Industry_Day_Q_and_A_DSU_33_v2_PDF.pdf

PDF 75 KB Posted

Attached to
C-HOBS FA8213-18-R-3015 Federal contract opportunity
Solicitation number
FA8213-17-R-DSU33
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains questions and answers from an industry day event regarding a forthcoming solicitation for the DSU-33X/X sensor. Key details include that the solicitation will be released by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base for a new terrain mapping and height-of-burst sensor compatible with current DSU-33 munitions and the JDAM kit. The sensor must maintain external dimensions and weight as previous versions while allowing innovation. Threshold requirements include improved height-of-burst terrain mapping capability and tolerance above 50 feet, with selectability. Qualification testing, flight testing, and anti-tamper measures will be required. Responses to the industry day questions provide additional technical requirements and test plans.

View the file

Other files for this federal contract opportunity

Other files attached to C-HOBS FA8213-18-R-3015, newest first.
File Type Posted
Exhibit_A_through_M_Updated_CDRLs_02-22-18.pdf PDF
CRM_C-HOBS_26_Feb_2018.xlsx XLSX spreadsheet
FA821318R3015.pdf PDF
CRM_C-HOBS_14_Feb_2018.xlsx XLSX spreadsheet
CDRL_04_DAL_updated_w-CSOW_signed.pdf PDF
ppi_tool.accdb MDB file
CRM_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
Total_Evaluated_Price_C-HOBS_6_Feb_2018.xlsx XLSX spreadsheet
CRM_C-HOBS_25_Jan_2018.XLSX XLSX spreadsheet
CRM_C-HOBS.XLSX XLSX spreadsheet
CHOBS_Statement_of_Objectives__1-11-18.docx DOCX document
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_17_Jan_2018.docx DOCX document
Section_M_-_17_Jan_2018.docx DOCX document
Attachment_7_Incremental_Spares_17_Jan_2018.xlsx XLSX spreadsheet
Exhibit_A_through_M_CDRLS_Updated_--32.pdf PDF
Total_Evaluated_Price_C-HOBS_Appendix_3_of_Section_L_Amend_1.xlsx XLSX spreadsheet
Exhibit_N_C-HOBS_Digital_Data_Requirmeents_and_CDRL_Supp_Instructions_Amend_1.pdf PDF
CHOBS_Section_L_17_Jan_2018.docx DOCX document
Exhibit_A_through_M_CDRLS.pdf PDF
Exhibit_N_-_C-HOBS_Digital_Data_Requirements_and_CDRL_Supp_Instructions.pdf PDF
Attachment_2_Rights_to_Data.pdf PDF
BOE_Summary_Appendix_IV_to_Section_L_Final.xlsx XLSX spreadsheet
Total_Evaluated_Price_(TEP)_Appendix_III_to_Section_L_Final.xlsx XLSX spreadsheet
Attachment_4_DD_254.pdf PDF
Attachment_3_Ordering_Procedures.pdf PDF
Section_M_-_Final.pdf PDF
Attachment_7_Incremental_Spares.xlsx XLSX spreadsheet
Signed_Solicitation_DD254.pdf PDF
M548_Container_Drawings.pdf PDF
FA821317R3046_Model_Contract_DRAFT_v1.pdf PDF
REEF_Floor_Plan.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_A-A001-A034.pdf PDF
CHOBS_Statement_of_Objectives_DRAFT,_v6,_05-31-17.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Final_for_Draft_RFP_C-HOBS_Exhibit_C_C001.pdf PDF
Section_M_-_Trade_Off_Working_File_v17_30_May_2017.pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Draft,_C-HOBS_Attachment_2_RIGHTS_IN_DATA_v11,_05-31-17.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_B_B001-B010.pdf PDF
REEF-Map_to.pdf PDF
ATTACHMENT_3_-_Pricing_Matrix_and_Ordering_Procedures_v3.pdf PDF
CHOBS_Section_L_V7.pdf PDF
Industry_Day_2_Agenda.pptx PPTX presentation
C-HOBS_Digital_Data_Rqmts_and_CDRL_Supp_Instructions_Exhibit_E.pdf PDF
Final_for_Draft_RFP_C-HOBS_Exhibit_D_D001-D029.pdf PDF
Sources_Sought_22_September_2016.pdf PDF
Industry_Day_Question_Request_Form.doc DOC document
Close_up_Map_to_Base_Chapel.pdf PDF
RFI_7_July_2016.docx DOCX document
Industry_Day_Annoucement_7_July_2016.docx DOCX document
Show all 50

C-HOBS FA8213-18-R-3015 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Question Answer Posted to FBO on

1 8/17/2016 Why is CMBRE connectivity required for the DSU-33X/X? To obtain sensor status information. 9/1/2016

2 8/17/2016 Will the sensor be backward compatible to the DSU-33D/B?

Yes. The DSU-33X/X must fit all current DSU-33D/B compatible munitions.

9/1/2016

3 8/17/2016 Is there a specific RS422 pin-out? Yes, but it is not finalized. 9/1/2016

4 8/17/2016 How will the DSU-33X/X connect to the JDAM Kit?

Reference DSU-38 for baseline. Innovation is encouraged.

9/1/2016

5 8/17/2016 Is there a message generated by the JDAM kit telling the sensor/fuze to height-of-burst

(HOB)?

No. 9/1/2016

6 8/17/2016 Are there any parts that need to remain common to previous versions?

Internally no. The external form and FZU cable must remain the same. Weight should be kept as close as possible to previous versions.

9/1/2016

7 8/17/2016 Are ROHS COTS parts allowed in the sensor?

Yes. However, all parts must meet current MIL- STDs.

9/1/2016

8 8/17/2016 Will there be power provided by the platform? Yes. 9/1/2016 9 8/17/2016 Is a battery still required? Yes. 9/1/2016

10 8/17/2016 Is accepting the HOB setting at weapon release/battery initiation acceptable? Yes. 9/1/2016

11 8/17/2016 Does the Next-Generation Area Attack Weapon have a height-of-burst need above 50 feet?

Yes. 9/1/2016

12 8/17/2016 What is driving the height-of-burst requirement?

The Air Force Research Lab at Eglin Air Force Base is interested in height-of-burst functions beyond the capability of currently fielded sensors.

9/1/2016

13 8/17/2016 What are the top three threshold priorities?

HOB terrain-mapping> HOB tolerance> selectability.

9/1/2016

14 8/17/2016 Are there subject matter experts within the USG that can provide information on current or past similar efforts?

Yes. 9/1/2016

15 8/17/2016 What is wanted for terrain-mapping?

The ability to distinguish between obstacles (trees, roof tops, etc…) and true ground.

9/1/2016

16 8/17/2016 Is there a preference for 1 foot or 1 meter accuracy? To be determined. Cost is a factor. 9/1/2016

17 8/17/2016 Is +/- 3 feet performance tolerance the threshold?

Performance should be similar to previous sensor versions.

9/1/2016

18 8/17/2016 Will classified documents be made available for review?

The appropriate classified materials will be made available to those who are cleared to receive classified docs no later than RFP release.

9/1/2016

19 8/17/2016 If the DSU-33X/X is more capable, will it be used in other applications? Yes, there is potential for wider application. 9/1/2016 20 8/17/2016 What platform will be used for the initial OFP? F-15E. 9/1/2016 21 8/17/2016 Is the contractor responsible for the integration portion? Yes. 9/1/2016 22 8/17/2016 Will there be DCS or FMS? Yes. 9/1/2016 23 8/17/2016 Does the USG own any of the tooling? No. 9/1/2016

DSU-33 Industry Day Questions & Answers

Date Question Answer Posted to FBO on 24 8/17/2016 Is the Navy involved in this effort? Navy has not yet expressed interest. 9/1/2016

25 8/17/2016 How is the funding for qualification and flight testing going to be handled?

Qualification testing will be priced by the contractor as part of the effort. Flight testing will be handled by the USG with contractor support.

9/1/2016

26 8/17/2016 How difficult is the flight test-scheduling process?

The scheduling itself is not challenging. However, there are many factors that impact actual test execution (range availability, weather, priority changes, etc…).

9/1/2016

27 8/17/2016 Is this effort POM'd? Yes. 9/1/2016

28 8/17/2016 How is this effort funded?

This effort will be funded predominately with 3011 (production) funds.

9/1/2016

29 8/17/2016 Are there any funds available prior to contract award? No. 9/1/2016

30 8/17/2016 Is there a unit price goal?

Unit price will be part of the Total Evaluated Price and will be evaluated as part of the cost/price evaluation factor.

9/1/2016

31 8/17/2016 What are the DSU team's thoughts on anti-tamper measures?

Fully aware that anti-tamper measures are challenging and can be costly. RFP will outline requirements.

9/1/2016

32 8/17/2016 Will first article and qualification testing be combined or separate?

Most likely they can be combined. Qualification testing is to prove product works. First article testing test products coming off the production line.

9/1/2016

33 8/17/2016 Will there be LAT? Yes. 9/1/2016 34 8/17/2016 Are there any specific facility requirements for LAT? No. 9/1/2016

35 8/17/2016 When will the ICD be made available?

ICD will be made available no later than RFP release.