CA FLAP SR89(1), Truckee River Bridge

Awarded Award Notice Posted

Solicitation number
DTFH6816B00001
Agency
Federal Highway Administration Department of Transportation
Awarded
to Martin Brothers Construction
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00034 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Lake Tahoe Lake Tahoe, California 96150, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: May 11, 2016 4:42 pm Modified: May 12, 2016 11:36 amTrack Changes

Revised on 5/12/16

The Truckee River Bridge project is located along Lake Tahoe's west shore near the SR 89 and SR 28 intersection area in Tahoe City, California. The work includes realigning State Route 89 between Granlibakken Road and the junction of State Route 89/State Route 28 (SR 89/SR 28) to replace the structurally deficient Fanny Bridge, and to accommodate traffic demands at the SR 89/SR 28 junction in Tahoe City. The purpose of the project is to reduce traffic congestion and improve the safety and operations of SR 89/SR 28 junction in Tahoe City by addressing: present and future automobile travel demand, pedestrian and bicycle mobility, public transit needs, the structural integrity of the Truckee River Bridge (Fanny Bridge), and emergency access to the West Shore within the Fanny Bridge Influence area. Three roundabouts, a new bridge, a bridge replacement, and realigned shared use paths are proposed with the improvements.


The Dollar Creek Trail project proposes to construct 2.2 miles of new shared-use trail along the north shore of Lake Tahoe near State Route (SR) 28 between Dollar Hill and Tahoe Vista.  The project will include a shared-use trail, a bridge over Dollar Creek, a marked pedestrian crossing at SR 28 and Dollar Drive, and a neighborhood connector at County Club Drive.  The Dollar Creek Shared-Use Trail runs from the Dollar Hill area northeast to Fulton Crescent Drive.


 SIGNIFICANT QUANTITIES:


Schedule A: (1.5 miles of roadway improvements, 0.6 miles of path improvements, three roundabouts, one new bridge, one bridge replacement) - Significant items include (quantities are subject to change):


              •·         18 acres of clearing and grubbing


•·         Removal and replacement of 1 bridge (Fanny Bridge)


•·         Construction of new bridge over the Truckee River


•·         Sewer Line Utility Relocation


•·         13,500 Tons of Asphalt Concrete Pavement


•·         12,000 Tons of Aggregate Base


•·         370 Square Feet of Concrete Retaining Walls


•·         2,000 Linear Feet of Girders


•·         200,000 Pounds of Reinforcing Steel


•·         360 Linear Feet of Drilled Shafts


•·         13,000 Linear Feet of Concrete Curb


•·         5,500 Square Feet of Rockery Walls


•·         21,000 Cubic Yards of Excavation


•·         31,500 Cubic Yards of Embankment


•·         Landscaping and Revegetation


•·         Signing and Striping


•·         Wetland Mitigation


 Option X: (0.12 miles of roadway improvements) - Significant items include (quantities are subject to change):


•·         2,300 Cubic Yards of Roadway Excavation


•·         900 Tons of Aggregate Base


•·         1,500 Tons of Asphalt Concrete Pavement


 Option Y:  2.2 miles of new trail and one new pedestrian bridge - Significant items include:


•·         5.8 Acres of Clearing and Grubbing


•·         4, 050 Cubic Yards of Excavation


•·         7,900 Tons of Aggregate Base


•·         2.700 Tons of Hot Asphalt Concrete Pavement


•·         1 Pre-fabricated Steel Bridge (pedestrian bridge)


 ENGINEER'S ESTIMATE: 


 The project engineer's estimate for Schedule A is approximately $25 M


 The project engineer's estimate for Option X is approximately $600,000


 The project engineer's estimate for Option Y is approximately $3 M


  CONSTRUCTION DURATION: 


 Tentative start date is July 12th, 2016 and estimated completion date is October 15, 2017.


 FUNDING SOURCE: 


 Funding sources are through the Federal Lands Access Program and Local Matching funds from Placer County.


 MISCELLANEOUS:


 The Tahoe Regional Planning Agency (TRPA) has grading restrictions greater than 3 cubic yards between October 15 and May 15.  Exemptions can be granted due to dry weather.


 ADDITIONAL INFORMATION FOR NOTICE


Anticipated advertisement on May 28th, 2016


Anticipated bid opening June 17th, 2016


Anticipated Award on July 1st, 2016


Anticipated Notice to Proceed on July 12th, 2016


 

Update #1 ·

Added: May 11, 2016 4:42 pm

The project is located along Lake Tahoe's west shore near the SR 89 and SR 28 intersection area in Tahoe City, California. The work includes realigning State Route 89 between Granlibakken Road and the junction of State Route 89/State Route 28 (SR 89/SR 28) to replace the structurally deficient Fanny Bridge, and to accommodate traffic demands at the SR 89/SR 28 junction in Tahoe City. The purpose of the project is to reduce traffic congestion and improve the safety and operations of SR 89/SR 28 junction in Tahoe City by addressing: present and future automobile travel demand, pedestrian and bicycle mobility, public transit needs, the structural integrity of the Truckee River Bridge (Fanny Bridge), and emergency access to the West Shore within the Fanny Bridge Influence area. Three roundabouts, a new bridge, a bridge replacement, and realigned shared use paths are proposed with the improvements.


Option X of the Truckee River Bridge project includes the Dollar Creek Trail project, CA FLAP 10089(1).  The Dollar Creek Trail Option proposes to construct 2.2 miles of new shared-use trail along the north shore of Lake Tahoe near State Route (SR) 28 between Dollar Hill and Tahoe Vista.  The option will include a shared-use trail, a bridge over Dollar Creek, a marked pedestrian crossing at SR 28 and Dollar Drive, and a neighborhood connector at County Club Drive.  The Dollar Creek Shared-Use Trail runs from the Dollar Hill area northeast to Fulton Crescent Drive.


Scope of the Work


Schedule A: 1.5 miles of roadway improvements, 0.6 miles of path improvements, three roundabouts, one new bridge, one bridge replacement - Significant items include (quantities are subject to change):


Sewer Line Utility Relocation


13,000 Tons of Asphalt Concrete Pavement


10,300 Square Feet of Concrete Retaining Walls


1500 Linear Feet of Girders


360 Linear Feet of Drilled Shafts


1,079 Cubic Yards of Concrete


6,800 Square Feet of Rockery Walls


23,000 Cubic Yards of Earthwork


Option X:  2.2 miles of new trail and one new pedestrian bridge - Significant items include:


5.8 Acres of Clearing and Grubbing


4, 050 Cubic Yards of Excavation


7,900 Tons of Aggregate Base


2.700 Tons of Hot Asphalt Concrete Pavement


1 Pre-fabricated Steel Bridge (pedestrian bridge)


It is anticipated that this project will be advertised in May or June 2016 with construction beginning August 2016 and ending October, 2017.  The contracting range for Schedule A and Option X for this project are between $25 million to $35 million.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid_Opening_Summary.pdf PDF
Bidders_Questions_7-22-16.pdf PDF
Amendment_A005.pdf PDF
Bidders_Questions_7-19B-16.pdf PDF
Amendment_A004.pdf PDF
Bidders_Questions_7-19-16.pdf PDF
Bidders_Questions_7-18-16.pdf PDF
Encroachment_Permit_for_Truckee_River_Bridge.pdf PDF
Draft_SWPPP.pdf PDF
Encroachment_Permit_for_Dollar_Creek_Trail.pdf PDF
Bidders_Questions_7-15-16.pdf PDF
Amendment_A003.pdf PDF
Bidders_Questions_7-13-16.pdf PDF
CA_Flap_SR_89_(1)_and_10089_(1)_Pre_Bid_Mtg.pdf PDF
CA_FLAP_Tahoe_Pre_Bid_Presentation_July_2016_FINAL.pptx PPTX presentation
Bidders_Questions_7-8-16.pdf PDF
Amendment_A0002.pdf PDF
Bidders_Questions_7-6-16.pdf PDF
Amendment_A001.pdf PDF
CA_FLAP_SR89(1)_Sch_A_Option_X_Plans.pdf PDF
CA-FLAP-SR89(1)_Truckee_River_Bridge_SSR_Addendum.pdf PDF
CA-FLAP-SR89(1)_Fanny_Bridge_SSR.pdf PDF
8436_Bridge_Hydraulic_Study_PRELIMINARY_Full-TM_20140418.pdf PDF
Dollar_Creek_Hydraulic_Report__Final_.pdf PDF
2016-01-22_SR-89_and_Fanny_Bridge_Addendum_Memorandum.pdf PDF
CA_FLAP_SR89(1)_DrainageReport-Final.pdf PDF
160603-Truckee_River_Bridge_and_Retaining_Walls_Geotechnical_Report-final.pdf PDF
Dollar_Creek_Bike_Path_Geotechnical_Memo_09-10-14.pdf PDF
160603-Fanny_Bridge_and_Pavement_Geotechnical_Report-final.pdf PDF
CA_FLAP_10089(1)_Option_Y_Plans.pdf PDF
Appendix.pdf PDF
CA_FLAP_10089(1)_Option_Y_Plans.pdf PDF
DTFH681600001_CA_FLAP_SR89(1)_ _CA_FLAP_10089(1).pdf PDF
Show all 33

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity