Dollar Creek Hydraulic Report
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft Hydraulic Report
Dollar Creek Trail
CA FLAP 10089(1)
Prepared by
Veronica Ghelardi Technical Services Hydraulic Engineer
Central Federal lands Highway Division Lakewood, Colorado
October 2014 i
Contents
INTRODUCTION
PROJECT BACKGROUND
PROJECT DATA
PROJECT AREA DESCRIPTION
HYDROLOGIC ANALYSIS
HYDRAULIC ANALYSIS
EXISTING HEC RAS MODEL
PROPOSED HEC RAS MODEL
FREEBOARD
SCOUR
SUMMARY
REFERENCES
APPENDIX A
Hydrology
APPENDIX B
Hydraulics
TABLES
Table 1. USGS Regression Equation Summary Table 2. TR-55 Variables and Calculated Discharges Table 3 HEC HMS Parameters Table 4 HEC HMS Discharges Table 5. Comparison of Hydrologic Methods Recurrence Interval Discharges Table 6 Comparison of Existing & Proposed Water Surface Elevations & Velocities (cross section 1378) 11
FIGURES
Figure 1 – Dollar Creek Bridge Project Location Map Figure 2 – Dollar Creek (Google Earth aerial view) 2013 Figure 3. Proposed Bridge Location with Upstream Pond Figure 4. Dollar Creek Drainage Area at the Proposed Bridge Figure 5. USGS Regression Equations for Sierra Nevada Region Figure 6 HEC HMS Dollar Creek Basin Model Figure 7 – Dollar Creek existing water surface profiles Figure 8. Existing Water Surface Elevation at Proposed Bridge Crossing Figure 9. Stream Water Surface Profile Figure 10. Immediately Upstream Face of Proposed Bridge ii
Figure 11. Immediately Downstream Face of Proposed Bridge
INTRODUCTION
The purpose of this hydraulic report is to provide hydraulic recommendations for the 100-year water surface elevation for a new bridge on the soon to be built bike/pedestrian path in Placer County, California.
This hydraulic report provides a brief overview of the key project elements and summary of the hydrologic and hydraulic analyses.
PROJECT BACKGROUND
A new bike/pedestrian path will be built that will include a new bridge over Dollar Creek as part of a planned bike/pedestrian path that will be built in stages around Lake Tahoe. For reference, the project is located in East Central California on the north shore of Lake Tahoe, in Placer County. The project location can be seen in Figure 1 and can be referenced by the following geographic coordinates: Latitude:
39˚12’00.63” N and Longitude: 120˚06′27.33” W.
Figure 1 – Dollar Creek Bridge Project Location Map
PROJECT DATA
Mapping information and cross sections for the project were collected by the Placer County and included ground surveys near the bridge taken in the spring of 2014.
PROJECT AREA DESCRIPTION
This project is located in a wooded, rural area Figure 2 and 3. Dollar Creek is an ephemeral stream with a dammed pond located approximately 600 feet upstream of the proposed bridge location, Figure 3.
Project location
Lake Tahoe
Figure 2 – Dollar Creek (Google Earth aerial view) 2013
Figure 3. Proposed Bridge Location with Upstream Pond
HYDROLOGIC ANALYSIS
The Watershed Modeling System (WMS) (Aquaveo 2014) was used to delineate the watershed. Digital Elevation Maps were obtained from USGS National Map Viewer website. WMS calculated a basin drainage area of 0.69 square miles, Figure 4. Three hydrology methods were analyzed to determine the discharge at the bridge including the California USGS Regression Equations, the Soil Conservation Service Technical Report-55 (SCS TR-55)Method and the Placer County Flood Control and Water conservation District Stormwater Management Manual’s (SWMM) Method.
Figure 4. Dollar Creek Drainage Area at the Proposed Bridge
USGS REGRESSION EQUATION METHOD
The CA USGS Regression Equations for the Sierra Nevada Region were used to estimate the discharge for flow events. These regression equations base the return period discharges on the size of the drainage area, mean annual precipitation and the mean basin elevation. The equations for the Sierra Nevada Region are shown in Figure 5. The estimated discharges are provided in Table 1.
Figure 5. USGS Regression Equations for Sierra Nevada Region
Return Period (yr)
Discharge (cfs)
2 10
10 45
25 75
50 110
100 145
Table 1. USGS Regression Equation Summary
The USGS Regression Equations were checked against the Soil Conservation Service’s Technical Report-55 method (SCS TR-55) within WMS.
SCS TR-55 METHOD
The WMS TR-55 program needs the user to provide input variables including:
Curve number
24-hour rainfall for the return period
Type of rainfall distribution
Pond area
WMS automatically inserts the drainage area, and time of concentration from basin data information.
There is a small upstream pond that has an uncontrolled overflow weir. In discussion with the Placer County project manager is was decided that the hydrology would assume no attenuation of flows from the pond. The rainfall data was obtained from the NOAA Atlas 14 Precipitation Frequency Data Server, Appendix A. Ssurgo soil data was obtained from the USDA-NRCS Soil Survey website and land use data was obtained from USGS land use website.
Table 2 shows the other variables used in the TR-55 calculations and the resulting Discharge for the return periods 2-, 10-, 25-, 50-, 100-yr. The WMS TR-55 calculation is shown in Appendix A.
Return Period
(yr)
SCS
Curve
Number
Drainage Area
(sq. mile)
Type of Rainfall
Distribution
Time of Concentration
(hr)
24-hour rainfall
(in)
Calculated Discharge
(cfs)
2 60 0.69 Type IA 0.42 3.42 20
10 60 0.69 Type IA 0.42 5.14 77
25 60 0.69 Type IA 0.42 6.25 143
50 60 0.69 Type IA 0.42 7.14 202
100 60 0.69 Type IA 0.42 8.08 269
Table 2. TR-55 Variables and Calculated Discharges
PLACER COUNTY KINEMATIC WAVE PROCEDURE
During the 30% review by Placer County a comment was made that the county requires the Placer County SWMM hydrology method be used for all county projects. The method looks at the relationship between location elevation and mean annual precipitation that reflects the orographic nature of regional precipitation. The criteria for the design storm can be temporal or spatial distribution of precipitation intensities. For the Dollar Creek analysis, a temporal distribution was used. This type of storm pattern centers the most intense precipitation from the shortest duration and incorporates depths (from the depth-duration-frequency, DDF, data) for all successive durations within the overall duration of the storm.
The result is a pattern that tapers from the center of the representative storm. The SWMM provides precipitation depth and duration data for the 2-, 5-,10-, 25-, 50-, 100-, 200- and 500-year recurrence intervals based on whether the project location is east or west of the Sierra Nevada Crest. The depth data is based on the project elevation East of the Sierra Nevada Crest and shown in Appendix V-A of the SWMM guide manual. The Dollar Creek project is located at 7000 ft, therefore the depths in the 5000 ft elevation table were increased by the change in depth table for every 1000 feet above 5000 feet; i.e. the 5000 ft depth plus the indicated change per 1000 ft times 2. These tables are shown in Appendix A. Using the DDF data in the Placer County hydrology method yields a hyetograph (rainfall intensity graph) for the project.
The development of the design hyetograph is shown in Appendix A.
The SWMM recommends using the Kinematic Wave procedure as the appropriate representation of channel routing where channel storage does not attenuate peak flows. Dollar Creek has a small pond upstream of the project site that is held back by a dam that releases flow over a weir. The Placer County project manager instructed that the hydrology would assume no attenuation of the flow since the pond is small. Given this assumption, the Kinematic Wave procedure was used to estimate the discharges at the bridge location.
The SWMM provides information to use in HEC_HMS including the Infiltration rate, the base flow, how to develop a design storm and how to determine the duration of the design storm. The duration of the storm is set equal to four times the response rate of the watershed. The project bridge over Dollar Creek has a Time of Concentration(Tc) time of 0.42 hours or 25.2 minutes as calculated by the WMS program. The duration of the storm is then 100 mins. Table 3 shows the parameters used in the HEC-HMS model and Figure 6 shows the HEC HMS basin model.
Basin Model
Drainage Area 0.649 sq mi.
Loss Method Initial and Constant
Transform Method Kinematic Wave
Meterological Model
Specified Hyetograph
From Placer County Method for Time Distribution
Duration 1.67 hours
Time Interval 5 mins.
Table 3 HEC HMS Parameters
Figure 6 HEC HMS Dollar Creek Basin Model
The recurrence interval discharges from the HEC HMS models are shown in Table 4. Table 5 provides a comparison of the three hydrologic methods that were investigated to calculate discharges to be used at the bridge location.
(yr)
Drainage Area
(sq. mile)
Time of Concentrati on (hr)
HEC HMS
Kinematic Wave
Discharge (cfs)
2 0.69 0.42 28
25 0.69 0.42 150
50 0.69 0.42 220
100 0.69 0.42 270
Table 4 HEC HMS Discharges
(yr)
USGS
Discharge (cfs)
SCS TR-55
Method (cfs)
Kinematic Wave (cfs)
2 10 20 28
25 75 143 150
50 110 202 220
100 145 269 270
Table 5. Comparison of Hydrologic Methods Recurrence Interval Discharges
The three hydrologic methods produced 100-yr design storm discharges of 145 cfs, 269 cfs, and 270 cfs.
The Kinematic Wave discharge of 270 cfs will be used for design per Placer County’s request.
HYDRAULIC ANALYSIS
EXISTING HEC RAS MODEL
The Hydrologic Engineering Center River Analysis System (HEC-RAS) software (USACE 2010) was used to model Dollar Creek in the vicinity of the bridge location. A total of 10 cross sections were surveyed to represent the channel geometry through the reach. The model limits extend roughly 260 feet downstream and 420 feet upstream of the bridge. The new bridge will be located on a naturally occurring bench in the landscape just upstream of river station 1340. An n value of 0.045 in the channel and 0.05 in the overbanks were used for roughness values in the model.
The upstream energy slope averages to 0.039 ft/ft. above the proposed bridge and the downstream energy slope below the bridge averages to .025 ft/ft shown in Figure 6. Because the stream is on such steep slopes, HEC RAS was run in the mixed flow regime. As can be seen in Figure 7, the 100-yr floodplain extends 40 feet at the location of the proposed bridge.
Figure 7 – Dollar Creek existing water surface profiles.
Figure 8. Existing Water Surface Elevation at Proposed Bridge Crossing
0 200 400 600 800
Dollar_Creek Plan: Existing Geom: existing from survey
Main Channel Distance (ft)
E le v a ti o n ft)
Legend
WS 100-yr
WS 50-yr
WS 25-yr
WS 2-yr
Ground br1 HYD
0 50 100 150 200 250
Dollar_Creek Plan: Existing
Geom: existing from survey
RS = 1340
Station (ft)
E le va tio n ft)
Legend
WS 100-yr
WS 50-yr
WS 25-yr
WS 2-yr
0.0 ft/s
0.5 ft/s
1.0 ft/s
1.5 ft/s
2.0 ft/s
2.5 ft/s
3.0 ft/s
Ground
Bank Sta
.05 .045 .05
PROPOSED HEC RAS MODEL
The proposed model was based on the existing model with the bridge added. The existing n values of 0.045 in the channel and 0.05 in the overbanks were used for the proposed model. Since the 100-year floodplain is only 42.5 feet wide, it was decided that the bridge would span the 100-yr floodplain. The proposed bridge will be a Geosynthetic Reinforced Soil – Integrated Bridge System (GRS_IBS) bridge. It will have an opening of 45 feet measured from abutment face to abutment face. The bridge is located between HEC- RAS river stations 1378 and 1340. Figures 9, 10, and 11 show the profile slope and the water surface elevations along the stream as well as the water surface elevations at the upstream and downstream faces of the proposed bridge.
Figure 9. Stream Water Surface Profile
0 200 400 600 800
Dollar_Creek Plan: Proposed _June_PlacerCo_cfs Geom: Dollar_Creek_Proposed_Bridge_June2014
Main Channel Distance (ft)
E le v a ti o n ft)
Legend
WS 100-yr
WS 50-yr
WS 25-yr
WS 2-yr
Ground br1 HYD
Figure 10. Immediately Upstream Face of Proposed Bridge
Figure 11. Immediately Downstream Face of Proposed Bridge
0 50 100 150 200 250
Dollar_Creek Plan: Proposed _June_PlacerCo_cfs
Geom: Dollar_Creek_Proposed_Bridge_June2014
RS = 1374 BR
Station (ft)
E le va tio n ft)
Legend
WS 100-yr
WS 50-yr
WS 25-yr
WS 2-yr
1.0 ft/s
1.5 ft/s
2.0 ft/s
2.5 ft/s
3.0 ft/s
3.5 ft/s
4.0 ft/s
4.5 ft/s
Ground
Bank Sta
.05 .045 .05
0 50 100 150 200 250
Dollar_Creek Plan: Proposed _June_PlacerCo_cfs
Geom: Dollar_Creek_Proposed_Bridge_June2014
RS = 1374 BR
Station (ft)
El ev at io n (ft
Legend
WS 100-yr
WS 50-yr
WS 25-yr
WS 2-yr
0.4 ft/s
0.6 ft/s
0.8 ft/s
1.0 ft/s
1.2 ft/s
1.4 ft/s
1.6 ft/s
1.8 ft/s
2.0 ft/s
Ground
Bank Sta
.05 .045 .05
Table 1 below compares the existing and proposed water surface elevations and velocities just upstream of the bridge opening at cross section 1378. The bridge effectively has no impact on the stream hydraulics.
The subtle differences in parameter values are due to the additional cross sections incorporated at the bridge by the HEC-RAS model. The hydraulic model results can be seen in Appendix B.
Return Period Discharge
(cfs) Existing
WSEL (ft) Existing
Velocity (ft/s)
Proposed WSEL (ft)
Proposed
Velocity (ft/s)
2-yr 13 6530.06 5.32 6530.10 5.32
25-yr 105 6530.73 8.80 6530.74 8.80
50-yr 145 6531.06 9.70 6531.07 9.70
100-yr 270 6531.29 10.35 6531.31 10.35 Table 6 Comparison of Existing & Proposed Water Surface Elevations & Velocities (cross section 1378)
FREEBOARD
According to the Central Federal Lands’ Project Development and Design Manual (PDDM) (FHWA draft 2012) bridges should be designed to the 50-yr flood event and have 2 feet of freeboard. The freeboard for the proposed bridge for the 50-year event is approximately 4 feet and is 3.77 feet for the 100-yr event.
SCOUR
Scour depth is a result of long term degradation, pressure scour, contraction scour and abutment scour.
The stream channel is stable and does not show any signs of long term degradation. Pressure flow will not occur for the 100-year storm event and there is no contraction flow due to the bridge spanning the 100-year floodplain. The bridge will not adversely impact the flow and no scour will occur at the bridge for the design discharge.
INFILTRATION BASIN DESIGN
The Tahoe Regional Planning Agency (TRPA) requires best management practices (BMP)in regards to erosion control. The TRPA BMPclaculation spreadsheet was used to calculate the required infiltration basin size for the proposed trail parking lot. The basin calculator requires the hydraulic conductivity that is obtained from maps provided by TRPA. Based on the parking lot length and width a runoff value of 585 cfs was calculated. The proposed basin can accommodate 586.9 cfs . The spreadsheet can be seen in
Appendix C.
SUMMARY
The proposed bridge is designed to pass the 100-yr flood event without encroaching on the flow. The design will provide 3.77 feet of freeboard for the 100-yr event. No scour analysis is required due to the bridge spanning the 100-yr floodplain, no anticipated pressure flow and no apparent channel degradation.
The parking lot infiltration basin will accommodate an expected runoff volume of 585 cfs.
REFERENCES
Aquaveo (2014) Watershed Modeling System 9.1 (www.aquaveo.com).
FHWA (2007) “Project Development and Design Manual for Central Federal Lands Highway Division” Chp. 7.
Federal Highway Administration (FHWA).
NOAA Atlas 14, “Precipitation-Frequency Atlas of the United States”, Volume 6, Version 2.1: California, 2011, Revised 2012.
Hydrologic Engineering Center River Analysis System (HEC-RAS) Software”, USACE (2010) “US Army Corps of Engineers Version 4.1 build date 2010.
USGS “Methods for Determining Magnitude and Frequency of Floods in California, Based on Data through Water Year 2006”, Scientific Investigations Report 2012-5113, 2012.
http://www.aquaveo.com/
APPENDIX A
Hydrology
Approximate geographic boundaries for SCS rainfall distributions (SCS, 1986)
Project Location
NOAA Atlas 14 precipitation estimates at Dollar Creek Bridge Location
WMS TR-55 Hydrology Model 100-yr Peak Discharge Calculation
WMS TR-55 Hydrology Model 50-yr Peak Discharge Calculation
WMS TR-55 Hydrology Model 25-yr Peak Discharge Calculation
WMS TR-55 Hydrology Model 10-yr Peak Discharge Calculation
WMS TR-55 Hydrology Model 2-yr Peak Discharge Calculation
Placer County Times Series Distribution
Precipitation Depths for East of Sierra Nevada Crest
2-yr Design Event t (mins) Cumulative
Depth Incremental
Depth Rank
Re-ordered incremental depths
5 0.070 0.070 1 0.015
10 0.130 0.060 2 0.016
15 0.190 0.060 3 0.017
20 0.220 0.030 4 0.019
25 0.246 0.026 5 0.026
30 0.270 0.024 6 0.029
35 0.302 0.032 7 0.03
40 0.334 0.031 8 0.031
45 0.364 0.030 9 0.06
50 0.393 0.029 10 0.07
55 0.422 0.029 11 0.06
60 0.450 0.028 12 0.032
65 0.469 0.019 13 0.03
70 0.487 0.018 14 0.029
75 0.504 0.017 15 0.028
80 0.521 0.017 16 0.024
85 0.537 0.016 17 0.018
90 0.553 0.016 18 0.017
95 0.568 0.015 19 0.016
100 0.583 0.015 20 0.015 k= (log(d2/d1))/(log(t2/t1))
D= d1(t/t1)^k
Interpolation d1( inc d2 (inch) t1 (mins) t2(mins) K from 15 mins to 30 mins
0.19 0.27 15 30 0.50696 from 30 mins to 60 mins
0.27 0.45 30 60 0.736966 from 60 mins to 120 mins
.45 .64 60 120 0.508147
25-yr Design Event
Cumulative
Depth Incremental
Depth Rank
Re-ordered incremental depths
5 0.180 0.180 1 0.024
10 0.270 0.090 2 0.027
15 0.370 0.100 3 0.032
20 0.433 0.063 4 0.047
25 0.489 0.056 5 0.048
30 0.540 0.051 6 0.049
35 0.572 0.032 7 0.05
40 0.601 0.029 8 0.056
45 0.629 0.027 9 0.09
50 0.654 0.025 10 0.18
55 0.678 0.024 11 0.1
60 0.700 0.022 12 0.063
65 0.750 0.050 13 0.051
70 0.799 0.049 14 0.049
75 0.848 0.049 15 0.048
80 0.896 0.048 16 0.048
85 0.944 0.048 17 0.047
90 0.992 0.048 18 0.029
95 1.039 0.047 19 0.025
100 1.086 0.047 20 0.022
120 1.27 mins
0.37 0.54 15 30 0.545434 from 30 mins to 60 mins
0.54 0.7 30 60 0.374396 from 60 mins to
0.7 1.27 60 120 0.859402
50-yr Design Event
Cumulative
Depth Incremental
Depth Rank
Re-ordered incremental depths
5 0.2 0.2 1 0.032
10 0.3 0.1 2 0.034
15 0.42 0.12 3 0.037
20 0.487 0.067 4 0.04
25 0.546 0.059 5 0.059
30 0.6 0.054 6 0.067
35 0.675 0.075 7 0.069
40 0.748 0.073 8 0.073
45 0.818 0.071 9 0.1
50 0.887 0.069 10 0.2
55 0.954 0.067 11 0.12
60 1.02 0.066 12 0.075
65 1.060 0.040 13 0.071
70 1.098 0.038 14 0.067
75 1.135 0.037 15 0.066
80 1.170 0.035 16 0.054
85 1.204 0.034 17 0.038
90 1.238 0.033 18 0.035
95 1.270 0.032 19 0.033
100 1.302 0.031 20 0.031 mins
0.42 0.6 15 30 0.477322 from 30 mins to 60 mins
0.6 1.02 30 60 0.765535 from 60 mins to
1.02 1.42
60 120 0.508147
100-yr Design Event
Cumulative
Depth Incremental
Depth Rank
Re-ordered incremental depths
5 0.22 0.220 1 0.038
10 0.33 0.110 2 0.04
15 0.47 0.140 3 0.042
20 0.54 0.070 4 0.045
25 0.61 0.070 5 0.06
30 0.67 0.060 6 0.07
35 0.751 0.081 7 0.073
40 0.829 0.078 8 0.078
45 0.905 0.076 9 0.11
50 0.978 0.073 10 0.22
55 1.05 0.072 11 0.14
60 1.12 0.070 12 0.081
65 1.167 0.047 13 0.076
70 1.212 0.045 14 0.072
75 1.256 0.044 15 0.07
80 1.299 0.042 16 0.07
85 1.340 0.041 17 0.047
90 1.380 0.040 18 0.044
95 1.419 0.039 19 0.041
100 1.457 0.038 20 0.039 mins
.47 .67 15 30 0.477322 from 30 mins to 60 mins
.67 1.12 30 60 0.765535 from 60 mins to
1.12 1.6 60 120 .0514573
APPENDIX B
Hydraulics
Existing Condition Hec Ras Bridge Model
Proposed Condition HEC RAS Bridge Model Results
APPENDIX C
Infiltration Basin Calculations