CS-49_SiteShow_Questions__Answers_6-18-19.docx

DOCX document 13 KB Posted

Attached to
Cameron Creole Freshwater Introduction Project Federal contract opportunity
Solicitation number
12FPC219B0003
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

Q&A

View the file

Other files for this federal contract opportunity

Other files attached to Cameron Creole Freshwater Introduction Project, newest first.
File Type Posted
Copy_of_Abstract_12-FPC2-19-B-0003.xls XLS spreadsheet
Amendment_7.pdf PDF
Amendment_7.pdf PDF
Amendment_6.pdf PDF
Amend0006_QA.pdf PDF
Amendment_5.pdf PDF
Amendment_0004.pdf PDF
Amendment_0004_Addendum.pdf PDF
CS-49_Amend_4_QAs_revised.pdf PDF
CS-49_-_Amendment_4_-_Specifications.pdf PDF
CS-49_-_Amendment_4_-_Drawings.pdf PDF
LA-428-53A2_(SIGNED).pdf PDF
CS_49_Amendment_0003.pdf PDF
CS_49_Amendment_0002.pdf PDF
CS_49_Amendment_1.pdf PDF
Cameron_Creole_Site_Showing_Minutes.docx DOCX document
CS-49_Site_Showing_Sign_In.pdf PDF
Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey_Report.pdf PDF
Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey.pdf PDF
CS-49_Bid_Schedule_Current.pdf PDF
CS-49_Final_Stamped_Construction_Drawings.pdf PDF
CS-49_Final_Stamped_Specification.pdf PDF
CS-49_Solicitation.pdf PDF
Wage_Rates.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CS-49 6-18-19

Question: How will NRCS pay for terraces?

Answer: NRCS’ response was terraces will be paid by progress surveys taken by the contractor that are submitted & approved by NRCS. I could be 10-20 terraces however many get approved.

Question: Can the contractor stop building terraces if the water gets too high?

Answer: NRCS will decide when the contractor brings it up at the progress meetings.

Question: Is there a site available to look at historical water data?

Answer: NRCS said we can provide that if a contractor submits an RFI requesting it. NRCS then provided the CRMS Station 0650 which is near the site.

Question: What is the current water depth?

Answer: NRCS response was +2.7’

Question: What do we do when we clear the trees & can we leave the trees at the 3.5 tolerance?

Answer: Refer to the spec where it says all debris must be covered.

Question: Was there a stake on the structure centerline & the intake complex?

Answer: Yes, there is a doubled pink flag that intersects both the structure centerline & the intake complex.

Question: Will NRCS allow contractor to dig deeper than -10 for terrace construction since suitable material may not be found in the top soil layers?

Answer: The COE permit would need to be modified, but since there are two borrow areas per terrace, there should be enough suitable material to construct the terraces.