Final_for_Draft_RFP_C-HOBS_Exhibit_D_D001-D029.pdf

PDF 1 MB Posted

Attached to
C-HOBS FA8213-18-R-3015 Federal contract opportunity
Solicitation number
FA8213-17-R-DSU33
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a Contract Data Requirements List (CDRL) for a federal contract to produce C-HOBS fuzes. The CDRL requires the contractor to submit 29 different data items related to engineering, quality assurance, testing, program management, and other areas. Key deliverables include engineering change proposals, test plans and reports, failure analyses, program schedules and status reports, and documentation of quality assurance processes and certifications. Submission dates and approval timelines are provided for each data item. The federal agency requiring the data is the Air Force Materiel Command Lifecycle Management Center.

Exhibit D CDRLS

View the file

Other files for this federal contract opportunity

Other files attached to C-HOBS FA8213-18-R-3015, newest first.
File Type Posted
CRM_C-HOBS_26_Feb_2018.xlsx XLSX spreadsheet
Exhibit_A_through_M_Updated_CDRLs_02-22-18.pdf PDF
FA821318R3015.pdf PDF
CRM_C-HOBS_14_Feb_2018.xlsx XLSX spreadsheet
CDRL_04_DAL_updated_w-CSOW_signed.pdf PDF
ppi_tool.accdb MDB file
CRM_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
Total_Evaluated_Price_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
CRM_C-HOBS_25_Jan_2018.XLSX XLSX spreadsheet
CRM_C-HOBS.XLSX XLSX spreadsheet
Section_M_-_17_Jan_2018.docx DOCX document
Attachment_7_Incremental_Spares_17_Jan_2018.xlsx XLSX spreadsheet
Exhibit_A_through_M_CDRLS_Updated_--32.pdf PDF
Total_Evaluated_Price_C-HOBS_Appendix_3_of_Section_L_Amend_1.xlsx XLSX spreadsheet
CHOBS_Statement_of_Objectives__1-11-18.docx DOCX document
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_17_Jan_2018.docx DOCX document
Exhibit_N_C-HOBS_Digital_Data_Requirmeents_and_CDRL_Supp_Instructions_Amend_1.pdf PDF
CHOBS_Section_L_17_Jan_2018.docx DOCX document
Exhibit_A_through_M_CDRLS.pdf PDF
Exhibit_N_-_C-HOBS_Digital_Data_Requirements_and_CDRL_Supp_Instructions.pdf PDF
Attachment_4_DD_254.pdf PDF
Attachment_3_Ordering_Procedures.pdf PDF
Section_M_-_Final.pdf PDF
Attachment_7_Incremental_Spares.xlsx XLSX spreadsheet
Attachment_2_Rights_to_Data.pdf PDF
BOE_Summary_Appendix_IV_to_Section_L_Final.xlsx XLSX spreadsheet
Total_Evaluated_Price_(TEP)_Appendix_III_to_Section_L_Final.xlsx XLSX spreadsheet
Signed_Solicitation_DD254.pdf PDF
M548_Container_Drawings.pdf PDF
FA821317R3046_Model_Contract_DRAFT_v1.pdf PDF
REEF_Floor_Plan.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_A-A001-A034.pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Draft,_C-HOBS_Attachment_2_RIGHTS_IN_DATA_v11,_05-31-17.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_B_B001-B010.pdf PDF
REEF-Map_to.pdf PDF
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_v3.pdf PDF
CHOBS_Section_L_V7.pdf PDF
Industry_Day_2_Agenda.pptx PPTX presentation
C-HOBS_Digital_Data_Rqmts_and_CDRL_Supp_Instructions_Exhibit_E.pdf PDF
CHOBS_Statement_of_Objectives_DRAFT,_v6,_05-31-17.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Final_for_Draft_RFP_C-HOBS_Exhibit_C_C001.pdf PDF
Section_M_-_Trade_Off_Working_File_v17_30_May_2017.pdf PDF
Sources_Sought_22_September_2016.pdf PDF
Industry_Day_Q_and_A_DSU_33_v2_PDF.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Close_up_Map_to_Base_Chapel.pdf PDF
RFI_7_July_2016.docx DOCX document
Industry_Day_Annoucement_7_July_2016.docx DOCX document
Show all 50

C-HOBS FA8213-18-R-3015 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

CONTRACT ID: C-HOBS PRODUCTION

CONTRACT NO. : FA8213-18-D-3046

SYSTEM ITEM: EXHIBIT D

SEQUENCE

NUMBER

DID/TITLE

PAGE

NO.

D001 DI-SESS-80639D

ENGINEERING CHANGE PROPOSAL (ECP)

D002 DI-SESS-80640D

REQUEST FOR VARIANCE (RFV)

D003 DI-SESS-80858C

SUPPLIER’S CONFIGURATION MANAGEMENT PLAN (CMP)

D004 DI-MGMT-81435A

DATA ACCESSION LIST (DAL)

D005 DI-SESS-81253C

CONFIGURATION STATUS ACCOUNTING (CSA)

INFORMATION

D006 DI-SAFT-80102C

SAFETY ASSESSMENT REPORT (SAR)

D007 DI-SAFT-80105C

SYSTEM SAFETY PROGRAM PROGRESS REPORT (SSPPR)

D008 DI-SAFT-81626

SYSTEM SAFETY PROGRAM PLAN (SSPP)

D009

DI-SAFT-80101C

SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHAR)

D010

D011

DI-SAFT-80931B

EXPLOSIVE ORDRIANCE DISPOSAL DATA

DI-SAFT-81299C

EXPLOSIVE HAZARD CLASSIFICATION DATA

D012 DI-SESS-81785A

SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)

D013 DI-IPSC-81431A

SYSTEM/.SUBSYSTEM PERFORMANCE SPECIFICATION

(SPS)

D014

DI-ADMIN-81306

PROGRAM PROTECTION IMPLEMENTATION PLAN (PPIP)

DRAFT

TABLE OF CONTENTS

CONTRACT ID: C-HOBS PRODUCTION

CONTRACT NO. : FA8213-18-D-3046

SYSTEM ITEM: EXHIBIT D

SEQUENCE

NUMBER

DID/TITLE

PAGE

NO.

D015 DI-SESS-81315B

FAILURE REPORTING, ANALYSIS AND CORRECTIVE

ACTION SYSTEM REPORT (FRACAS)

D016 DI-QCIC-81794

QUALITY ASSURANCE PROGRAM PLAN (QAPP)

D017

DI-QCIC-81187

QUALITY ASSESSMENT REPORT (QAR)

D018 DI-MGMT-81889

MANUFACTURING PLAN (MP)

D019 DI-ADMIN-81249B/T, DI-ADMIN-81250B

CONFERENCE AGENDA/MINUTES

D020 DI-MISC-80043B/T

AMMUNITION DATA CARD

D021 DI-SAFT-81640

AMMUNITION DEMILIITARIZATION AND DISPOSTITION

PLAN

D022 DI-NDTI-80566A/T

TEST PLANS (TPs)

D023

D024

D025

D026

D027

DO28

D029

DI-NDTI-80809B/T

TEST / INSPECTION REPORTS (TIPs)

DI-MGMT-81772

LEAD-FREE CONTROL PLAN (LFCP)

DI-SESS-81585B

REIABILITY AND MAINTAINABILITY TEST PLAN (RMTP)

DI-MGMT-81334D/T

CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)

DI-FNCL81566C

COST DATA SUMMARY REPORT (CDSR)

DI-MGMT-81468/T

CONTRACT FUNDS STATUS REPORT (CFSR)

DI-MGMT-81861A/T

INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

D

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

FA8213-18-D-3046

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL

3. SUBTITLE

ECP

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639D

5. CONTRACT REFERENCE

SOO Para, 2.7,2.10.3;3.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: SHALL INCLUDE BOM AS A PART OF THE ECP. ECN’S, ECR’S AND ECO’S

ETC. SHALL ALSO BE ATTACHED IN FULL AS BACKGROUND INFORMATION. ALL

ECPs SHALL BE SUBMITTED USING DD FORM 1692.

BLK 8: GOVERNMENT APPROVAL OF MAJOR (CLASS I) CHANGES REQUIRED FOR

CONTROL OF THE SYSTEM LEVEL DESIGN REQUIREMENT CHANGES.

GOVERNMENT RESPONSES ARE AS FOLLOWS: EMERGENCY ECPs, 48 HOURS;

URGENT ECPs, 30 CALENDAR DAYS; ROUTINE ECPs, 90 CALENDAR DAYS, RESUBMITTAL, IF REQUIRED, IS DUE 30 DAYS AFTER RECEIPT OF GOVERNMENT

COMMENTS.

BLKS 10, 12, 13: DELIVER AFTER SUCCESSFUL FAAT AND WHEN PROPOSED

CHANGES TO APPROVED BASELINED ENGINEERING DATA OCCUR. ALL MAJOR

ECPs SHALL BE APPROVED BY USG FOR MAJOR CHANGES IMPLEMENTATION.

MAJOR ECPs SHALL CONTAIN A SAFETY IMPACT ASSESSMENT THAT INCLUDES A

SYSTEM, SUBSYSTEM, AND OPERATING AND SUPPORT HAZARD ANALYSIS.

PREPARATION COSTS OF MAJOR ECPs SHALL BE PRICED AS PART OF THE ECP

IMPLEMENTATION COSTS BUT SHALL BE SEPARATELY IDENTIFIED IN THE ECP.

DI-CMAN-80642B (NOR) SHALL BE USED IN CONJUNTION WITH THIS DID.

MINOR (CLASS II) ECPs SHALL BE NO COST.

VECPs ARE DUE AT COMPLETION OF APPLICABLE PRODUCIBILITY ENHANCEMENT

ANALYSIS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN ELECTRONICALLY

TRANSMITTED TO GOVERNMENT SERVER, CONTRACTOR HAS GIVEN NOTICE OF

DELIVERY TO THE GOVERNMENT, AND THE GOVERNMENT HAS GIVEN NOTICE TO

CONTRACTOR OF SUCCESSFUL TRANSMITTAL OF SAID DATA.

*AFLCMC/EBHC LT 1

DATA

15. TOTAL

G. PREPARED BY

RONALD G SACCO II

H. DATE

05-17-17

I. APPROVED BY

J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D002

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE

3. SUBTITLE

RFV

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SOO Para, 2.7, 2.10.3; 3.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 8: PCO APPROVAL IS REQUIRED FOR MAJOR/CRITICAL DEVIATION

PRIOR TO IMPLEMENTATION. GOVERNMENT RESPONSES ARE AS

FOLLOWS: CRITICAL OR MAJOR DEVIATIONS, 30 CALENDAR DAYS AFTER

RECEIPT. RESUBMITTAL, IF REQUIRED, IS DUE 30 DAYS AFTER RECEIPT OF

GOVERNMENT COMMENTS.

BLKS 10, 12, 13: DELIVER AS REQUIRED.

ALL MAJOR AND CRITICAL DEVIATIONS SHALL CONTAIN A SAFETY

IMPACT ASSESSMENT WHICH INCLUDES A SYSTEM, SUBSYSTEM, AND

OPERATING AND SUPPORT HAZARD ANALYSIS.

NOTE: THIS IS A NO COST DATA ITEM.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

SUCCESSFUL TRANSMITTAL OF SAID DATA.

H. DATE

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D003

2. TITLE OF DATA ITEM

CONFIGURATION MANAGEMENT PLAN

3. SUBTITLE

CMP

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80858C

5. CONTRACT REFERENCE

SOO Para, 2.7

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT IS ACCEPTABLE.

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT AND FORMAT.

GOVERNMENT APPROVAL/DISAPPROVAL PROVIDED 30 DAYS AFTER

RECEIPT OF DOCUMENT.

BLK 10, 12, 13: SUBMITTAL DUE 30 DAYS AFTER JPF CONTRACT AWARD.

UPDATE CHANGES OCCUR.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

H. DATE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D004

2. TITLE OF DATA ITEM

DATA ACCESSION LIST/INTERNAL DATA

3. SUBTITLE

DAL

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81453A

5. CONTRACT REFERENCE

SOO Para, 2.2; 2.2.2-7; 2.3-4; 2.6-8; 2.10.1;2.10.5;

2.10.8; 2.11.8; 3.3-4

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: THE DAL SHALL INCLUDE, BUT NOT BE LIMITED TO INTERNAL

DATA, PRODUCTION PROCESSES, WORK INSTRUCTIONS, PRODUCTION

SCHEDULES, WORK IN PROCESS, CONFIGURATION STATUS ACCOUNTING

INFORMATION, RAW MATERIAL INVENTORY, AND SCRAP RATES ETC.

BLKS 10, 12, 13: INITIAL SUBMITTAL DUE 90 DAYS AFTER CONTRACT

AWARD. SUBSEQUENT SUBMITTALS DUE NLT THE 15TH OF EVERY MONTH

THEREAFTER.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

file://egacq1/org$/02.04_FUZES%20-%20RESTRICTED/JPF/08%20-%20Contracting/08-19%20%20Follow-On%20JPF%20Contract%20Planning/RFP/EXHIBITS/Exhibit%20A/DIDs%20List/DI-MGMT-81453A.PDF

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D005

2. TITLE OF DATA ITEM

CONFIGURATION STATUS ACCOUNTING INFORMATION

3. SUBTITLE

CSA

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81253C/T

5. CONTRACT REFERENCE

SOO Para, 2.7

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

AS REQ

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

AS REQ

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT IS ACCEPTABLE.

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT AND FORMAT.

GOVERNMENT APPROVAL/DISAPPROVAL PROVIDED 30 DAYS AFTER

RECEIPT OF DOCUMENT.

BLKS 10, 12, 13: INITIAL SUBMITTAL DUE 90 DAYS AFTER CONTRACT

AWARD. SUBSEQUENT SUBMITTALS DUE NLT THE 15TH OF EVERY MONTH

THEREAFTER.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D006

2. TITLE OF DATA ITEM

SAFETY ASSESSMENT REPORT

3. SUBTITLE

SAR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102C

5. CONTRACT REFERENCE

SOO Para, 2.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT ACCEPTABLE.

BLK 10, 12, 13: UPDATE AS CHANGES OCCUR.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

AFLCMC/EBHC LT 1

file://egacq1/org$/02.04_FUZES%20-%20RESTRICTED/JPF/08%20-%20Contracting/08-19%20%20Follow-On%20JPF%20Contract%20Planning/RFP/EXHIBITS/Exhibit%20A/DIDs%20List/DI-CMAN-81248A.PDF

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D007

2. TITLE OF DATA ITEM

SYSTEM SAFETY PROGRAM PROGRESS REPORT

3. SUBTITLE

SSPPR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80105C

5. CONTRACT REFERENCE

SOO Para, 2.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE / R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLKS 10, 12, 13: INITIAL SUBMITTAL DUE 90 CALENDAR DAYS AFTER

CONTRACT AWARD. UPDATE AS REQUIRED DUE TO CHANGES.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D008

2. TITLE OF DATA ITEM

SYSTEM SAFETY PROGRAM PLAN

3. SUBTITLE

SSPP

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81626

5. CONTRACT REFERENCE

SOO Para, 2.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLKS 10, 12, 13: UPDATE AS REQUIRED DUE TO CHANGES. SUBMIT WHEN

UPDATED AND/OR AT GOVERNMENT REQUEST.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER, CONTRACTOR

HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT, AND THE

GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF SUCCESSFUL

TRANSMITTAL OF SAID DATA.

*AFLCMC/EBHC- LT 1

1 1

G. PREPARED BY

RONALD G SACCO II

file://egacq1/org$/02.04_FUZES%20-%20RESTRICTED/JPF/08%20-%20Contracting/08-19%20%20Follow-On%20JPF%20Contract%20Planning/RFP/EXHIBITS/Exhibit%20A/DIDs%20List/DI-MGMT-81398A.PDF

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

D

C. CATEGORY

OTHER

D. SYSTEM/ITEM

JPF FOLLOW-ON PRODUCTION

E. CONTRACT/PR NO.

D009

2. TITLE OF DATA ITEM

System Safety Hazard Analysis Report (SSHAR)

3. SUBTITLE

SSHAR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80101C

5. CONTRACT REFERENCE

SOO Para, 2.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT ACCEPTABLE.

BLK 9: APPLY AND USE DISTRIBUTION STATEMENTS IN ACCORDANCE WITH

ATTACHMENT 3 OF THE CONTRACT.

BLKS 10, 12, 13: UPDATE AS CHANGES OCCUR AND/OR AT GOVERNMENT

REQUEST.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER, CONTRACTOR

HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT, AND THE

GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF SUCCESSFUL

TRANSMITTAL OF SAID DATA.

*AFLCMC/EBHC- LT 1

G. PREPARED BY

RONALD G SACCO II

file://egacq1/org$/02.04_FUZES%20-%20RESTRICTED/JPF/08%20-%20Contracting/08-19%20%20Follow-On%20JPF%20Contract%20Planning/RFP/EXHIBITS/Exhibit%20A/DIDs%20List/DI-MGMT-81453A.PDF

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D010

2. TITLE OF DATA ITEM

EXPLOSIVE ORDNANCE DISPOSAL DATA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80931B

5. CONTRACT REFERENCE

SOO Para, 2.3 and 2.11.8

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

AS REQ

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT. APPROVAL

DUE NO LATER THAN 30 CALENDAR DAYS AFTER RECEIPT.

RESUBMITTAL, IF REQUIRED, IS DUE NO LATER THAN 30 CALENDAR DAYS

AFTER RECEIPT OF GOVERNMENT COMMENTS.

BLK 9: APPLY AND USE DISTRIBUTION STATEMENTS IN ACCORDANCE

WITH ATTACHMENT 3 OF THE CONTRACT.

BLK 10: SUBMIT AS REQUIRED DUE TO CHANGES IN EXPLOSIVE

ORDNANCE DISPOSAL DATA AND/OR AT GOVERNMENT REQUEST.

BLK 13: UPDATES SHALL BE SUBMITTED IF CHANGES OCCUR.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

SUCCESSFUL TRANSMITTAL OF SAID DATA.

AFLCMC/EBHC LT 1

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D011

2. TITLE OF DATA ITEM

EXPLOSIVE HAZARD CLASSIFICATION DATA REPORT

3. SUBTITLE

EHCDR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81299C

5. CONTRACT REFERENCE

SOO Para, 2.3; 2.11.8

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT. APPROVAL

DUE NO LATER THAN 30 CALENDAR DAYS AFTER RECEIPT.

RESUBMITTAL, IF REQUIRED, IS DUE NO LATER THAN 30 CALENDAR DAYS

AFTER RECEIPT OF GOVERNMENT COMMENTS.

BLKS 10, 12, 13: UPDATE AS REQUIRED DUE TO CHANGES AFTER

CONTRACT AWARD AND/OR AT GOVERNMENT REQUEST. RESUMITTAL, IF

REQUIRED, IS DUE NO LATER THAN 30 CALENDAR DAYS AFTER RECEIPT

OF GOVERNMENT COMMENTS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

SUCCESSFUL TRANSMITTAL OF SAID DATA.

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D012

2. TITLE OF DATA ITEM

SYSTEMS ENGINEERING MANAGEMENT PLAN

3. SUBTITLE

SEMP

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81785A

5. CONTRACT REFERENCE

SOO Para, 2.2

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE / R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT. APPROVAL

DUENO LATER THAN 30 CALENDAR DAYS AFTER RECEIPT. RESUBMITTAL,

IF REQUIRED, IS DUE NO LATER THAN 30 CALENDAR DAYS AFTER RECEIPT

OF GOVERNMENT COMMENTS.

BLKS 10, 12, 13: INITIAL SUBMITTAL DUE NO LATER THAN 90 CALENDAR

DAYS AFTER CONTRACT AWARD. RESUBMITTAL, IF REQUIRED, IS DUE NO

LATER THAN 30 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT

COMMENTS. UPDATE ANNUALLY DUE TO CHANGES.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

SUCCESSFUL TRANSMITTAL OF SAID DATA.

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D013

2. TITLE OF DATA ITEM

SYSTEM/SUBSYSTEM PERFORMANCE SPECIFICATION

3. SUBTITLE

SPS

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81431A

5. CONTRACT REFERENCE

SOO Para, 2.2; 2.2.1; and 3.3

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK : CONTRACTOR FORMAT IS AUTHORIZED PROVIDED THE

CONTENTSOF THE DID ARE MET.

BLKS 8, 10 AND 13: DRAFT PLAN DUE TO GOVERNMENT FOR REVIEW AND

APPROVAL NO LATER THAN 30 CALENDAR DAYS AFTER CONTRACT

AWARD. THE CONTRACTOR HAS 21 CALENDAR DAYS TO INCORPORATE

COMMENTS INTO PLAN AND RES-RESUBMIT TO GOVERNMENT FOR

APPROVAL. ANY CHANGES TO THE PERFORMANCE OF THE HARDWARE

AND SOFTWARE SHALL BE DOCUMENTED IN REVISIONS TO THE SYSTEMS

SPECIFICATION AND SUBMITTED TO THE GOVERNMENT FOR REVIEW AND

APPROVAL.

BLK 14: *DATA IETMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

SUCCESSFUL TRANSMITTAL OF SAID DATA.

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D014

2. TITLE OF DATA ITEM

PROGRAM PROTECTION IMPLENTATION PLAN

3. SUBTITLE

PPIP

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81306

5. CONTRACT REFERENCE

SOO Para, 2.10.2

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLKS 4: CONTRACTOR FORMAT IS AUTHORIZED PROVIDED THE

CONTENTS OF THE DID ARE MET.

BLK 8: GOVERNMENT APPROVAL REQUIRED TO ENSURE COMPLETE AND

CORRECT CONTENT. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS

FOR REVIEW AND COMMENT. THE CONTRACTOR SHALL HAVE 15

CALENDAR DAYS TO INCORPORATE GOVERNMENT COMMENTS AND

RESUBMIT FOR APPROVAL.

BLK 12: INTIAL SUBMITTAL DUE NO LATER THAN CRITICAL DESIGN

REVIEW (CDR).

BLK 13: ANY CHANGES SHALL BE DOCUMENTED IN REVISIONS AND

SUBMITTED TO THE GOVERNMENT FOR REVIEW AND CONCURRENCE.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D015

2. TITLE OF DATA ITEM

FAILURE SUMMARY AND ANALYSIS REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81315B

5. CONTRACT REFERENCE

SOO Para, 2.3; 2.5

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: GOVERNMENT APPROVED CONTRACTOR FORMAT ACCEPTABLE.

BLKS 10, 12, 13: A PRELIMINARY EMAIL NOTIFICATION (INDICATING C-HOBS LAT, LOT#,

DAY/DATE OF THE LAT, PASS/FAIL STATUS, QUANTITY, QUANTITY TESTED, AND FACILITY

LOCATION) SHALL BE SUBMITTED WITHIN TWENTY-FOUR (24) HOURS OF A LAT. IF A

FAILURE OCCURS DURING LAT OR RE-LAT, FINAL FRACAS REPORTS ARE DUE WITHIN 45

CALENDAR DAYS OF THE FAILURE. AFTER RECEIPT OF A FRACAS REPORT, THE

GOVERNMENT HAS NO LESS THAN 5 BUSINESS DAYS (NOT TO EXCEED 15 BUSINESS DAYS)

TO REVIEW AND RESPOND WITH AN APPROVAL/DISAPPROVAL OF THE FRACAS REPORT. IF

DISAPPROVED, THE FINAL FRACAS REPORT MUST BE RESUBMITTED WITHIN 15 CALENDAR

DAYS AFTER DISAPPROVAL NOTICE IS RECEIVED. THE TIMEFRAME FOR GOVERNMENT

REVIEW/RESPONSE TO THE RESUBMITTED REPORT REMAINS THE SAME AS PREVIOUSLY

STATED. IF THE INTENT IS TO RETURN TO LAT PRIOR TO FRACAS APPROVAL, A

DETERMINATION (TO INCLUDE RATIONALE AND RISK ASSESSMENT) MUST BE CONCURRED

UPON BY THE GOVERNMENT PRIOR TO LAT RESUMPTION. AFTER RECEIPT OF A LAT

CONTINUATION DETERMINATION, THE GOVERNMENT HAS NO LESS THAN 2 BUSINESS DAYS

(NOT TO EXCEED 4 BUSINESS DAYS) TO REVIEW AND RESPOND WITH CONCURRENCE/NON-

CONCURRENCE OF THE DETERMINATION.

NOTE: IF A LOT IS PRESENTED FOR LAT WITH USG REPRESENTATION, THEN THAT LOT WILL

BE COUNTED TOWARD RELIABLITY AND A FRACAS REPORT WILL BE REQUIRED IN THE

EVENT OF A FAILURE REGARDLESS OF FUTURE DISPOSITION INTENTIONS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN ELECTRONICALLY

TRANSMITTED TO GOVERNMENT SERVER, CONTRACTOR HAS GIVEN NOTICE OF DELIVERY

TO THE GOVERNMENT, AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D016

2. TITLE OF DATA ITEM

QUALITY ASSURANCE PROGRAM PLAN

3. SUBTITLE

QAPP

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81794

5. CONTRACT REFERENCE

SOO Para, 2.11.5

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N /A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

BLKS 4: CONTRACTOR FORMAT IS AUTHORIZED PROVIDED THE

CONTENTS OF THE DID ARE MET.

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT. APPROVAL

DUE NO LATER THAN 30 DAYS AFTER RECEIP. RESUBMITTAL, IF

REQUIRED. IS DUE NO LATER THANK 30 CALENDAR DAYS AFTER RECEIPT

OF GOVERNMENT COMMENTS.

BLK 10, 12, 13: INITIAL SUBMITTAL DUE NO LATER 30 CALENDAR DAYS

AFTER CONTRACT AWARD. SUSEQUENT SUBMITTALS TO BE PROVIDED AS

THE QUALITY ASSURANCE PLAN IS UPDATED.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D017

2. TITLE OF DATA ITEM

QUALITY ASSESSMENT REPORT

3. SUBTITLE

QAR

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81187

5. CONTRACT REFERENCE

SOO Para, 2.11.6

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT IS AUTHORIZED PROVIDED THE CONTENTS

OF THE DID ARE MET.

BLK 8: GOVERNMENT APPROVAL REQUIRED FOR CONTENT. APPROVAL

DUE NO LATER THAN 30 DAYS AFTER RECEIPT. RESUBMITTAL, IF

REQUIRED, IS DUE NO LATER THAN 15 CALENDAR DAYS AFTER RECEIPT

OF GOVERNMENT COMMENTS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

file://egacq1/org$/02.04_FUZES%20-%20RESTRICTED/JPF/08%20-%20Contracting/08-19%20%20Follow-On%20JPF%20Contract%20Planning/RFP/EXHIBITS/Exhibit%20A/DIDs%20List/DI-SAFT-80931B.PDF

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D018

2. TITLE OF DATA ITEM

MANUFACTURING PLAN

3. SUBTITLE

MP

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81889

5. CONTRACT REFERENCE

SOO Para, 2.11

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

BLK 4: CONTRACTOR FORMAT AUTHORIZED PROVIDED THE CONTENTS

OF THE DID ARE MET.

BLK 8: GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

COMMENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO

INCORPORATE GOVERNMENT COMMENT AND RESUBMIT.

BLK 10, 12, 13: INITIAL SUBMITTAL DUE 90 CALENDAR DAYS AFTER

CONTRACT AWARD. SUBSEQUENT SUBMITTALS DUE AS REQUESTED

THEREAFTER.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

H. DATE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D019

2. TITLE OF DATA ITEM

CONFERENCE AGENDA/MINUTES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81249B/T; DI-ADMIN-81250B

5. CONTRACT REFERENCE

SOO Para, 2.2, 2.6, 2.11.1, 2.11.7

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

A

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: CONTRACTOR FORMAT IS AUTHORIZED PROVIDED THE CONTENTS

OF THE DID ARE MET

BLK 8: APPROVAL REQUIRED FOR FINAL SUBMISSION ONLY.

GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND

COMMENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO

INCORPORATE GOVERNMENT COMMENT AND RESUBMIT.

BLKS 10, 12, 13: DRAFT SUBMITTAL DUE NLT 15 BUSINESS DAYS AFTER

CLOSE OF SCHEDULED EVENT. MEETING MINUTES ARE REQUIRED FOR

ALL MEETINGS AS DEFINED IN THE CONTRACT. GOVERNMENT

COMMENTS DUE NO LATER THAN 5 BUSINESS DAYS AFTER RECEIPT.

FINAL SUBMITAL DUE NO LATER THAN 5 BUSINESS DAYS AFTER RECEIPT

OF GOVERNMENT COMMENTS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

H. DATE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D020

2. TITLE OF DATA ITEM

AMMUNITION DATA CARD

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80043B/T

5. CONTRACT REFERENCE

SOO Para, 2.11.8

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

AS REQ

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

AS REQ

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 4: SUBMIT ADCs FOR C-HOBS.

ADC’S SHALL BE PREPARED IAW MIL-STD-1168, THE STATEMENT OF WORK, AND THIS CDRL

BY ACCESSING THE WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP)

WHICK IS LOCATED ON THE ARMY ELECTRONIC PRODUCT SUPPORT (AEPS) WEBSITE AT

http://mhp.redstone.army.mil

HARD COPY ADCs PROVIDED WILL LOT SHIPMENTS SHALL BE GENERATED FROM THE WARP

PROGRAM AND ELECTRONICALLY SIGNED AND DATED BY THE DCMA QUALITY ASSURANCE

REPRESENTATIVE. COMPONENTS DETAILED ON THE ADC WILL BE DESIGNATED BY THE PCO.

A COPY OF THE DD1149 (INVOICE/SHIPPING DOCUMENT) SHALL BE UPLOADED TO THE

GOVERNMENT SERVER (SEE BLK 14)

BLK 7: DELIVER DD-250 WITH ONE COPY OF THE ADC. ANNOTATE THE DD-250 WITH LOT

NUMBER AND NOMENCLATURE AND WETHER FINAL SUBMITTAL OR ADDITIONAL

SUBMITTALS WILL BE MADE.

BLK 10, 12, 13: DELIVER CONCURRENT WITH DELIVERY OF EACH PRODUCTION LOT, EXCEPT

AS NOTED IN BLK 14 BELOW

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN ELECTRONICALLY

TRANSMITTED TO GOVERNMENT SERVER, CONTRACTOR HAS GIVEN NOTICE OF DELIVERY

TO THE GOVERNMENT, AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF

G. PREPARED BY

RONALD G SACCO II

http://mhp.redstone.army.mil/

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D021

2. TITLE OF DATA ITEM

AMMUNITION DEMILITARIZATION AND DISPOSITION

PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-81640

5. CONTRACT REFERENCE

SOO Para, 2.11.8

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE / R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

BLKS 10, 12, 13: INITIAL SUBMITTAL DUE 90 CALENDAR DAYS AFTER

CONTRACT AWARD. RESUBMITTAL, IF REQUIRED, IS DUE NLT 30 DAYS

AFTER RECEIPT OF GOVERNMENT COMMENTS.

BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

OTHER

D. SYSTEM/ITEM

C-HOBS

E. CONTRACT/PR NO.

D022

2. TITLE OF DATA ITEM

TEST PLANS

3. SUBTITLE

TPs

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A/T

5. CONTRACT REFERENCE

SOO Para, 3.3, 3.4, 3.5, 3.6

6. REQUIRING OFFICE

AFLCMC/EBHC

7. DD250 REQ

LT

9. DIST

STATEMENT

REQUIRED

N/A

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

BLK 3: SHALL INCLUDE LOT ACCEPTANCE TEST PLAN (LAT), FIRST

ARTICLE ACCEPTANCE TEST PLAN (FAAT) AND DESIGN QUALIFICATION

TEST PLAN.

BLK 4: DELETE PARAGRAPHS 4.3 AND 4.4 OF THE DID.

BLK 8: GOVERNMENT APPROVAL REQUIRED TO ENSURE COMPLETE AND

CORRECT CONTENT. APPROVAL DUE 15 DAYS AFTER RECEIPT.

RESUBMITTAL, IF REQUIRED, IS DUE 15 DAYS AFTER RECEIPT OF

GOVERNMENT COMMENTS.

BLKS 10, 12, 13: SUBMITTAL DUE 30 DAYS BEFORE START OF TEST. DRAFT

CHANGE PAGES ONLY REQUIRED IF CHANGES OCCUR. FINAL,

INCORPORATING GOVERNMENT COMMENTS DUE 30 DAYS AFTER

RECEIPT.

BLK 14: DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN

ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,

CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,

G. PREPARED BY

RONALD G SACCO II

H. DATE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .