Final_for_Draft_RFP_C-HOBS_Exhibit_B_B001-B010.pdf
PDF 799 KB Posted
- Attached to
- C-HOBS FA8213-18-R-3015 Federal contract opportunity
- Solicitation number
- FA8213-17-R-DSU33
About this file
This document package contains a draft request for proposal (RFP) for the C-HOBS federal contract opportunity. The RFP includes ten exhibits requiring contractors to provide technical data packages, software documentation, test plans, and product drawings for the C-HOBS system. Exhibit B lists the contract data requirements, including software specifications, design descriptions, development plans, test descriptions, reports, supply chain management plans, integration plans, and special inspection equipment drawings. Responses to the data items are due based on schedules provided in the exhibits, with government approval required for final submissions. The Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the requiring agency for the C-HOBS technical data and documentation.
Exhibit B CDRLS
View the file
Other files for this federal contract opportunity
Show all 50
C-HOBS FA8213-18-R-3015 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
CONTRACT ID: C-HOBS
CONTRACT NO. : FA8213-18-D-3046
SYSTEM ITEM: EXHIBIT B
SEQUENCE
NUMBER
DID/TITLE
PAGE
NO.
B001 DI-DRPR-81000E/T
PRODUCT DRAWINGS AND ASSOCIATED LISTS
B002 DI-IPSC-81441A
SOFTWARE PRODUCT SPECIFICATION
B003 DI-IPSC-81435A
SOFTWARE DESIGN DESCRIPTION (SDD)
B004 DI-IPSC-81427B
SOFTWARE DEVELOPMENT PLAN (SDP)
B005
DI-IPSC-81439A
SOFTWARE TEST DESCRIPTION (STD)
B006
B007
B008
DI-IPSC-81438A
SOFTWARE TEST PLAN (STP)
DI-IPSC-81440A
SOFTWARE TEST REPORT (STR)
DI-PSSS-81656B
SUPPY CHAIN MANAGEMENT PLAN (SCMP)
B009 DI-SESS-82044A
SYSTEM SOFTWARE INTEGRATION PLAN (SSIP)
B010 DI-SESS-81004E
SPECIAL INSPECTION EQUIPMENT (SIE)
DRAWING /MODELS AND ASSOCIATED LISTS
DRAFT
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
FA8213-D-18-3046
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
PRODUCT DRAWINGS AND ASSOCIATED LISTS
3. SUBTITLE
TECHNICAL DATA PACKAGE (TDP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000E/T
5. CONTRACT REFERENCE
SOO Para, 2.8, 3.3 and 3.9
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: MAINTAIN CURRENT FORMAT. TAILORED BY DD FORM 2554-1.
BLK 7: DD FORM 250 REQUIRED FOR FINAL SUBMITTAL ONLY.
BLK 8: APPROVAL REQUIRED FOR FINAL SUBMISSION ONLY.
BLK 10, 12, 13: DELIVER DIGITAL AND ONE FULL SIZE PAPER COPY OF ALL INITIAL
RELEASE DRAWINGS. DELIVER DIGITAL AND B SIZE (“11 x 17”) OF ALL OTHER
CHANGES. ECP CHANGES SHALL BE DELIVERED 30 DAYS AFTER ECP APPROVAL.
SUBMISSION OF EACH DRAWING REVISION. DIGITAL AND PAPER SUBMITTALS OF
CHANGES SHALL BE DELIVER EITHER 30 DAYS AFTER APPROVAL OR IN
CONJUNTION WITH THE SCHEDULED MONTHLY SUBMISSION WILL BE MADE PER
DISTRIBUTION LISTED IN BLOCK 14. IF NO CHANGE A LETTER WILL BE
SUBMITTED SO STATING. A FINAL DELIVERY SHALL BE PROVIDED AT END OF
CONTRACT IN IAW DIGITAL DATA REQUIREMENTS. DATA/INDEX LISTS ARE DUE
AT 3 MONTH INTERVALS. GOVERNMENT COMMENTS ARE DUE 30 DAYS
FOLLOWING RECEIPT OF THE SUBMITTAL. INCORPORATION OF GOVERNMENT
COMMENTS SHALL BE IN ACCORDANCE WITH DIRECTION PROVIDED BY THE PCO
LETTER. FINAL APPROVAL SHALL BE 30 DAYS FOLLOWING INCORPORATION OF
GOVERNMENT COMMENTS. DATA/INDEX LISTS ARE DUE QUARTERLY.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF
SUCCESSFUL TRANSMITTAL OF SAID DATA.
*AFLCMC/EBHC LT 1
DATA
15. TOTAL
G. PREPARED BY
RONALD G SACCO II
H. DATE
05-17-17
I. APPROVED BY
J. DATE
17. PRICE GROUP
18. ESTIMATED TOTAL PRICE
TDP OPTION SELECTION WORKSHEET
PRODUCT DRAWINGS AND ASSOCIATED LISTS
A. CONTRACT NO.
FA8213-18-D-3046
B. EXHIBIT/ATTACHMENT NO
C. CLIN.
D. CDRL DATA ITEM NO.
B001
1. DELIVERABLE PRODUCT (X and complete as applicable)
a. ORIGINALS (Drawing masters) (Identify specification, type, grade and class, etc.)
X
b. REPRODUCTIONS (Identify specification, type, grade and class, etc., and quantity of each)
Full-size paper, reproducible by xerographic means
X c. DIGITAL DATA (Identify specification, exchange media, etc.)
3D DIGITAL Models with Associated 2D Drawings are required. See Magnetic Media Requirements, Attachment 3 of the contract
2. CAGE AND DOCUMENT NUMBERS (X one)
a. CONTRACTOR
X b. GOVERNMENT (Complete (1) and (2) and (3)) CAGE Code 98747
Use Document Numbers 201718019 - 20178518
To Be Assigned By:
AFLCMC/EBHC
3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)
a. CONTRACTOR FORMATS. Forms to be supplied by contractor.
b. GOVERNMENT FORMATS. Forms to be supplied by Government
c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)
4. TYPES AND QUANTITY OF DRAWINGS SELECTION (X one)
X a. CONTRACTOR SELECTS b. GOVERNMENT SELECTS (Specify in item 9)
5. ASSOCIATED LISTS (X and complete as applicable)
X a. PARTS LIST (X one) X (1)Integral (2) Separate
X
b. DATA LIST (X one) (1) Not Required X
(2) Required at CLIN Level
X c. INDEX LIST (X one) (1) Not Required X
(2) Required (Specify levels of assembly) at System Level
d. WIRE LIST (X one) X (1) Not Required
(2) Required (Specify levels of assembly)
E. INDENTURED DATA
LIST
X
(1) Not Required
(2) Required
F. APPLICATION LISTS
6. DETAILS (X one)
a. MULTIDETAIL DRAWINGS PERMITTED X b. MONODETAIL DRAWINGS MANDATORY
7. VENDOR SUBSTANTIATION DATA (X one)
a. NOT REQUIRED b. REQUIRED
8. APPLICABILITY OF STANDARDS (X one)
X
a. ASME Y14.100M, Engineering Drawing Practices (Commercial) B. X
C. X D. X E. X
b. ASME Y14.100, WITH APPENDICES
B, C, D, E X
c. ASME Y14.34M, Associated Lists
d. Existing Standards Do Not Apply
9. OTHER TAILORING (Attach additional sheets as necessary)
DD Form 2554-5, June 2000
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
FA8213-18-D-3046
B002
2. TITLE OF DATA ITEM
SOFTWARE PRODUCT SPECIFICATION
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
SOO Para, 2.2.2
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLK 8: GOVERNMENT APPROVAL REQUIRED AS PRODUCT BASELINE.
GOVERNMENT APPROVAL DUE 45 DAYS AFTER RECEIPT. RESUBMITTAL ,
IF REQUIRED, DUE 30 DAYS AFTER RECIEPT OF GOVERNMENT
COMMENTS.
BLKS 10, 12, 13, 14: SUBMIT 45 DAYS AFTER CONTRACTOR DEMONSTRATES
VERIFICATION OF CSCI.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
G. PREPARED BY
RONALD G SACCO II
H. DATE
file://arsw10/DA_DATA$/FUZE/JPF/Follow-on%20JPF%20Contract%20Planning/Draft%20RFP%20Docs/Exhibit%20B/DIDs%20List/DI-IPSC-81433A.PDF
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B003
2. TITLE OF DATA ITEM
SOFTWARE DESIGN DESCRIPTION
3. SUBTITLE
SDD
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81435A
5. CONTRACT REFERENCE
SOO Para, 2.2.3
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLK8: GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF SRS REQUIREMENTS. GOVERNMENT APPROVAL DUE
45 DAYS AFTER RECEIPT.
BLK 10,12,13, 14: SUBMIT SECTIONS 1,2, AND 4, 45 DAYS PRIOR TO
ESTABLISHMENT OF DESIGN BASELINE. SUBMENT ENTIRE DOCUMENT 60
DAYS PRIOR TO CSCI TESTING.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B004
2. TITLE OF DATA ITEM
SOFTWARE DEVELOPMENT PLAN
3. SUBTITLE
SDP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427B
5. CONTRACT REFERENCE
SOO Para, 2.2.2
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLK 8: GOVERNMENT APPROVAL REQUIRED. GOVERNMENT APPROVAL
DUE 45 DAYS AFTER RECEIPT.
BLKS 10, 12, 13, 14: SUBMIT 60 DAYS AFTER CONTRACTOR AWARD. THE
GOVERNMENT WILL HAVE 45 DAYS TO REVIEW AND COMMENT.
RESUBMITTAL , IF REQUIRED, DUE 30 DAYS AFTER RECIEPT OF
GOVERNMENT COMMENTS.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B005
2. TITLE OF DATA ITEM
SOFTWARE TEST DESCRIPTION
3. SUBTITLE
STD
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81439A
5. CONTRACT REFERENCE
SOO Para, 2.2.3
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLK8: GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF SRS REQUIREMENTS. GOVERNMENT APPROVAL DUE
45 DAYS AFTER RECEIPT.
BLK 10,12,13, 14: SUBMIT ENTIRE DOCUMENT 45 DAYS PRIOR TO CSCI
TESTING, CHANGE PAGES ONLY REQUIRED IF CHANGES OCCUR. FINAL
CHANGES PAGES DUE 30 DAYS AFTER COMPLETION OF CSCI TESTING.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
FA5213-D-18-3046
B006
2. TITLE OF DATA ITEM
SOFTWARE TEST PLAN
3. SUBTITLE
STP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81438A
5. CONTRACT REFERENCE
SOO Para, 2.2.3
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK4: CONTRACTOR FORMAT ACCEPTABLE.
BLK8: GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF SRS REQUIREMENTS. GOVERNMENT APPROVAL DUE
45 DAYS AFTER RECEIPT.
BLK 10,12,13: SUBMIT PLAN 45 DAYS PRIOR TO ESTABLISHMENT OF
INITIAL DESIGN. UPDATE FOR MAJOR CHANGES, MAY BE CHANGE PAGES.
ONLY REQUIRED IF CHANGES OCCUR.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF
SUCCESSFUL TRANSMITTAL OF SAID DATA
G. PREPARED BY
RONALD G SACCO II
18. PRICE GROUP
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B007
2. TITLE OF DATA ITEM
SOFTWARE TEST REPORT
3. SUBTITLE
STR
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81440A
5. CONTRACT REFERENCE
SOO Para, 2.2.3
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK4: CONTRACTOR FORMAT ACCEPTABLE.
BLK3: SHALL INCLUDE ALL SOFTWARE NEEDED FOR THE C-HOBS SYSTEM
FUNCTIONS.
BLK8: GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF THE TEST REPORT. GOVERNMENT APPROVAL DUE 45
DAYS AFTER RECEIPT.
BLK 10,12,13: SUBMIT REPORT 30 DAYS AFTER COMPLETION OF TESTING.
UPDATE FOR BOTH MAJOR/ MINOR CHANGES.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF
SUCCESSFUL TRANSMITTAL OF SAID DATA
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B008
2. TITLE OF DATA ITEM
SUPPLY CHAIN MANAGEMENT PLAN
3. SUBTITLE
SCMP
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81656A
5. CONTRACT REFERENCE
SOO Para, 2.11.2
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK8. GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF SUPPORTABILITY REQUIREMENTS AND SUPPY CHAIN
RISKS TO THE GOVERNMENT. GOVERNMENT APPROVAL DUE 30 DAYS
AFTER RECEIPT.
BLK 10,12,13: SUBMIT INITIAL PLAN (BOM) 30 DAYS AFTHER CONTRACT
AWARD. SUBSEQUENT SUBMISSIONS ON THE 25TH MONTHLY THERE
AFTER UPDATE FOR BOTH MAJOR/ MINOR CHANGES.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF
SUCCESSFUL TRANSMITTAL OF SAID DATA
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B009
2. TITLE OF DATA ITEM
SYSTEM SOFTWARE INTEGRATION PLAN
3. SUBTITLE
SSIP
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-82044A
5. CONTRACT REFERENCE
SOO Para, 2.2.3 and 2.2.6
6. REQUIRING OFFICE
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK8: GOVERNMENT APPROVAL REQUIRED TO ENSUREE ADEQUATE
VERIFICATION OF INTEGRATION REQUIREMENTS AND RISKS TO THE C-
HOBS SYSTEM. GOVERNMENT APPROVAL DUE 30 DAYS AFTER RECEIPT.
BLK 10,12,13: SUBMIT INITIAL PLAN DUE 45 DAYS AFTHER CONTRACT
AWARD. SUBSEQUENT SUBMISSIONS DUE AS REQUIRED. UPDATE FOR
BOTH MAJOR/ MINOR CHANGES FOR BOTH HARDWARE AND SOFTWARE.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
AND THE GOVERNMENT HAS GIVEN NOTICE TO CONTRACTOR OF
SUCCESSFUL TRANSMITTAL OF SAID DATA
G. PREPARED BY
RONALD G SACCO II
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
TDP
D. SYSTEM/ITEM
C-HOBS
E. CONTRACT/PR NO.
B010
2. TITLE OF DATA ITEM
SPECIAL INSPECTION EQUIPMENT (SIE) PRODUCT
DRAWINGS AND ASSOCIATED LISTS
3. SUBTITLE
SIE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81004E/T
5. CONTRACT REFERENCE
SOO Para, 3.9
6. REQUIRING OFFICE
AFLCMC/EBHC
7. DD250 REQ
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLK 16
a. ADDRESSEE Draft Final
Reg Repro
16. REMARKS
BLK 4: MAINTAIN CURRENT FORMAT. TAILORED BY DD FORM 2554-1.
BLK 7: DD FORM 250 REQUIRED FOR FINAL SUBMITTAL ONLY.
BLK 8: APPROVAL REQUIRED FOR FINAL SUBMISSION ONLY.
BLK 10, 12, 13: DELIVER DIGITAL AND ONE FULL SIZE PAPER COPY OF ALL INITIAL
RELEASE DRAWINGS. DELIVER DIGITAL AND B SIZE (“11 x 17”) OF ALL OTHER
CHANGES. ECP CHANGES SHALL BE DELIVERED 30 DAYS AFTER ECP APPROVAL.
SUBMISSION OF EACH DRAWING REVISION. DIGITAL AND PAPER SUBMITTALS OF
CHANGES SHALL BE DELIVER EITHER 30 DAYS AFTER APPROVAL OR IN
CONJUNTION WITH THE SCHEDULED MONTHLY SUBMISSION WILL BE MADE PER
DISTRIBUTION LISTED IN BLOCK 14. IF NO CHANGE A LETTER WILL BE
SUBMITTED SO STATING. A FINAL DELIVERY SHALL BE PROVIDED AT END OF
CONTRACT IN IAW DIGITAL DATA REQUIREMENTS. DATA/INDEX LISTS ARE DUE
AT 3 MONTH INTERVALS. GOVERNMENT COMMENTS ARE DUE 30 DAYS
FOLLOWING RECEIPT OF THE SUBMITTAL. INCORPORATION OF GOVERNMENT
COMMENTS SHALL BE IN ACCORDANCE WITH DIRECTION PROVIDED BY THE PCO
LETTER. FINAL APPROVAL SHALL BE 30 DAYS FOLLOWING INCORPORATION OF
GOVERNMENT COMMENTS. DATA/INDEX LISTS ARE DUE QUARTERLY.
BLK 14: *DATA ITEMS ARE DEEMED TO BE DELIVERED WHEN
ELECTRONICALLY TRANSMITTED TO GOVERNMENT SERVER,
CONTRACTOR HAS GIVEN NOTICE OF DELIVERY TO THE GOVERNMENT,
G. PREPARED BY
RONALD G SACCO II
H. DATE
TDP OPTION SELECTION WORKSHEET
SPECIAL INSPECTION EQUIPMENT (SIE) PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS
D. CONTRACT NO.
FA8213-18-D-3046
E. EXHIBIT/ATTACHMENT NO
F. CLIN.
D. CDRL DATA ITEM NO.
B010
1. DELIVERABLE PRODUCT (X and complete as applicable)
a. ORIGINALS (Drawing masters) (Identify specification, type, grade and class, etc.)
b. REPRODUCTIONS (Identify specification, type, grade and class, etc., and quantity of each)
Full-size paper, reproducible by xerographic means
X c. DIGITAL DATA (Identify specification, exchange media, etc.)
3D DIGITAL Models with Associated 2D Drawings are required. See Magnetic Media Requirements, Attachment 3 of the contract
2. CAGE AND DOCUMENT NUMBERS (X one)
a. CONTRACTOR
X b. GOVERNMENT (Complete (1) and (2) and (3)) CAGE Code 98747
Use Document Numbers 20178019 - 20178518
To Be Assigned By:
3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)
a. CONTRACTOR FORMATS. Forms to be supplied by contractor.
b. GOVERNMENT FORMATS. Forms to be supplied by Government
c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)
4. TYPES AND QUANTITY OF DRAWINGS SELECTION (X one)
X a. CONTRACTOR SELECTS b. GOVERNMENT SELECTS (Specify in item 9)
5. ASSOCIATED LISTS (X and complete as applicable)
X a. PARTS LIST (X one) X (1)Integral (2) Separate
X
b. DATA LIST (X one) (1) Not Required X
(2) Required at CLIN Level
X c. INDEX LIST (X one) (1) Not Required X
(2) Required (Specify levels of assembly) at System Level
d. WIRE LIST (X one) X (1) Not Required
E. INDENTURED DATA
LIST
X
(2) Required
F. APPLICATION LISTS
6. DETAILS (X one)
a. MULTIDETAIL DRAWINGS PERMITTED X b. MONODETAIL DRAWINGS MANDATORY
7. VENDOR SUBSTANTIATION DATA (X one)
a. NOT REQUIRED b. REQUIRED
8. APPLICABILITY OF STANDARDS (X one)
X
a. ASME Y14.100M, Engineering Drawing Practices (Commercial) B. X
C. X D. X E. X
b. ASME Y14.100, WITH APPENDICES
B, C, D, E X
c. ASME Y14.34M, Associated Lists
d. Existing Standards Do Not Apply
10. OTHER TAILORING (Attach additional sheets as necessary)
| Form Approved |
| C. CATEGORY |
| N/A |
| B. EXHIBIT |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| TDP OPTION SELECTION WORKSHEET |
| PRODUCT DRAWINGS AND ASSOCIATED LISTS |
| B. EXHIBIT/ATTACHMENT NO |
| C. CLIN. |
| X |
| X |
| 3D DIGITAL Models with Associated 2D Drawings are required. See Magnetic Media Requirements, Attachment 3 of the contract |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| B. X |
| X |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| X |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 18. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| N/A |
| Draft |
| G. PREPARED BY |
| 17. PRICE GROUP |
| TDP OPTION SELECTION WORKSHEET |
| SPECIAL INSPECTION EQUIPMENT (SIE) PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS |
| E. EXHIBIT/ATTACHMENT NO |
| F. CLIN. |
| X |
| X |
| 3D DIGITAL Models with Associated 2D Drawings are required. See Magnetic Media Requirements, Attachment 3 of the contract |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| B. X |
| X |
X
File details come from the government source that posted it. Updated .