Cameron Creole Freshwater Introduction Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12FPC219B0003
- Agency
- Farm Production and Conservation Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- 1st) Cameron Prairie National Wildlife Refuge Center, Bell City, LA 70630 2nd) Old Ferry Rd Creole, LA 70632 Cameron and Calcasieu parishes La Usa
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Amendment to change bid due date from 7/10/19 to 7/18/19.
Amendment 5 to change bid due date from 7/18/19 to 7/25/19.
Amendment 6 to change BID OPENING date and provide Q&A.
Amendment 7 to change Bid Due date from 7/25/19 to 7/29/19.
Update #4 ·
Amendment to change bid due date from 7/10/19 to 7/18/19.
Amendment 5 to change bid due date from 7/18/19 to 7/25/19.
Amendment 6 to change BID OPENING date and provide Q&A.
Update #3 ·
Amendment to change bid due date from 7/10/19 to 7/18/19.
Amendment 5 to change bid due date from 7/18/19 to 7/25/19.
Update #2 ·
Amendment to change bid due date from 7/10/19 to 7/18/19.
Update #1 ·
The USDA-Natural Resources Conservation Service (NRCS) -through the Acquisition and Procurement Division Farm Production and Conservation located in Lafayette, LA is issuing this solicitation under the Sealed Bid procedures in FAR Part 14 for the Cameron-Creole Freshwater Introduction Project (herein referred to as CS-49) located at the eastern boundary of the Calcasieu-Sabine Basin. The NRCS anticipates awarding a firm fixed price contract for these services. This is a Total Small Business Set Aside under NAICS Code 237990, and the Small Business Administration (SBA) size standard is $36.5 Million. In order to comply with the Debt Collection Improvement Act of 1996, all contractors must be registered in the System for Award Management System (SAMS) to be considered for an award of a Federal contract. For information regarding registration contact the SAMS Web Site at https://www.sam.gov/portal/public/SAM/. The strategy for the CS-49 project is to restore the function, value, and sustainability of the Cameron-Creole Watershed by introducing fresh water from the GIWW into the marsh and by preventing coalescence of the Cameron-Creole Watershed into Mermentau Basin. This project is authorized by the Coastal Wetlands, Planning, Protection and Restoration Act (CWPPRA) which funds construction of coastal wetland restoration projects in Louisiana. This project consists of round timber piling, steel sheet piling, slide and flap gates. This will also consist of an estimated 6,233 tons of rock riprap and 36,262 sy of geotextile. Other activities associated with this construction shall include contractor quality control, construction surveys, excavation for flotation access, placement of permanent warning signs, settlement plates and warning buoys. The magnitude of this project is more than $10,000,000. All work shall be completed within 548 calendar days from the issuance of the Notice to Proceed. The site showing will be held on 18 JUN 19 at 10:00 am local time. See section L of the solicitation for site showing instructions.
Attachments
| File | Type | Posted |
|---|---|---|
| Copy_of_Abstract_12-FPC2-19-B-0003.xls | XLS spreadsheet | |
| Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| Amendment_6.pdf | ||
| Amend0006_QA.pdf | ||
| Amendment_5.pdf | ||
| Amendment_0004_Addendum.pdf | ||
| CS-49_Amend_4_QAs_revised.pdf | ||
| CS-49_-_Amendment_4_-_Specifications.pdf | ||
| CS-49_-_Amendment_4_-_Drawings.pdf | ||
| Amendment_0004.pdf | ||
| LA-428-53A2_(SIGNED).pdf | ||
| CS_49_Amendment_0003.pdf | ||
| CS_49_Amendment_0002.pdf | ||
| CS-49_Site_Showing_Sign_In.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey_Report.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey.pdf | ||
| CS-49_Bid_Schedule_Current.pdf | ||
| CS-49_SiteShow_Questions__Answers_6-18-19.docx | DOCX document | |
| CS_49_Amendment_1.pdf | ||
| Cameron_Creole_Site_Showing_Minutes.docx | DOCX document | |
| CS-49_Final_Stamped_Specification.pdf | ||
| CS-49_Solicitation.pdf | ||
| Wage_Rates.pdf | ||
| CS-49_Final_Stamped_Construction_Drawings.pdf |
Show all 25
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cameron Creole Freshwater Introduction Project | Award Notice | |
| Cameron Creole Freshwater Introduction Project | Solicitation | |
| Cameron-Creole Freshwater Introduction Project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity