CS-49_SiteShow_Questions__Answers_6-18-19.docx
DOCX document 13 KB Posted
- Attached to
- Cameron Creole Freshwater Introduction Project Federal contract opportunity
- Solicitation number
- 12FPC219B0003
About this file
Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_Abstract_12-FPC2-19-B-0003.xls | XLS spreadsheet | |
| Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| Amendment_6.pdf | ||
| Amend0006_QA.pdf | ||
| Amendment_5.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0004_Addendum.pdf | ||
| CS-49_Amend_4_QAs_revised.pdf | ||
| CS-49_-_Amendment_4_-_Specifications.pdf | ||
| CS-49_-_Amendment_4_-_Drawings.pdf | ||
| LA-428-53A2_(SIGNED).pdf | ||
| CS_49_Amendment_0003.pdf | ||
| CS_49_Amendment_0002.pdf | ||
| CS_49_Amendment_1.pdf | ||
| Cameron_Creole_Site_Showing_Minutes.docx | DOCX document | |
| CS-49_Site_Showing_Sign_In.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey_Report.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey.pdf | ||
| CS-49_Bid_Schedule_Current.pdf | ||
| CS-49_Final_Stamped_Construction_Drawings.pdf | ||
| CS-49_Final_Stamped_Specification.pdf | ||
| CS-49_Solicitation.pdf | ||
| Wage_Rates.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS-49 6-18-19
Question: How will NRCS pay for terraces?
Answer: NRCS’ response was terraces will be paid by progress surveys taken by the contractor that are submitted & approved by NRCS. I could be 10-20 terraces however many get approved.
Question: Can the contractor stop building terraces if the water gets too high?
Answer: NRCS will decide when the contractor brings it up at the progress meetings.
Question: Is there a site available to look at historical water data?
Answer: NRCS said we can provide that if a contractor submits an RFI requesting it. NRCS then provided the CRMS Station 0650 which is near the site.
Question: What is the current water depth?
Answer: NRCS response was +2.7’
Question: What do we do when we clear the trees & can we leave the trees at the 3.5 tolerance?
Answer: Refer to the spec where it says all debris must be covered.
Question: Was there a stake on the structure centerline & the intake complex?
Answer: Yes, there is a doubled pink flag that intersects both the structure centerline & the intake complex.
Question: Will NRCS allow contractor to dig deeper than -10 for terrace construction since suitable material may not be found in the top soil layers?
Answer: The COE permit would need to be modified, but since there are two borrow areas per terrace, there should be enough suitable material to construct the terraces.