Copy_of_Abstract_12-FPC2-19-B-0003.xls
XLS spreadsheet 80 KB Posted
- Attached to
- Cameron Creole Freshwater Introduction Project Federal contract opportunity
- Solicitation number
- 12FPC219B0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| Amendment_6.pdf | ||
| Amend0006_QA.pdf | ||
| Amendment_5.pdf | ||
| Amendment_0004.pdf | ||
| CS-49_Amend_4_QAs_revised.pdf | ||
| CS-49_-_Amendment_4_-_Specifications.pdf | ||
| CS-49_-_Amendment_4_-_Drawings.pdf | ||
| Amendment_0004_Addendum.pdf | ||
| LA-428-53A2_(SIGNED).pdf | ||
| CS_49_Amendment_0003.pdf | ||
| CS_49_Amendment_0002.pdf | ||
| CS_49_Amendment_1.pdf | ||
| Cameron_Creole_Site_Showing_Minutes.docx | DOCX document | |
| CS-49_SiteShow_Questions__Answers_6-18-19.docx | DOCX document | |
| CS-49_Site_Showing_Sign_In.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey_Report.pdf | ||
| Cameron_Creole_Freshwater_Intro_(CS-49)_Mag_Survey.pdf | ||
| CS-49_Bid_Schedule_Current.pdf | ||
| CS-49_Final_Stamped_Construction_Drawings.pdf | ||
| CS-49_Final_Stamped_Specification.pdf | ||
| Wage_Rates.pdf | ||
| CS-49_Solicitation.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3a. DATE BIDS DUE | 3b. DATE OPENED | PAGE | |||||||||||
| ABSTRACT OF BIDS - CONSTRUCTION | 12-FPC2-19-B-0003 | 6/4/19 | 7/29/19 | 7/29/19 | 1 of 2 | ||||||||||
| 4. ISSUING OFFICE | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | ||||||||||||||
| USDA Natural Resources Conservation Service | I CERTIFY that I have opened, read, and | Dale Clark | |||||||||||||
| 3737 Government Street | Contracting Officer | ||||||||||||||
| Alexandria, LA 71302 | received in response to this solicitation. | SIGNATURE | DATE SIGNED | ||||||||||||
| //SIGNED - DCC// | 7/29/19 | ||||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | NO. 5 | ||||||||||
| CS-49 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||||
| Cameron-Creole Freshwater Intro | B. REASONABLE CONTRACT | Trans4Fed, LLC | Dean Equipment, Inc. | BDS Constructors, LLC | Wilco Marsh Buggies, Inc | Brice Civil Constructors, Inc | |||||||||
| (Without Profit) | |||||||||||||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and amount) | |||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | 20% | 20% | 20% | 20% | 20% | |||||||||
| 1 | (Including Profit) | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | ||||||||||
| Yes | Yes | Yes | Yes | Yes | |||||||||||
| 7A | 7C. EST. | D. | E. UNIT | F. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | |
| Item | 7D. DESCRIPTION OF OFFERED ITEM | QUANTITY | UNIT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| No. | |||||||||||||||
| 1 | Mobilization and Demobilization | 1 | L.S. | $0.00 | $ 1,972,780.00 | $1,972,780.00 | $ 1,500,000.00 | $1,500,000.00 | $ 610,000.00 | $610,000.00 | $ 1,190,000.00 | $1,190,000.00 | $ 359,789.00 | $359,789.00 | |
| 2 | Floating Marine Barrier | 1 | LS | $0.00 | $ 8,850.00 | $8,850.00 | $ 120,000.00 | $120,000.00 | $ 54,000.00 | $54,000.00 | $ 70,150.00 | $70,150.00 | $ 93,034.00 | $93,034.00 | |
| 3 | Construction Surveys | 1 | L.S. | $0.00 | $ 180,000.00 | $180,000.00 | $ 800,000.00 | $800,000.00 | $ 855,800.00 | $855,800.00 | $ 708,333.00 | $708,333.00 | $ 505,000.00 | $505,000.00 | |
| 4 | Clearing | 1 | L.S. | $0.00 | $ 100,000.00 | $100,000.00 | $ 100,000.00 | $100,000.00 | $ 30,000.00 | $30,000.00 | $ 35,000.00 | $35,000.00 | $ 130,390.00 | $130,390.00 | |
| 5 | Excavation, Intake Complex | 1 | L.S. | $0.00 | $ 50,000.00 | $50,000.00 | $ 125,000.00 | $125,000.00 | $ 155,000.00 | $155,000.00 | $ 91,150.00 | $91,150.00 | $ 139,400.00 | $139,400.00 | |
| 6 | Removal of Water | 1 | L.S. | $0.00 | $ 100,000.00 | $100,000.00 | $ 275,000.00 | $275,000.00 | $ 335,000.00 | $335,000.00 | $ 218,300.00 | $218,300.00 | $ 407,108.00 | $407,108.00 | |
| 7 | Metal Fabrication, Walkways | 1 | L.S. | $0.00 | $ 45,000.00 | $45,000.00 | $ 420,000.00 | $420,000.00 | $ 183,000.00 | $183,000.00 | $ 238,230.00 | $238,230.00 | $ 254,757.00 | $254,757.00 | |
| 8 | Excavation, Montesano Canal Conveyance Channel | 1 | L.S. | $0.00 | $ 200,000.00 | $200,000.00 | $ 250,000.00 | $250,000.00 | $ 587,000.00 | $587,000.00 | $ 161,000.00 | $161,000.00 | $ 660,454.00 | $660,454.00 | |
| 9 | Round Timber Piling, Batter Piles | 26 | EA | $0.00 | $ 500.00 | $13,000.00 | $ 10,000.00 | $260,000.00 | $ 3,300.00 | $85,800.00 | $ 2,332.00 | $60,632.00 | $ 6,122.47 | $159,184.22 | |
| 10 | Round Timber Piling, 4-pile Dolphins | 8 | EA | $0.00 | $ 1,200.00 | $9,600.00 | $ 15,000.00 | $120,000.00 | $ 7,500.00 | $60,000.00 | $ 6,440.00 | $51,520.00 | $ 10,936.00 | $131,232.00 | |
| 11 | Steel Sheet Piling | 5,800 | SF | $0.00 | $ 65.00 | $377,000.00 | $ 130.00 | $754,000.00 | $ 98.00 | $568,400.00 | $ 78.15 | $453,270.00 | $ 110.52 | $641,016.00 | |
| 12 | Slide Gates | 8 | EA | $0.00 | $ 15,000.00 | $120,000.00 | $ 50,000.00 | $400,000.00 | $ 32,500.00 | $260,000.00 | $ 45,200.00 | $361,600.00 | $ 38,724.32 | $309,794.56 | |
| 13 | Flap Gates | 8 | EA | $0.00 | $ 12,000.00 | $96,000.00 | $ 50,000.00 | $400,000.00 | $ 31,900.00 | $255,200.00 | $ 40,000.00 | $320,000.00 | $ 37,006.15 | $296,049.20 | |
| 14 | Rock RipRap at Intake Complex | 7,085 | Tons | $0.00 | $ 70.00 | $495,950.00 | $ 82.00 | $580,970.00 | $ 79.00 | $559,715.00 | $ 82.20 | $582,387.00 | $ 94.14 | $666,981.90 | |
| 15 | Foreshore Rock Dikes | 38,062 | Tons | $0.00 | $ 70.00 | $2,664,340.00 | $ 79.00 | $3,006,898.00 | $ 85.69 | $3,261,532.78 | $ 70.78 | $2,694,028.36 | $ 78.55 | $2,989,770.10 | |
| 16 | Earthfill, Terraces | 139,003 | L.F. | $0.00 | $ 45.00 | $6,255,135.00 | $ 28.00 | $3,892,084.00 | $ 16.46 | $2,287,989.38 | $ 26.00 | $3,614,078.00 | $ 17.34 | $2,410,312.02 | |
| 17 | Earthfill, Earthen Plug | 1 | L.S. | $0.00 | $ 100,000.00 | $100,000.00 | $ 100,000.00 | $100,000.00 | $ 54,500.00 | $54,500.00 | $ 74,000.00 | $74,000.00 | $ 164,592.00 | $164,592.00 | |
| 18 | Geotextile | 34,061 | SY | $0.00 | $ 8.00 | $272,488.00 | $ 10.00 | $340,610.00 | $ 10.00 | $340,610.00 | $ 10.00 | $340,610.00 | $ 11.80 | $401,919.80 | |
| 19 | Lighted Permanent Warning Signs | 6 | EA | $0.00 | $ 10,000.00 | $60,000.00 | $ 12,500.00 | $75,000.00 | $ 4,000.00 | $24,000.00 | $ 2,800.00 | $16,800.00 | $ 9,576.00 | $57,456.00 | |
| 3 | |||||||||||||||
| 4 | |||||||||||||||
| 5 | |||||||||||||||
| 6 | |||||||||||||||
| 7 | |||||||||||||||
| 8 | |||||||||||||||
| 9 | |||||||||||||||
| 10 | |||||||||||||||
| 11 | |||||||||||||||
| 12 | |||||||||||||||
| 13 | |||||||||||||||
| 14 | |||||||||||||||
| 15 | |||||||||||||||
| 16 | |||||||||||||||
| 17 | |||||||||||||||
| 18 | |||||||||||||||
| 19 | |||||||||||||||
| 20 | |||||||||||||||
| 21 | |||||||||||||||
| 22 | |||||||||||||||
| 23 | |||||||||||||||
| 24 | |||||||||||||||
| 25 | |||||||||||||||
| 26 | |||||||||||||||
| 27 | |||||||||||||||
| 28 | |||||||||||||||
| 29 | |||||||||||||||
| 30 | |||||||||||||||
| 31 | |||||||||||||||
| 32 | |||||||||||||||
| TOTAL | $0.00 | $13,120,143.00 | $13,519,562.00 | $10,567,547.16 | $11,281,088.36 | $10,788,239.80 | |||||||||
| OPTIONAL FORM 1419 |
Sheet2
| 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3a. DATE BIDS DUE | 3b. DATE OPENED | PAGE | |||||||||||||
| ABSTRACT OF OFFERS - CONSTRUCTION | 12-FPC2-19-B-0003 | 6/4/19 | 7/29/19 | 7/29/19 | 2 of 2 | ||||||||||||
| 4. ISSUING OFFICE | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | ||||||||||||||||
| USDA Natural Resources Conservation Service | I CERTIFY that I have opened, read, and | Dale Clark | |||||||||||||||
| 3737 Government Street | Contracting Officer | ||||||||||||||||
| Alexandria, LA 71302 | received in response to this solicitation. | SIGNATURE | DATE SIGNED | ||||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 6 | NO. 7 | NO. 8 | NO. 9 | NO. 10 | NO. 11 | |||||||||||
| CS-49 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||||
| Cameron-Creole Freshwater Intro | B. REASONABLE CONTRACT | Tarpan Construction, LLC | Cayo, LLC | Pontchartrain Partners, LLC | |||||||||||||
| (Without Profit) | |||||||||||||||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | ||||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | 20% | 20% | 20% | |||||||||||||
| 1 | (Including Profit) | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | ||||||||||
| Yes | Yes | Yes | |||||||||||||||
| 7A | 7C. EST. | D. | E. UNIT | F. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | |
| Item | 7D. DESCRIPTION OF OFFERED ITEM | QUANTITY | UNIT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| No. | |||||||||||||||||
| 1 | Mobilization and Demobilization | 1 | L.S. | 0.00 | $0.00 | 616,280.50 | $616,280.50 | 1,175,000.00 | $1,175,000.00 | 1,200,000.00 | $1,200,000.00 | ||||||
| 2 | Floating Marine Barrier | 1 | LS | 0.00 | $0.00 | 51,100.00 | $51,100.00 | 70,000.00 | $70,000.00 | 90,000.00 | $90,000.00 | ||||||
| 3 | Construction Surveys | 1 | L.S. | 0.00 | $0.00 | 334,000.00 | $334,000.00 | 1,200,000.00 | $1,200,000.00 | 650,000.00 | $650,000.00 | ||||||
| 4 | Clearing | 1 | L.S. | 0.00 | $0.00 | 222,500.00 | $222,500.00 | 900,000.00 | $900,000.00 | 475,000.00 | $475,000.00 | ||||||
| 5 | Excavation, Intake Complex | 1 | L.S. | 0.00 | $0.00 | 29,000.00 | $29,000.00 | 300,000.00 | $300,000.00 | 410,000.00 | $410,000.00 | ||||||
| 6 | Removal of Water | 1 | L.S. | 0.00 | $0.00 | 115,000.00 | $115,000.00 | 300,000.00 | $300,000.00 | 440,000.00 | $440,000.00 | ||||||
| 7 | Metal Fabrication, Walkways | 1 | L.S. | 0.00 | $0.00 | 303,300.00 | $303,300.00 | 350,000.00 | $350,000.00 | 340,000.00 | $340,000.00 | ||||||
| 8 | Excavation, Montesano Canal Conveyance Channel | 1 | L.S. | 0.00 | $0.00 | 370,500.00 | $370,500.00 | 700,000.00 | $700,000.00 | 515,000.00 | $515,000.00 | ||||||
| 9 | Round Timber Piling, Batter Piles | 26 | EA | 0.00 | $0.00 | 5,430.00 | $141,180.00 | 10,000.00 | $260,000.00 | 4,400.00 | $114,400.00 | ||||||
| 10 | Round Timber Piling, 4-pile Dolphins | 8 | EA | 0.00 | $0.00 | 6,950.00 | $55,600.00 | 10,000.00 | $80,000.00 | 14,400.00 | $115,200.00 | ||||||
| 11 | Steel Sheet Piling | 5,800 | SF | 0.00 | $0.00 | 87.60 | $508,080.00 | 80.00 | $464,000.00 | 100.00 | $580,000.00 | ||||||
| 12 | Slide Gates | 8 | EA | 0.00 | $0.00 | 23,900.00 | $191,200.00 | 25,000.00 | $200,000.00 | 40,500.00 | $324,000.00 | ||||||
| 13 | Flap Gates | 8 | EA | 0.00 | $0.00 | 18,200.00 | $145,600.00 | 25,000.00 | $200,000.00 | 38,000.00 | $304,000.00 | ||||||
| 14 | Rock RipRap at Intake Complex | 7,085 | Tons | 0.00 | $0.00 | 73.00 | $517,205.00 | 95.00 | $673,075.00 | 77.00 | $545,545.00 | ||||||
| 15 | Foreshore Rock Dikes | 38,062 | Tons | 0.00 | $0.00 | 71.15 | $2,708,111.30 | 95.00 | $3,615,890.00 | 85.00 | $3,235,270.00 | ||||||
| 16 | Earthfill, Terraces | 139,003 | L.F. | 0.00 | $0.00 | 18.80 | $2,613,256.40 | 35.00 | $4,865,105.00 | 21.50 | $2,988,564.50 | ||||||
| 17 | Earthfill, Earthen Plug | 1 | L.S. | 0.00 | $0.00 | 43,800.00 | $43,800.00 | 50,000.00 | $50,000.00 | 51,000.00 | $51,000.00 | ||||||
| 18 | Geotextile | 34,061 | SY | 0.00 | $0.00 | 8.08 | $299,736.80 | 12.00 | $408,732.00 | 9.80 | $333,797.80 | ||||||
| 19 | Lighted Permanent Warning Signs | 6 | EA | 0.00 | $0.00 | 2,925.00 | $17,550.00 | 5,000.00 | $30,000.00 | 6,200.00 | $37,200.00 | ||||||
| 3 | |||||||||||||||||
| 4 | |||||||||||||||||
| 5 | |||||||||||||||||
| 6 | |||||||||||||||||
| 7 | |||||||||||||||||
| 8 | |||||||||||||||||
| 9 | |||||||||||||||||
| 10 | |||||||||||||||||
| 11 | |||||||||||||||||
| 12 | |||||||||||||||||
| 13 | |||||||||||||||||
| 14 | |||||||||||||||||
| 15 | |||||||||||||||||
| 16 | |||||||||||||||||
| 17 | |||||||||||||||||
| 18 | |||||||||||||||||
| 19 | |||||||||||||||||
| 20 | |||||||||||||||||
| 21 | |||||||||||||||||
| 22 | |||||||||||||||||
| 23 | |||||||||||||||||
| 24 | |||||||||||||||||
| 25 | |||||||||||||||||
| 26 | |||||||||||||||||
| 27 | |||||||||||||||||
| 28 | |||||||||||||||||
| 29 | |||||||||||||||||
| 30 | |||||||||||||||||
| 31 | |||||||||||||||||
| 32 | |||||||||||||||||
| TOTAL | $0.00 | $9,283,000.00 | $15,841,802.00 | $12,748,977.30 | |||||||||||||
| OPTIONAL FORM 1419A |
Sheet3
| 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3a. DATE BIDS DUE | 3b. DATE OPENED | PAGE | |||||||||||||
| ABSTRACT OF OFFERS - CONSTRUCTION | 12-FPC2-19-B-0003 | 6/4/19 | 7/29/19 | 7/29/19 | 3 of 3 | ||||||||||||
| 4. ISSUING OFFICE | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | ||||||||||||||||
| USDA Natural Resources Conservation Service | I CERTIFY that I have opened, read, and | Dale Clark | |||||||||||||||
| 3737 Government Street | Contracting Officer | ||||||||||||||||
| Alexandria, LA 71302 | received in response to this solicitation. | SIGNATURE | DATE SIGNED | ||||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 12 | NO. 13 | NO. 14 | NO. 15 | NO. 16 | NO. 17 | |||||||||||
| CS-49 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||||
| Cameron-Creole Freshwater Intro | B. REASONABLE CONTRACT | ||||||||||||||||
| (Without Profit) | |||||||||||||||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | B. BID SECURITY (Type and Amount) | ||||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | ||||||||||||||||
| 1 | (Including Profit) | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | C. ADDENDA ACKNOWLEDGED | ||||||||||
| 7A | 7C. EST. | D. | E. UNIT | F. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | D. UNIT | E. ESTIMATED | |
| Item | 7D. DESCRIPTION OF OFFERED ITEM | QUANTITY | UNIT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| No. | |||||||||||||||||
| 1 | Mobilization and Demobilization | 1 | L.S. | ||||||||||||||
| 2 | Floating Marine Barrier | 1 | LS | ||||||||||||||
| 3 | Construction Surveys | 1 | L.S. | ||||||||||||||
| 4 | Clearing | 1 | L.S. | ||||||||||||||
| 5 | Excavation, Intake Complex | 1 | L.S. | ||||||||||||||
| 6 | Removal of Water | 1 | L.S. | ||||||||||||||
| 7 | Metal Fabrication, Walkways | 1 | L.S. | ||||||||||||||
| 8 | Excavation, Montesano Canal Conveyance Channel | 1 | L.S. | ||||||||||||||
| 9 | Round Timber Piling, Batter Piles | 26 | EA | ||||||||||||||
| 10 | Round Timber Piling, 4-pile Dolphins | 8 | EA | ||||||||||||||
| 11 | Steel Sheet Piling | 5,800 | SF | ||||||||||||||
| 12 | Slide Gates | 8 | EA | ||||||||||||||
| 13 | Flap Gates | 8 | EA | ||||||||||||||
| 14 | Rock RipRap at Intake Complex | 7,085 | Tons | ||||||||||||||
| 15 | Foreshore Rock Dikes | 38,062 | Tons | ||||||||||||||
| 16 | Earthfill, Terraces | 139,003 | L.F. | ||||||||||||||
| 17 | Earthfill, Earthen Plug | 1 | L.S. | ||||||||||||||
| 18 | Geotextile | 34,061 | SY | ||||||||||||||
| 19 | Lighted Permanent Warning Signs | 6 | EA | ||||||||||||||
| 3 | |||||||||||||||||
| 4 | |||||||||||||||||
| 5 | |||||||||||||||||
| 6 | |||||||||||||||||
| 7 | |||||||||||||||||
| 8 | |||||||||||||||||
| 9 | |||||||||||||||||
| 10 | |||||||||||||||||
| 11 | |||||||||||||||||
| 12 | |||||||||||||||||
| 13 | |||||||||||||||||
| 14 | |||||||||||||||||
| 15 | |||||||||||||||||
| 16 | |||||||||||||||||
| 17 | |||||||||||||||||
| 18 | |||||||||||||||||
| 19 | |||||||||||||||||
| 20 | |||||||||||||||||
| 21 | |||||||||||||||||
| 22 | |||||||||||||||||
| 23 | |||||||||||||||||
| 24 | |||||||||||||||||
| 25 | |||||||||||||||||
| 26 | |||||||||||||||||
| 27 | |||||||||||||||||
| 28 | |||||||||||||||||
| 29 | |||||||||||||||||
| 30 | |||||||||||||||||
| 31 | |||||||||||||||||
| 32 | |||||||||||||||||
| TOTAL | |||||||||||||||||
| OPTIONAL FORM 1419A |