32.pdf PDF
Total_Evaluated_Price_C-HOBS_Appendix_3_of_Section_L_Amend_1.xlsx XLSX spreadsheet
CHOBS_Statement_of_Objectives__1-11-18.docx DOCX document
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_17_Jan_2018.docx DOCX document
Exhibit_N_C-HOBS_Digital_Data_Requirmeents_and_CDRL_Supp_Instructions_Amend_1.pdf PDF
CHOBS_Section_L_17_Jan_2018.docx DOCX document
Exhibit_A_through_M_CDRLS.pdf PDF
Exhibit_N_-_C-HOBS_Digital_Data_Requirements_and_CDRL_Supp_Instructions.pdf PDF
Attachment_4_DD_254.pdf PDF
Attachment_3_Ordering_Procedures.pdf PDF
Section_M_-_Final.pdf PDF
Attachment_7_Incremental_Spares.xlsx XLSX spreadsheet
Attachment_2_Rights_to_Data.pdf PDF
BOE_Summary_Appendix_IV_to_Section_L_Final.xlsx XLSX spreadsheet
Total_Evaluated_Price_(TEP)_Appendix_III_to_Section_L_Final.xlsx XLSX spreadsheet
Signed_Solicitation_DD254.pdf PDF
M548_Container_Drawings.pdf PDF
FA821317R3046_Model_Contract_DRAFT_v1.pdf PDF
REEF_Floor_Plan.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_A-A001-A034.pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Draft,_C-HOBS_Attachment_2_RIGHTS_IN_DATA_v11,_05-31-17.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_B_B001-B010.pdf PDF
REEF-Map_to.pdf PDF
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_v3.pdf PDF
CHOBS_Section_L_V7.pdf PDF
Industry_Day_2_Agenda.pptx PPTX presentation
C-HOBS_Digital_Data_Rqmts_and_CDRL_Supp_Instructions_Exhibit_E.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_D_D001-D029.pdf PDF
CHOBS_Statement_of_Objectives_DRAFT,_v6,_05-31-17.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Final_for_Draft_RFP_C-HOBS_Exhibit_C_C001.pdf PDF
Section_M_-_Trade_Off_Working_File_v17_30_May_2017.pdf PDF
Sources_Sought_22_September_2016.pdf PDF
Industry_Day_Q_and_A_DSU_33_v2_PDF.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Close_up_Map_to_Base_Chapel.pdf PDF
RFI_7_July_2016.docx DOCX document
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity