CA-FLAP-SR89(1)_Truckee_River_Bridge_SSR_Addendum.pdf
PDF 2 MB Posted
- Attached to
- CA FLAP SR89(1), Truckee River Bridge Federal contract opportunity
- Solicitation number
- DTFH6816B00001
About this file
Truckee River Bridge Structures Report
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE TYPE SELECTION REPORT
ADDENDUM
Truckee River Bridge on State Route 89
BRIDGE NUMBER: 19-XXXX
FEDERAL PROJECT NUMBER: XXXX–XXXXXX
CALTRANS EXPENDITURE AUTHORIZATION: 03–3A7600
PREPARED FOR:
Tahoe Transportation District
P.O. Box 499 Zephyr Cove, Nevada 89448
PREPARED BY:
CH2M Hill
9193 S. Jamaica Street Denver, Colorado 80112
JANUARY 12, 2015
Structure Type Selection Report - Addendum January 12, 2015
Truckee River Bridge (Br. No. 19-XXXX)
Page i
TABLE OF CONTENTS
TABLE OF CONTENTS ..................................................................................................................................... i
INTRODUCTION
EXISTING CONDITIONS ................................................................................ Error! Bookmark not defined.
DESIGN CRITERIA
A. Bridge Design Standards--AASHTO, Caltrans, and Central Federal Lands
B. Environmental and/or Permit Requirements
C. Roadway Design Standards
D. Trail Design Standards
E. Preliminary Bridge Foundation Report and Seismic Study
F. Preliminary Bridge Hydraulic and Scour Study
G. Traffic
H. Utilities
I. Maintenance Issues
J. Construction Issues
PROPOSED BRIDGE ALTERNATIVES
A. Alternatives
B. Physical Constraints
C. Abutments and Retaining Wall Wingwalls
D. Structure Approach
E. Bents
F. Superstructure
G. Railings and Barriers
H. Aesthetics
I. Bridge Construction Estimate
PREFERRED AND RECOMMENDED ALTERNATIVE
REFERENCES
APPENDICES
Appendix A--General Plan and Foundation Plan Drawings
Appendix B-- General Plan Estimate
DATE: January 12, 2015
TO: Mr. Alfred Knotts
Tahoe Transportation District
FROM: John G. Rohner, P.E., Bridge Group Leader
Robert L. Luebbers, P.E., Senior Bridge Engineer
CH2M Hill
SUBJECT: State Route 89/Fanny Bridge Community Revitalization Project
STRUCTURE TYPE SELECTION REPORT - ADDENDUM
Truckee River Bridge on State Route 89 (Br. No. 19-XXXX)
PROJECT #'s: Federal Project Number: XXXX-XXXXXX
Caltrans Expenditure Authorization: 03-3A7600
INTRODUCTION
At the Project Development meeting held on September 16, 2015, the Stakeholders reconsidered a previous decision and asked the Project Team to investigate bridge alternatives for the new Truckee River Bridge that would accommodate pedestrian/bicycle paths under the proposed bridge on both sides of the Truckee River.
The previously submitted Structure Type Selection Report, by Wood Rodgers dated April 18, 2014, only considered bridge alternatives that accommodated the Tahoe Rim Trail on the east side of the Truckee River.
This Addendum has been prepared to include new alternatives for the proposed bridge that will accommodate the paths on both sides of the river.
The Type, Size, and Location (TS&L) Sheets are included in Appendix A.
Project Site
Project Site—Tahoe City, CA New Truckee River Bridge on SR-89
N New Bridge
DESIGN CRITERIA
A. Bridge Design Standards--AASHTO, Caltrans, and Central Federal Lands
See Structure Type Selection Report for a description of the Bridge Design Standards.
B. Environmental and/or Permit Requirements
See Structure Type Selection Report for a description of the Environmental Permit Requirements.
C. Roadway Design Standards
See Structure Type Selection Report for a description of the Roadway Design Standards.
D. Trail Design Standards
The Tahoe Rim Trail will traverse under the new bridge on the eastern shore. The Truckee River Trail will pass under the new bridge on the western shore. A vertical clearance of 12 feet minimum between both trails and the soffit of the bridge will be provided with a clear width of 14 feet minimum under the bridge.
E. Preliminary Bridge Foundation Report and Seismic Study
The Preliminary Foundation Report, by Wood Rodgers dated April 2, 2014, that was prepared for the new Truckee River Bridge is a companion document to this Structure Type Selection Report. The report provided both foundation and seismic recommendations. The Final Foundation Report will be prepared at a later date.
The following recommendations for the new bridge alternatives have been extrapolated from the Preliminary
Foundation Report.
• Either spread footings or deep pile foundations are permissible for all of the proposed substructure elements.
• Deep pile foundations types include Caltrans Standard Plan precast prestressed concrete or steel driven piles with pile caps, large diameter cast-in-drilled-hole (CIDH) piles, or large diameter cast-in-steel-shell (CISS) piles.
• A seismic design response spectrum for the project has been selected based on the requirements of the Caltrans Seismic Design Criteria. The spectrum is included in Appendix A of the foundation report.
• At the abutment on the west side of the river there is a potential for liquefaction in the upper 8 feet of the surface strata. No liquefaction potential has been identified below that depth.
• Foundation design has to account for scour conditions as discussed in the following Section.
• Rockery walls will be supported as gravity walls on spread foundation.
After assessing the different alternatives, spread footings are the most feasible foundation type. These will be explained further in the Final Foundation Report.
F. Preliminary Bridge Hydraulic and Scour Study
The Preliminary Bridge Hydraulic Study, by Wood Rodger dated April 18, 2014, and a more recent Addendum, prepared by CH2M Hill dated January 12, 2015, are companion documents to this Structure Type Selection
Report. One important note regarding flow in the Truckee River is that the flow is completely regulated by releases from the Lake Tahoe Dam. This is explained in more detail in the hydraulic study. Following is a summary of that study:
Caltrans requirement for freeboard is 2 feet minimum clearance to the flood of record. The provided freeboard of 9.83 feet exceeds the minimum.
See Structure Type Selection Report for a discussion of Scour Issues.
Even though there is no scour anticipated at the abutments, consideration may be given during final design of the project to include RSP at the face of abutments. Based on the D50 rock size of 17.1 inches from the hydraulic study, a "Light Class" RSP will be sufficient.
G. Traffic
Construction of the proposed new bridge should have minimal impact on SR-89 traffic since the structure is not a part of the current highway alignment. The construction of the bridge abutments will interrupt bicycle and pedestrian traffic on the Tahoe Rim Trail and the Truckee River Bike Trail.
H. Utilities
No utilities will be supported by the proposed bridge, however, the bridge may be designed with openings to accommodate future utilities.
I. Maintenance Issues
See Structure Type Selection Report for a description of Maintenance Issues.
J. Construction Issues
See Structure Type Selection Report for a discussion of Construction Issues.
Hydrologic and Hydraulic Summary
Drainage Area: 505 Square Miles
Design Flood (Q50) Base Flood (Q100) Overtopping Flood /
Flood of Record
Frequency (years) 50-yr 100-yr 500-yr
Discharge (cfs) 2,690 3,350 4,350
Velocity (ft/sec) 3.14 3.52 4.02
Water Surface Elevation at Proposed Truckee River Bridge (feet, NGVD 29)
6224.18 6224.82 6225.80
Flood plain data are based upon information available when the plans were prepared and are shown to meet federal requirements. The accuracy of said information is not warranted by the Tahoe Transportation District, Central Federal Lands, State, and County and interested or affected parties should make their own investigation.
Bridge Freeboard Results
Bridge
WSE
(feet, NGVD 29)
Minimum Soffit Elevation
(feet, NGVD 29) Freeboard (feet)
New Truckee River Bridge
6224.18 6234.01 9.83
PROPOSED BRIDGE ALTERNATIVES
A. Alternatives
The proposed alternatives evaluated in this Addendum include a three span precast concrete bulb tee beam and reinforced concrete slab bridge on reinforced concrete abutments and piers, a single span precast concrete bulb tee beam bridge on reinforced concrete cellular abutments, and a single span precast concrete deck bulb tee beam bridge on reinforced concrete cellular abutments.
Alternative 1 – This bridge consists of three spans at 19’-0”, 136’-0” and 19’-0” for an overall bridge length of 174’-0”. The short end spans over the trails are reinforced concrete slabs. The center span over the Truckee River is precast concrete bulb tee beams with an 8” composite concrete deck. Because of the large difference is span lengths and structure depths between the center span and the end spans, the spans are all designed as simple spans with expansion joints located at the piers. A 1” polymer concrete overlay will be placed on top of the bridge deck to serve as a wearing surface and to provide additional protection for the reinforced concrete deck.
Alternative 2 – This bridge consists of cellular abutments with a single span of 135’-0” over the Truckee River.
The cellular abutments are each 17’-6” in length for an overall bridge length of 170’-0”. The span over the Truckee River is precast concrete bulb tee beams with an 8” composite concrete deck. For similar reasons as stated above, the center span over the river will be designed as a simple span with expansion joints at each end.
A 1” polymer concrete overlay will be placed on top of the bridge deck to serve as a wearing surface and to provide additional protection for the reinforced concrete deck.
Alternative 3 – This bridge consists of cellular abutments with a single span of 98’-0” over the Truckee River.
The cellular abutments are each 17’-6” in length for an overall bridge length of 133’-0”. The span over the Truckee River is precast concrete deck bulb tee beams with a 5” non-composite concrete deck. As stated above, the center span will be designed as a simple span with expansion joints at each end. A 1” polymer concrete overlay will be placed on top of the bridge deck to serve as a wearing surface and to provide additional protection for the reinforced concrete deck.
The single span precast concrete deck bulb tee beam bridge is the preferred and recommended bridge alternative of this Addendum to the Structure Type Selection Report.
B. Physical Constraints
The new Truckee River Bridge must accommodate the Truckee River, the Tahoe Rim Trail on the eastern shore, and the Truckee River Trail on the western shore. The minimum bridge width is 46’-9" at Abutment 1 (east end) and increases/flares in width near the abutment on the west end. The width accommodates two 12’-0” lanes with an 8’-0”striped median. The eastbound lane has a 2’-7½“ shoulder and a 1’-9” concrete barrier. The westbound lane has a 2’-0” shoulder, a 6’-7 ½” sidewalk and a 1’-9” concrete barrier. The sidewalk on the new bridge will allow for the expansion of sidewalks along Route 89 at some point in the future.
The SR-89 profile along the bridge has been set to provide a minimum vertical clearance of 12 feet between the trails and the soffit of the bridge. The span arrangement and cellular abutments were selected to provide a minimum clear width of 14 feet along the trails. The 12 foot vertical by 14 foot horizontal opening is also large enough to accommodate maintenance and emergency vehicles that may occasionally need to use the trails. The bridge is also required to provide a minimum of 2 feet of freeboard above the 50 year flood/flood of record.
C. Abutments and Wingwalls
Two types of abutments are proposed for these alternatives. The three span alternative uses traditional reinforced concrete cantilever abutments supported on either spread footings or piles. The single span alternatives both use a reinforced concrete cellular abutment that accommodates the pedestrian trail. The cellular abutment is similar to a box culvert but it includes a beam seat to support the girders over the river. The box structure is sized to accommodate the pedestrian trail. The wall along the river has large openings to provide a more open feeling and views of the river. The foundation of the cellular abutment is a spread footing. A cut-off wall will be constructed along the river to prevent scour from undermining the cellular abutments.
Rockery retaining walls will be used as wingwalls at the four corners of the new bridge and along the Truckee River Trail on the western shore.
D. Structure Approach Slab
Structure Approach Slab Type EQ(10) will be used at each abutment. Structure approach and abutment drainage will consist of geocomposite drain and weep holes. The approach slabs, geocomposite drains and weep holes will be in accordance with Caltrans standard details.
E. Piers
For the three span alternative, Pier 1 and Pier 2 consist of a cast-in-place concrete cap supported by three 48 inch diameter cast-in-place concrete columns and CISS piles.
F. Superstructure
The preferred superstructure consists of precast concrete deck bulb tee beams with a 5” non-composite concrete deck. A 1” polymer concrete overlay will be placed as the wearing surface on top of the concrete deck. A concrete cover of 2½ inches to deck reinforcement and epoxy coated reinforcement will be provided to ensure the longevity of the bridge deck. Expansion joints will be placed at the ends of the simple span over the river.
Snow plow deflectors will be installed at the bridge deck expansion joints.
G. Railings and Barriers
See Structure Type Selection Report for a discussion of Railings and Barriers.
H. Aesthetics
See Structure Type Selection Report for a discussion of Aesthetics.
I. Bridge Construction Estimate
Material quantities were computed in accordance with Bridge Design Aids Manual Section 11. Unit prices were determined by referencing current bid tabulations from recent Caltrans bid openings and by using the Caltrans online contract cost database. The estimated construction cost of the bridge (including time related overhead, mobilization, and 20% contingency) is $2,560,000. Refer to Appendix B for the General Plan Estimate sheet.
PREFERRED AND RECOMMENDED ALTERNATIVE
As previously noted, the preferred and recommended bridge alternative is Alternative 3, the single span precast concrete deck bulb tee beam bridge:
RECOMMENDED BRIDGE TYPE
Bridge Name
Bridge Type Bridge Number
Width /
Depth Length Cost Comments
Truckee River Bridge
Single Span Precast Concrete Deck Bulb Tee Beam Bridge
19-XXXX
46’-9”/ 3'-11"
133’-0" $2,560,000
Less Environmental Impact and
Accelerated Bridge Construction
REFERENCES
1. Caltrans, Advance Planning Study (APS)--New Truckee River Bridge (Approval Letter), February 20, 2013
2. Wood Rodgers, Advance Planning Study--Design Memo (New Truckee River Bridge), December 17, 2013.
3. Wood Rodgers, Preliminary Foundation Report, April 18, 2014.
4. Wood Rodgers, Preliminary Bridge Hydraulic Study, April 18, 2014.
5. Wood Rodgers, Structure Type Selection Report, April 18, 2014.
APPENDICES
Appendix A-- Type, Size, and Location (TS&L) Drawing and Checklist
Appendix B-- General Plan Estimate
APPENDIX A --
TYPE, SIZE, AND LOCATION (TS&L) DRAWINGS
column (typ.)
3'-0" square
Location
Bridge
(typ.)
14'-0" ty p m in
17'-6"98'-0"17'-6"
Length of Bridge = 133'-0"
46'-9" min. & varies
126'-4 " min. & varies"2
120'-4
45°0'0"
45°0'0"
1'-9"
Lane
12'-0"
8'-0"
Lane
12'-0"
Shld.
"2 12'-7
2'-0" Shdl.
1'-9"
Sidewalk
"2 16'-7
(typ.)
10'-9" min.
El. 6234.01
Low chord
S
Y T
IM
E
D G
N S
P E
C
G E
O M
E T
R I C
S
TYPICAL ROADWAY SECTION
SUPER ROTATED ABOUT
RATE
RATESTA.
CROWN
PROFILE GRADE DIAGRAM
EL. ARE AT GRADE
AT
H Y
D R
A U
L I C
S
Q2
50Q
Q
Q
Q Vm WS EL.
REMARKS
SLOPE PROTECTION TYPE:
TOP EL.:
CLASS:
BOTTOM EL.:
DEPTH:
SLOPE:
S C
O U
R
SCOUR
REMARKS
RECEIVED
RECEIVED
HYDRAULICS REPORT NO.
GEOTECHNICAL REPORT NO.
D E S I G
N D
A T
A
TYPICAL BRIDGE SECTION
OVERLOADLIVE LOAD SPECIAL LOADS
SUPERSTRUCTURE
CONCRETE F'C
EPOXY REINFORCEMENT
RAIL
SIDEWALKS
REMARKS
DRAINS
TRANSITION
UTILITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION, DENVER, COLORADO
PRELIMINARY LAYOUT
STREAM NAMEBRIDGE NAME
ROUTE NAME AND NUMBER
FOREST/PARK/OTHERCOUNTYSTATE
ACCOUNT NO.
PREPARED BY
SCALE: DATE:
ESTIMATED STRUCTURE COST
RG NO.
PLAN
ELEVATION
STA.
ft/ft ft/ft ft/ft
Truckee River Bridge Truckee River
CA State Route 89
PlacerCalifornia
1" = 40'-0"
"B" Line
-2%-2%
P.G.L.
ground @ "B" Line
Approx. existing
"B" Line
Profile
See Typical Bridge Section
6224.2
6224.8
T r u c k e e R iv e r
PI 213+53.61
R = 165.00'
T = 62.22'
Curve = B-2
L = 118.99'
P C
.3
Ordinary high water
N 65°09'02" W
P T
.6
Rockery wall (typ.)
+6.202%V P
T S ta
V P I S ta
E l.
.2
E l.
.5
+2.00%
ABUT. 1
2%
ABUT. 2
Q Q100 50
B e g in B r id g e
E n d B r id g e
C W a ll
L C W a ll
LE
l.
.4
S ta
.0
E l.
.3
S ta
.0
E l.
.0
S ta
.5
E l.
.7
S ta
.5
+2.00%
"BK-4" Line
"BK-1" Line
"B" Line slab (typ.)
10'-0" Approach
6222.78 6221.08
John Rohner
6'-0" Wide N/A 12" Waterline
Peak ground acceleration (pga): 0.161 g
Caltrans ST-80
All superstructure reinforcing
Cast-in-place: 4500 psi
HL-93 N/A N/A
Riprap
Scour & slope protection to be evaluated in detail during final design.
4350 6225.8
3.11
3.52
4.02
Roadway Guardrail W-beam transition railing to vertical face
Water surface elevations are taken upstream of the structure.
January, 2015 bridge railing
Caltrans ST-80
E E
Note: Construct along vertical curve
2%
Roadway Guardrail (typ.)
topping
5" cast-in-place bulb tee girder
PC/PS 42" deck
PC/PS 42" deck bulb tee
0.02
$2,560,000
ALTERNATIVE 3
column (typ.)
3'-0" square
Location
Bridge ty p m in
(typ.)
14'-0"
17'-6"135'-0"17'-6"
Length of Bridge = 170'-0"
46'-9" min. & varies
126'-4 " min. & varies"2
120'-4
(typ.)
11'-7" min.
45°0'0"
45°0'0"
El. 6233.64
Low chord
S
Y T
IM
E
D G
N S
P E
C
G E
O M
E T
R I C
S
TYPICAL ROADWAY SECTION
SUPER ROTATED ABOUT
RATE
RATESTA.
CROWN
PROFILE GRADE DIAGRAM
EL. ARE AT GRADE
AT
H Y
D R
A U
L I
Q
Q
Q Vm WS EL.
REMARKS
SLOPE PROTECTION TYPE:
TOP EL.:
CLASS:
BOTTOM EL.:
DEPTH:
SLOPE:
S C
O
RECEIVED
RECEIVED
HYDRAULICS REPORT NO.
GEOTECHNICAL REPORT NO.
D E S I G
N D
A T
A
TYPICAL BRIDGE SECTION
OVERLOADLIVE LOAD SPECIAL LOADS
SUPERSTRUCTURE
CONCRETE F'C
EPOXY REINFORCEMENT
RAIL
SIDEWALKS
REMARKS
DRAINS
TRANSITION
UTILITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION, DENVER, COLORADO
PRELIMINARY LAYOUT
STREAM NAMEBRIDGE NAME
ROUTE NAME AND NUMBER
FOREST/PARK/OTHERCOUNTYSTATE
ACCOUNT NO.
PREPARED BY
SCALE: DATE:
ESTIMATED STRUCTURE COST
RG NO.
PLAN
ELEVATION
STA.
ft/ft ft/ft ft/ft
TRUCKEE RIVER BRIDGE TRUCKEE RIVER
CA State Route 89
PlacerCalifornia
1" = 40'-0"
"B" Line
Profile
See Typical Bridge Section
Rockery wall (typ.)
Ordinary high water
+6.202%V P
T S ta
V P I S ta
E l.
.2
E l.
.5
+2.00%
P T
.6
P C
.3
N 65°09'02" W
"B" Line
T r u c k e e R iv e r
PI 213+53.61
R = 165.00'
T = 62.22'
Curve = B-2
L = 118.99'
ABUT. 1 ABUT. 2
ground @ "B" Line
Approx. existing
2%
E n d B r id g e
E l.
.1
S ta
C W a ll
L E l.
.7
S ta
.5
B e g in B r id g e
E l.
.7
S ta
C W a ll
L E l.
.0
S ta
.5
+2.00%
"B" Line
P.G.L.
-2% -2%
Roadway Guardrail
E E
2% bridge railing
Caltrans ST-80
Roadway Guardrail (typ.)
"BK-1" Line
"BK-4" Line slab (typ.)
10'-0" Approach
Riprap
Water surface elevations are taken upstream of the structure.
Scour & slope protection to be evaluated in detail during final design.
HL-93 N/A N/A
Cast-in-place: 4500 psi
All superstructure reinforcing
Caltrans ST-80
6'-0" Wide
Peak ground acceleration (pga): 0.161 g
N/A 12" Waterline
W-beam transition railing to vertical face
0.02
John Rohner
January, 2015
PC/PS 54" bulb tee
$2,828,000
ALTERNATIVE 2
19'-0"136'-0"19'-0"
Length of Bridge = 174'-0"
(typ.)
14'-0" ty p m in
Location
Bridge
46'-9" min. & varies
126'-4 " min. & varies"2
120'-4
(typ.)
12'-0" column (typ.)
4'-0" dia.
45°0'0"
45°0'0"
El. 6232.38
Low chord
S
Y T
IM
E
D G
N S
P E
C
G E
O M
E T
R I C
S
TYPICAL ROADWAY SECTION
SUPER ROTATED ABOUT
RATE
RATESTA.
CROWN
PROFILE GRADE DIAGRAM
EL. ARE AT GRADE
AT
H Y
D R
A U
L I
Q
Q
Q Vm WS EL.
REMARKS
SLOPE PROTECTION TYPE:
TOP EL.:
CLASS:
BOTTOM EL.:
DEPTH:
SLOPE:
S C
O
RECEIVED
RECEIVED
HYDRAULICS REPORT NO.
GEOTECHNICAL REPORT NO.
D E S I G
N D
A T
A
TYPICAL BRIDGE SECTION
OVERLOADLIVE LOAD SPECIAL LOADS
SUPERSTRUCTURE
CONCRETE F'C
EPOXY REINFORCEMENT
RAIL
SIDEWALKS
REMARKS
DRAINS
TRANSITION
UTILITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION, DENVER, COLORADO
PRELIMINARY LAYOUT
STREAM NAMEBRIDGE NAME
ROUTE NAME AND NUMBER
FOREST/PARK/OTHERCOUNTYSTATE
ACCOUNT NO.
PREPARED BY
SCALE: DATE:
ESTIMATED STRUCTURE COST
RG NO.
PLAN
ELEVATION
STA.
ft/ft ft/ft ft/ft
ABUT. 1 PIER 1 PIER 2 ABUT. 2
B e g in B r id g e
C P ie r
L
+2.00%
T r u c k e e R iv e r
P C
.3
P T
.6
"B" Line
TRUCKEE RIVER BRIDGE TRUCKEE RIVER
CA State Route 89
PlacerCalifornia
1" = 40'-0" ground @ "B" Line
Approx. existing
C P ie r
L E n d B r id g e
E l.
.6
S ta
E l.
.0
S ta
E l.
.7
S ta
E l.
.1
S ta
"B" Line
Profile
+6.202%V P
T S ta
V P I S ta
E l.
.2
E l.
.5
See Typical Bridge Section
Rockery wall (typ.)
Ordinary high water
2%
PI 213+53.61
R = 165.00'
T = 62.22'
N 65°09'02" W
Curve = B-2
L = 118.99'
+2.00%
"B" Line
P.G.L.
-2% -2%
Roadway Guardrail (typ.)
"BK-4" Line
"BK-1" Line
Roadway Guardrail bridge railing
Caltrans ST-80
Riprap
Water surface elevations are taken upstream of the structure.
Scour & slope protection to be evaluated in detail during final design.
0.02
HL-93 N/A N/A
Cast-in-place: 4500 psi
All superstructure reinforcing
Caltrans ST-80
6'-0" Wide
Peak ground acceleration (pga): 0.161 g
N/A 12" Waterline
W-beam transition railing to vertical face
PC/PS 54" bulb tee
2%E E
John Rohner
January, 2015
E E E E slab (typ.)
10'-0" Approach
$2,922,000
ALTERNATIVE 1
APPENDIX B --
GENERAL PLAN ESTIMATE
CH2M HILL Opinion of Probable Construction Cost Project: Truckee River Bridge Project Design: S. Mensah Subject: Relocated SR-89 over Truckee River Date: 1/12/2015
Structure: Span Configuration - 19'-0", 136'-0", 19'-0" Alternative 1: 3-span Bridge w/Abutment Walls
Cost Estimate Bid Item Number Item Description Unit Quantities Unit Price Cost
15214-1000 Survey and Staking, Bridge LS 1 8,000.00$ 8,000$
20801-0000 Structure Excavation CY 1,648 140.00$ 230,720$
20803-0000 Structural Backfill CY 2,225 140.00$ 311,500$
55101-2200 Steel Pipe Piles, In Place LF 1,440 150.00$ 216,000$
55201-0200 Structural Concrete, Class A (AE) CY 565 850.00$ 480,250$
55301-1700 Precast, Prestressed Concrete Bulb Tee Girder, 54" LF 816 350.00$ 285,600$
55401-1000 Reinforcing Steel LB 61,316 1.50$ 91,974$ 55401-2000 Reinforcing Steel, Epoxy Coated LB 95,985 2.50$ 239,963$
55503-0000 Bridge Expansion Joints LF 189 175.00$ 33,075$
55601-0600 Bridge Railing, Concrete, Beam Rail LF 392 600.00$ 235,200$
56501-0600 Drilled Shafts, 48-Inch Diameter LF 240 780.00$ 187,200$
57903-0000 Concrete Overlay SY 556 150.00$ 83,400$
61707-0000 Structure Transition Railing LF 80 400.00$ 32,000$
Subtotal = 2,434,882$ Structure Width = 47.24 ft. 20% Contingency = 486,976$
Structure Length = 174.00 ft. Total = 2,922,000$
Total Deck Area = 8,220 Sq. ft. Cost/Sq.ft. = 355$
Truckee River Bridge - Alternative 1- Abutment Wall_Rev1.xlsx 1/12/2015
Subject: Relocated SR-89 over Truckee River Date: 1/12/2015
Structure: Span Configuration - 17'-6", 135'-0", 17'-6" Alternative 2 - Culverts
Cost Estimate Bid Item Number Item Description Unit Quantities Unit Price Cost
15214-1000 Survey and Staking, Bridge LS 1 8,000.00$ 8,000$
20801-0000 Structure Excavation CY 1,417 140.00$ 198,380$
20803-0000 Structural Backfill CY 1,423 140.00$ 199,220$
55201-0200 Structural Concrete, Class A (AE) CY 999 800.00$ 799,200$
55301-1700 Precast, Prestressed Concrete Bulb Tee Girder, 54" LF 810 350.00$ 283,500$
55401-1000 Reinforcing Steel LB 171,028 1.50$ 256,542$ 55401-2000 Reinforcing Steel, Epoxy Coated LB 94,434 2.50$ 236,085$
55503-0000 Bridge Expansion Joints LF 189 175.00$ 33,075$
55601-0600 Bridge Railing, Concrete, Beam Rail LF 384 600.00$ 230,400$
57903-0000 Concrete Overlay SY 534 150.00$ 80,100$
61707-0000 Structure Transition Railing LF 80 400.00$ 32,000$
Subtotal = 2,356,502$ Structure Width = 47.17 ft. 20% Contingency = 471,300$
Structure Length = 170.00 ft. Total = 2,828,000$
Total Deck Area = 8,019 Sq. ft. Cost/Sq.ft. = 353$
Truckee River Bridge - Alternative 2- Culverts_Rev1.xlsx 1/12/2015
Subject: Relocated SR-89 over Truckee River Date: 1/12/2015
Structure: Span Configuration - 17'-6", 98'-0", 17'-6" Alternative 3 - Culverts
Cost Estimate Bid Item Number Item Description Unit Quantities Unit Price Cost
15214-1000 Survey and Staking, Bridge LS 1 8,000.00$ 8,000$
20801-0000 Structure Excavation CY 1,408 140.00$ 197,120$
20803-0000 Structural Backfill CY 1,414 140.00$ 197,960$
55201-0200 Structural Concrete, Class A (AE) CY 878 800.00$ 702,400$
55301-2400 Precast, Prestressed Concrete Decked Bulb Tee Girder, 42" LF 784 400.00$ 313,600$
55401-1000 Reinforcing Steel LB 171,028 1.50$ 256,542$ 55401-2000 Reinforcing Steel, Epoxy Coated LB 58,121 2.50$ 145,303$
55503-0000 Bridge Expansion Joints LF 187 175.00$ 32,725$
55601-0600 Bridge Railing, Concrete, Beam Rail LF 310 600.00$ 186,000$
57903-0000 Concrete Overlay SY 409 150.00$ 61,350$
61707-0000 Structure Transition Railing LF 80 400.00$ 32,000$
Subtotal = 2,133,000$ Structure Width = 46.80 ft. 20% Contingency = 426,600$
Structure Length = 133.00 ft. Total = 2,560,000$
Total Deck Area = 6,224 Sq. ft. Cost/Sq.ft. = 411$
Truckee River Bridge - Alternative 3- Culverts_Rev1.xlsx 1/12/2015
| CA-FLAP-SR89(1)_Truckee River Bridge_SSR Addendum |
| TSL_Truckee_12.pdf |
| TSL_Truckee_12 |
| TSL_Truckee_11.pdf |
| TSL_Truckee_11 |
| TSL_Truckee_10.pdf |
| TSL_Truckee_10 |
File details come from the government source that posted it. Updated .