Amend0006_QA.pdf
PDF 130 KB Posted
- Attached to
- Cameron Creole Freshwater Introduction Project Federal contract opportunity
- Solicitation number
- 12FPC219B0003
About this file
Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_Abstract_12-FPC2-19-B-0003.xls | XLS spreadsheet | |
| Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| Amendment_6.pdf | ||
| Amendment_5.pdf | ||
| Amendment_0004_Addendum.pdf | ||
| Amendment_0004.pdf | ||
| CS-49_Amend_4_QAs_revised.pdf | ||
| CS-49_-_Amendment_4_-_Specifications.pdf | ||
| CS-49_-_Amendment_4_-_Drawings.pdf | ||
| LA-428-53A2_(SIGNED).pdf | ||
| CS_49_Amendment_0003.pdf | ||
| CS_49_Amendment_0002.pdf | ||
| CS-49_Site_Showing_Sign_In.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey_Report.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey.pdf | ||
| CS-49_Bid_Schedule_Current.pdf | ||
| CS_49_Amendment_1.pdf | ||
| Cameron_Creole_Site_Showing_Minutes.docx | DOCX document | |
| CS-49_SiteShow_Questions__Answers_6-18-19.docx | DOCX document | |
| CS-49_Solicitation.pdf | ||
| CS-49_Final_Stamped_Construction_Drawings.pdf | ||
| Wage_Rates.pdf | ||
| CS-49_Final_Stamped_Specification.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: Reference the Amendment 4 Q&A regarding acceptable terrace material. What is the maximum organic content for the material to be placed at terraces?
NRCS Answer: Although there is no maximum organic content specified in the drawings or specifications, the contractor is referred to Construction Specification 23, Earthfill under Section 2, Material, which states:
“All fill material shall be obtained from required excavations and designated borrow areas. The selection, blending, routing, and disposition of material in the various fills shall be subject to approval by the engineer.
Fill materials shall contain no frozen soil, sod, brush, roots, or other perishable material.
Rock particles larger than the maximum size specified for each type of fill shall be removed prior to compaction of the fill.
The types of material used in the various fills shall be as listed and described in the specifications and drawings.”
Question: DWG sheet 21 shows gaps in the borrow canals. Please clarify if the borrow canals for the terrace work can be contiguous for movement of equipment, vegetation debris, material, etc. between terraces within the work limits.
NRCS Answer: The borrow canals for the terrace work can be contiguous.