CA_FLAP_10089(1)_Option_Y_Plans.pdf
PDF 47 MB Posted
- Attached to
- CA FLAP SR89(1), Truckee River Bridge Federal contract opportunity
- Solicitation number
- DTFH6816B00001
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
U.S. CUSTOMARY
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment curve delta centerline jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
Wattle
Temporary Inlet Protection
Stabilized Construction Entrance
Silt Fence
Sediment Log
EROSION & SEDIMENT CONTROL SYMBOLS
Riprap
Erosion Control Mat
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
Dollar Creek Trail
CA FLAP 10089(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
U.S. CUSTOMARY
Sheet 2 of 2
A3
Transition Apron
Tree to be Removed
Temporary Hammerhead Turnaround
Boulders
Tree stump
Trees Snag (standing dead tree)
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
MISCELLANEOUS SYMBOLS
See Note 4 4
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C A .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created 9/10/14 br
A4
SURVEY CONTROL
Sheet 1 of 2
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\ s r C o n tr o lS h e e t.
d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created 9/10/14 br Sheet 2 of 2
SURVEY CONTROL
A5
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\ s r C o n tr o lS h e e t.
d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\
S T
E
C A .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
Dollar Creek Trail
CA FLAP 10089(1)
R
ES
ER
V O
IR
F D
S E
C
C O
R
F D
C O
R
R
S E
A R
C H
E D
F
R
N
T H
IN
G
U N
D
P E
R
R S
F D
B A
L S
P
R
R S
F D
B A
R
F D
B A
R
P
H
M A P
S
P
M A P
S
F D
S E
C
C O
R
F D
B A
R
P E
R
R S
F D
B A
R
P E
R
R S
N
T
D
O L L
A R
D H
H E
R
IZ
O N
T
V
R T
IC
A L
V A L
U E S
G
IV
U S
E D
R S
T A
B L
IS
C A T
IO
N
P
K
M A P
S
N
E
C A T E
D
O N
Y
R G
E E S
W E
O
IN
E A
G R
O U
IN
L Y
E
C A T E
D
IN
T
E A
P
P G
F D
X
N C
R E
T E
H
IG
H W
Y
M
N U
M E
N T
N .T .P .U .D
S T
A
S T
A
N .T .P .U .D
N .T .P .U .D
N .T .P .U .D
H
IG
H L
A N
IL
L A
G E
N .T .P .U .D
S T A
S T A
S T A
S T A
S T A
S T A
S T A
S T A
24"D
24"D
"D
ELEC ELEC
COUNTRY CLUB DRIVE
F U
L T
E S
C E
N T
H
M A P
S
LYNWOOD DRIVE
H
M A P
S
P L
A C
U N
T Y
I- M
A P
S
S
IE
R
C
IF
IC
P O
W
G
M A P
S
F D
B
R
I-
M A P
S
Scale in Feet
10'
20'
Easement
New Fence (At approx. same location as exist. fence)
Proposed Dollar Creek Trail CL
N o rth L a k e B lv d
D o ll a r
C re e k
D o ll a r
C re e k
F a b ia n W a y
W a ts o n D r iv e
M a r ti n D r iv e
C e d a r w o o d D r iv e
P o la r is R o a d
P o la ri s R o a d
Village Road
Country Club Drive
H ig h la n d s D r iv e
Dinah Road
Forrest Road
Sum m it Road
Old County Road
F u lt o n C r e s c e n t
D r
Dr iv e
L y n w o o d
Beaumont Road ig h w a y
M a r in o W a y
B e a u m o n t
R o a d
R u m a r W a y
W a y
D o v e
La Crosse Drive ld C o u n tr y R oa d
D o ll a r
D ri v e
O b se rv a tio n D riv e
Dollar Creek Reservoir
SITE MAP
A6
NO SCALE
5.3 miles to Tahoe Vista, CA
City, CA to Tahoe
2.9 miles
40+00
90+
0+
130+00
Dollar Creek Reservoir
(Proposed parking lot) Potential staging area
Beverly Drive access point Potential construction
48+65 to 49+15 Pedestrian Bridge Dollar Creek
Potential staging area
Station 10+52.00
Shared-Use Path
Dollar Creek
Begin Project
Option Y
Station 129+42.00
Shared-Use Path
Dollar Creek
End Project
Option Y
Station 206+47.52
Approach Rd
End Parking Lot and
Option Y
Station 200+00.00
Approach Rd
Begin Parking Lot and
Option Y
NO SCALE
NOTE:
2.
2.
first asphalt lift)
(applied prior to
Prime coat
TYPICAL SECTION
5'5'
Subgrade
7'
Subgrade
7'
(Varies)
Cut slope
(Varies)
Fill slope
2' 2'
See Detail A
1.8%1.8%
Existing ground limit stake
Slope
A7
30° - 35°
Clearing and construction limits
Topsoil andTopsoil and
Path Width
Station to Station
LENGTH OF PROJECT
(ft)
Bridge
Shared Use Path
Driveway and Parking
Detail A
1' concrete pavement
Hot asphalt
0.00
50.00
PROJECT TOTAL (mi)
TOTALS (ft) 12,487.52
647.52
11,840
2.37
Cut
CL
14'
Existing ground
V e r ti c a l
C le a r a n c e
Limits
Turf Establishment
Limits
Turf Establishment
(ft)
Trail
3" Hot asphalt concrete pavement roadway) to both right and left sides of roadway aggregate (Detail applies
(safety edge) Shoulder up with
Construct 30° - 35° pavement edge
Proposed trail
(applies to trees and shrubs)
TYPICAL SECTION
TRAIL CLEARING
3.
2.
2.
first asphalt lift)
(applied prior to
Prime coat
TYPICAL SECTION
4'4'
Subgrade
6'
Subgrade
6'
(Varies)
Cut slope
(Varies)
Fill slope
2' 2'
See Detail A
1.8%1.8%
Existing ground limit stake
Slope
Clearing and construction limits
Topsoil andTopsoil and
Path Width
127+81 to 129+42
Limits
Turf Establishment
Limits
Turf Establishment
3" Hot asphalt concrete pavement
1.8%1.8%
3.
127+70 to 127+81 transitions to 8' from
200+00.00 to 206+47.52
10+52.00 to 129+42.00
TYPICAL SECTION
5'
1:4 1:4
3" Hot asphalt concrete pavement
1.8% first asphalt lift)
(applied prior to
Prime coat
9+87 to 9+97 and 11+36 to 11+42
Trail Connections
4.
3.
2.
1.
4.
and the existing trail on the south side of Hwy 28.
Pave up to existing asphalt at the bus stop on the north side clearing limits
Some trees and vegetation noted to remain within
Retain plants along cut and fill slopes when possible.
See the cross sections for cut and fill slope ratios.
and to avoid trees or rock outcroppings.
adjusted by the CO to ensure adequate drainage, stability
The excavation and embankment slope ratios may be grading C or D
6" Aggregate base grading C or D
6" Aggregate base, 6" Aggregate base grading C or D base
Aggregate
Existing ground limit stake
Slope limit
Slope
Item 20101-0000.
Section 201. Paid under shrubs. See SCR
Trim branches and
Item 20101-0000.
Section 201. Paid under shrubs. See SCR
Trim branches and
2.
2.
first asphalt lift)
(applied prior to
Prime coat
TYPICAL SECTION
6'6'
Subgrade
8'
Subgrade
8'
(Varies)
Cut slope
(Varies)
Fill slope
2' 2'
See Detail A
1.8%1.8%
Existing ground limit stake
Slope
Clearing and construction limits
Topsoil andTopsoil and
Path Width
Limits
Turf Establishment
Limits
Turf Establishment
3" Hot asphalt concrete pavement
1.8%1.8%
3.
grading C or D
8" Aggregate base limit
Slope
18+34 to 21+20
OPTION Y
MULTI-USE PATH
TYPICAL SECTIONS
1.8%* 1.8%* within Caltrans ROW from 10+52 to 11+40.
* Shoulder slope is 2% away from pavement
21+20 to 127+81
10+52 to 18+34
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C A .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
NO SCALE
NOTE:
2' limit stake
Slope
2'
2.2. Fill slope Fil
l s lop e
Clearing and construction limits
Topsoil andTopsoil and See Plan details structural section typical section for
See mainline trail (varies)
Existing unpaved
1:5 max (fill)
1:5 max (cut)
Transition apron
Transition apron ground
Existing 2' 2' ground
Existing
A8 both right and left sides of roadway) aggregate base (Detail applies to
(safety edge) Shoulder up with
Construct 30° - 35° pavement edge
30° - 35°
See Detail A first asphalt lift)
(applied prior to
Prime coat asphalt lifts)
(applied between
Tack coat
Detail A varies varies concrete pavement
Hot asphalt
(See Plan Sheets for Locations)
Transition Apron
TYPICAL SECTION
Limits
Turf Establishment
Limits
Turf EstablishmentVaries (10 ft to 65 ft)Varies (10 ft to 65 ft)
(Placed in 2 lifts)
3" Hot asphalt concrete pavement
1:1 m ax
Cut slope
1:1 m ax
Fill slope ground
Existing
Roadway
Existing Ground
Temporary Hammerhead Turnaround
TYPICAL SECTION
Proposed Trail
20' max.
Turnaround
Hammerhead
Temporary
28' R (Max.)
Temporary Hammerhead Turnaround
PLAN VIEW
3.
20' max.
3" - 6" crushed aggregate asphalt lift)
(applied to top
Fog seal turf upon removal of turnaround
Place conserved topsoil and establish
Minimize clearing and construction limits.
3.
200+00 to 206+47.52
Parking Lot and Approach Road
TYPICAL SECTION
limit stake
Slope
Detail B lot only) See curb (on parking
Construct asphalt grading C or D
8" Aggregate base, base
Aggregate
4.
3.
2.
1.
4.
Type II-A Geotextile
5"
"2
" 2 1R=
"2
Min Length 8"
#4 Dowel Spaced 4'-0"#4 Longitudinal Bar from edge of pavement Place curb 3"
Concrete Curb (Caltrans Curb Type B3-6)
Detail B
OPTION Y
MULTI-USE PATH
TYPICAL SECTIONS
quantities shown in the grading summary.
Transition apron excavation quantities are included in the main trail placing topsoil, geotextile, turf establishment, aggregate base, and grading.
or removal of hammerhead turnarounds, including conserving and at no cost to the government. No payment will be made for construction returning turnaround locations to their pre-construction conditions construction of the turnaround. The Contractor is responsible for hammerheads must be approved by the CO in the field, prior to at breast height of 10-inches or greater. Final locations for temporary special features such as rock outcrops and trees having a diameter
Temporary hammerhead turnarounds must be located to avoid
See the cross sections for cut and fill slope ratios.
and to avoid trees or rock outcroppings.
adjusted by the CO to assure adequate drainage and stability, The excavation and embankment slope ratios may be
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C A .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA A8N/A
B1
OPTION Y
SUMMARY OF QUANTITIES
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SUMMARY OF QUANTITIES
B2
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SUMMARY OF QUANTITIES
B3
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
GRADING SUMMARY
B4
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SHEET 1 OF 4
SUMMARIES
MISCELLANEOUS
B5
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SHEET 2 OF 4
MISCELLANEOUS
B6
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SHEET 3 OF 4
MISCELLANEOUS
B7
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
SHEET 4 OF 4
MISCELLANEOUS
B8
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts B S u m m
M is c e ll a n e o u s S u m m a r ie s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r b ia n c a .s m it h
_ CA B8N/A
24"D
24"D
D
GV
ELEC
ELEC
WV
POT
9+
.0
10+
PC 10+
54.29
P T
.2
P C
.7
P T
.2
P C
.7
P R
C
.9
P C
.4
P T
.6
P C
.3
P R
C
.1
P R
C
.9
P T
.8
P C
.1
P R C .6
P R
C
.3
P T
.7
P C
.5
P T
.9
P C
.4
P T
.3
P C
.3
P T
.7
P C
.8
P T
.4
N .T .P .U .D
H
IG
H L
A N
L A
G E
N .T .P .U .D
.3
.0
.5
V P I
E L
,4
.1
60' VC
V P I
E L
,4
.2
+3.464
+1.223%
75' VC
V P I
E L
,5
.1
+0.675%
175' VC
V P I
E L
,5
.4
+2.676%
120' VC
,4
.5
V P I
E L
,4
.8
3+2.300%
200' VC
K = 77
V P I
E L
,4
.0
+4.89 7%
+0.780%
70' VC
K = 17
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r R y a n .O ls o n
CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r R y a n .O ls o n _ Dollar Creek Trail
CA FLAP 10089(1)
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
C1
200'100'0
Scale in Feet
DOLLAR CREEK SHARED USE PATH STA. 10+00.00 - 24+00.00
Profile Grade
Existing Ground
Highway 28
D o ll a r
D ri v e
Transition apron
(Do not disturb) and shelter
Existing bus turnout pad (Do not disturb)
Existing transformer for details)
(See Sheet T6
Highway 28 crossing
Driveway and Parking Station 206+47.52
Trail Station 18+39.21 = and Parking (Sheet D1)
See Dollar Creek Driveway
Curve = ALI291-1
PI 10+74.83
D
R = 20.00'
T = 20.54'
L = 31.95'
Curve = ALI291-2
PI 11+34.99
D
R = 100.00'
T = 31.21'
L = 60.50'
Curve = ALI291-3
PI 13+19.80
D
R = 230.00'
T = 42.10'
L = 83.28'
Curve = ALI291-4
PI 13+74.20
D
R = 75.00'
T = 13.22'
L = 26.17'
Curve = ALI291-5
PI 16+48.54
D
R = 180.00'
T = 46.05'
L = 90.17'
Curve = ALI291-6
PI 18+69.80
D
R = 300.00'
T = 15.42'
L = 30.81'
Curve = ALI291-7
PI 19+35.26
D
R = 500.00'
T = 50.07'
L = 99.80'
Curve = ALI291-8
PI 20+04.43
D
R = 400.00'
T = 19.44'
L = 38.85'
Curve = ALI291-9
PI 21+08.37
D
R = 62.00'
T = 46.26'
L = 79.48'
Curve = ALI291-10
PI 21+61.31
D
R = 85.00'
T = 19.71'
L = 38.73'
Curve = ALI291-11
PI 21+91.08
D
R = 85.00'
T = 10.74'
L = 21.38'
Curve = ALI291-12
PI 22+69.94
D
R = 190.00'
T = 28.41'
L = 56.41'
Curve = ALI291-13
PI 23+44.92
D
R = 200.00'
T = 8.45'
L = 16.88' trail and parking lot driveway
Do not disturb area between
(connect to asphalt at bus stop)
Trail connection
093-010-037
N.T.P.U.D.
093-160-08
HIGHLANDS VILLAGE
619-A
Bollard, see Special o u tl e t to f it f ie ld c o n d it io n s
P la c e a lo n g s lo p e a r o u n d
C
U Y
D C la s s r ip r a p o r r ip r a p a p r o n
L t, u s e
C o n s tr u c t r ip r a p a p r o n
L t
R t
I n s ta ll e n d s e c ti o n
R t x
C u lv e r t trail connection culvert under
Install 8" x 12' path) existing bike
(connect to
Trail connection to proposed grade raise utility manhole Manhole adjustment, Offset 5'
Begin pavement taper
Station 18+24 Lt
Offset 6'
Begin pavement taper
Station 18+34 Lt
Pavement Offset 6'
Station 18+49 Rt
Offset 5'
End pavement taper
Station 21+30 Lt & Rt
Offset 6'
Begin pavement taper
Station 21+20 Lt & Rt093-010-037
N.T.P.U.D.
E: 7098633.1610
N: 2201548.1847
Station 10+52.00
Begin Project
Dollar Creek
CA FLAP SR89(1)
Option Y
(paid under 25125-0000)
Do not place boulder within Caltrans Right of Way.
in accordance with G2.
Place boulder adjacent to the shared use path
Remove exist. boulder
(match existing)
75 ft of fence
Remove and replace
I
E L
,5
.1
+4.95 0%
200' VC
V P I
E L
,5
.9
+4.95 0%
150' VC
V P I
E L
,5
.6
+3.531
-1.909%
75' VC
V P I
E L
,5
.5
60' VC
V P I
E L
,5
.0
+1.667% -0.780%
100' VC
V P I
E L
,5
.4
100' VC
V P I
E L
,5
.2
+4.93
8% 110' VC
-2.125%
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
P T
.9
P C
.4
P T
.3
P C
.3
P T
.7
P C
.8
P T
.4
P C
.1
P R
C
.4
P R
C
.7
P T
.0
P C
.8
P T
.2
P C
.0
P T
.4
P C
.7
P T
.5
P C
.3
P T
.7
P C
.1
P T
.3
P C
.2
PT 39+35.39
PC 39
+80.0
40+00
T C
E n o t a c q u ir e d a s o f M a r c h
, 2
N .T .P .U .D
S T A
S T A
N .T .P .U .D
24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00
C2
DOLLAR CREEK SHARED USE PATH STA. 24+00.00 - 38+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground
Existing dirt road
Transition apron main (Do not disturb)
Existing SS gravity
Remove existing gate gate and log fence
Remove existing
Curve = ALI291-14
PI 24+03.58
D
R = 390.00'
T = 22.18'
L = 44.32'
Curve = ALI291-15
PI 24+94.67
D
R = 600.00'
T = 32.86'
L = 65.66'
Curve = ALI291-16
PI 25+93.42
D
R = 200.00'
T = 42.30'
L = 83.37'
Curve = ALI291-17
PI 26+59.74
D
R = 200.00'
T = 25.25'
L = 50.23'
Curve = ALI291-18
PI 26+95.90
D
R = 300.00'
T = 11.18'
L = 22.35'
Curve = ALI291-19
PI 27+54.54
D
R = 150.00'
T = 8.70'
L = 17.38'
Curve = ALI291-20
PI 28+21.72
D
R = 300.00'
T = 13.72'
L = 27.42'
Curve = ALI291-21
PI 28+99.19
D
R = 300.00'
T = 18.41'
L = 36.77'
Curve = ALI291-22
PI 29+69.67
D
R = 150.00'
T = 18.28'
L = 36.38'
Curve = ALI291-23
PI 30+49.83
D
R = 150.00'
T = 18.69'
L = 37.18'
N.T.P.U.D.
093-010-038 092-010-034
STATE OF CA.
STATE OF CA.
092-010-033
N.T.P.U.D.
092-010-042
Verify existing depth
(Do not disturb)
Existing water main and establish turf conserved topsoil, (informal trail), place
Obliterate roadway
N.T.P.U.D.
093-010-039
093-010-039
N.T.P.U.D.
0 65
0 6585
PT
9+
.3
PC 39+80.02
40+
P T
.1
P C
.4
P T
.4
P C
.9
P T
.1
P C
.3
P R C
.5
P R
C
.3
P T .0
P C .9
7 PT 48+23.89
PC 4
9+
34.
PT
9+
.9
50+
PC
0+
.1
PT
.8
PC
.0
PT
+22 .59
STATE
O F
C A.
092- 010-
STATE
O F
C A.
092- 010-
STATE
O F
C A.
092- 010-
E L
,5
.2
110' VC
V P I
E L
,5
.1
-2.125%
100' VC V
P I
E L
,5
.2
-3.587%
-4.990%
220' VC
V P I
E L
,5
.1
-4.990%
+0.083%
90' VC
V
P I
E L
,5
.2
+3.95
3%80' VC
V P I
E L
,5
.0
+1.062%
120' VC
V P I
E L
,5
.4
+1.062% +5.00
0%
70' VC
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00
C3
DOLLAR CREEK SHARED USE PATH STA. 38+00.00 - 52+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground
Transition apron
Transition aprons
Transition aprons
Existing dirt road
Dollar Reservoir
Dol la r C re ek
(See S-sheets for details)
48+65, Begin Bridge
(See S-sheets for details)
49+15, End Bridge for details)
(See Staging and Access Plans stabilized construction entrance
Potential construction access/proposed
Curve = ALI291-24
PI 38+24.12
D
R = 250.00'
T = 387.83'
L = 499.11'
Curve = ALI291-25
PI 40+55.21
D
R = 250.00'
T = 75.19'
L = 146.07'
Curve = ALI291-26
PI 42+62.05
D
R = 200.00'
T = 41.58'
L = 81.99'
Curve = ALI291-27
PI 45+30.06
D
R = 480.00'
T = 24.14'
L = 48.24'
Curve = ALI291-28
PI 46+38.27
D
R = 50.00'
T = 18.91'
L = 36.16'
Curve = ALI291-29
PI 46+76.99
D
R = 74.00'
T = 21.47'
L = 41.79'
Curve = ALI291-30
PI 47+20.95
D
R = 74.00'
T = 23.63'
L = 45.75'
Curve = ALI291-31
PI 47+99.47
D
R = 100.00'
T = 25.49'
L = 49.92'
Curve = ALI291-32
PI 49+48.02
D
R = 75.00'
T = 13.24'
L = 26.21'
Curve = ALI291-33
PI 50+69.48
D
R = 200.00'
T = 8.35'
L = 16.69'
Curve = ALI291-34
PI 51+74.04
D
R = 100.00'
T = 61.00'
L = 109.55' L t
R t
C o n s tr u c t r ip r a p a p r o n
I n s ta ll e n d s e c ti o n
L t
R t x
C u lv e r t
C O
U N
TR
Y
C
LU
B
D R
IV
E
STATE OF CA.
092-010-034
092-010-033
STATE OF CA.
B e g in B r id g e
E n d B r id g e zone (SEZ) environmental
Stream zone (SEZ) environmental
Stream
6600 6605
P C
.0
PT 52+22.59
PC 5
2+
.40
P T
.0
P C
.0
P
T
.2
P C
.0
P T
.7
P C
.9
P T
.4
P C
.8
P R
C
.6
P R
C
.9
P T
.2
P C
.3
P C
C
.4
PR
C 1+
.8
P T
.1
P C
.2
PT
4+
.8
PC 64+81.84
65+
P T
.9
P C
.9
PT
6+
.2
P T
.0
S T A
V P I
E L
,5
.4
+5.00 0%
+5.7 43%
300' VC
V P I
E L
,5
.5
+5.7 43%
+4.85 7%
300' VC
V P I
E L
,6
.5
+4.85 7%
+4.90 0%
200' VC
+4.90 0%
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00
C4
DOLLAR CREEK SHARED USE PATH STA. 52+00.00 - 66+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground hammerhead turnaround
Potential temporary hammerhead turnaround
Potential temporary
Curve = ALI291-35
PI 53+05.16
D
R = 80.00'
T = 20.76'
L = 40.62'
Curve = ALI291-36
PI 54+02.67
D
R = 130.00'
T = 37.62'
L = 73.23'
Curve = ALI291-37
PI 55+60.69
D
R = 180.00'
T = 43.68'
L = 85.71'
Curve = ALI291-38
PI 57+21.23
D
R = 300.00'
T = 20.29'
L = 40.51'
Curve = ALI291-39
PI 58+02.98
D
R = 120.00'
T = 38.11'
L = 73.81'
Curve = ALI291-40
PI 58+59.27
D
R = 80.00'
T = 20.59'
L = 40.31'
Curve = ALI291-41
PI 59+53.30
D
R = 800.00'
T = 74.32'
L = 148.22'
Curve = ALI291-42
PI 60+68.76
D
R = 74.00'
T = 24.39'
L = 47.13'
Curve = ALI291-43
PI 61+02.36
D
R = 50.00'
T = 10.87'
L = 21.40'
Curve = ALI291-44
PI 61+36.80
D
R = 74.00'
T = 23.91'
L = 46.25'
Curve = ALI291-45
PI 63+64.88
D
R = 100.00'
T = 42.68'
L = 80.68'
Curve = ALI291-46
PI 65+24.40
D
R = 225.00'
T = 42.56'
L = 84.13'
Transition aprons
092-240-021
STATE OF CA.
Note:
See Note 1
Begin EOP taper
Station 62+65
End EOP taper
Station 62+75
Begin EOP taper
Station 63+00
End EOP taper
Station 63+10
CO to fit field conditions.
may be adjusted by the
1. Location of pullout
P C
.9
P T
.2
P C
.0
PT 68+71.03
PC 69+65.11
70+00
P T
.6
P C
.8
P T .1
P C .6
P T
.5
P C
.5
P T
.8
P C
.2
PT
9+
.3
STATE OF CA.
092-240-021
V P I
E L
,6
.1
+4.90 0%
+6.3 56%
250' VC
V P I
E L
,6
.7
+6.3 56%
+1.610%
75' VC
V P I
E L
,6
.5
0+1.610%
+4.85 7%
150' VC
V P I
E L
,6
.0
+6.2 47%
150' VC
V P I
E L
,6
.8
+6.2 47%
+4.47 2%
75' VC
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00
C5
DOLLAR CREEK SHARED USE PATH STA. 66+00.00 - 80+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground
Hammerhead Turnaround
Potential Temporary
Hammerhead Turnaround
Potential Temporary
Curve = ALI291-47
PI 66+24.15
D
R = 100.00'
T = 12.24'
L = 24.36'
Curve = ALI291-48
PI 68+49.62
D
R = 50.00'
T = 79.56'
L = 100.97'
Curve = ALI291-49
PI 70+68.52
D
R = 75.00'
T = 103.41'
L = 141.50'
Curve = ALI291-50
PI 73+61.32
D
R = 200.00'
T = 54.45'
L = 106.32'
Curve = ALI291-51
PI 74+86.14
D
R = 150.00'
T = 33.54'
L = 65.99'
Curve = ALI291-52
PI 77+22.06
D
R = 250.00'
T = 40.48'
L = 80.27'
Curve = ALI291-53
PI 79+38.34
D
R = 40.00'
T = 72.12'
L = 85.15'
092-240-021
STATE OF CA
90 6695
P C
.2
P T
.3
P C
.7
P T
.2
P C
.1
P T
.0
P C
.4
P T
.8
P C
.6
P T
.0
P C
.5
P T
.2
P C
.7
P T
.5
P C
.8
P R
C
.8
P R
C
.7
P T
.9
P C
.9
P T
.2
P C
.2
P T
.1
P C
.0
P T
.9
P C
.5
P T
.1
P C
.4
P T
.8
P C
.8
P T
.2
P C
.1
444 445
E L
,6
.8
+4.47 2%
75' VC V
P I
E L
,7
.6
+4.47 2%
+5.00 0%
150' VC
V P I
E L
,7
.1
+5.00 0%
90' VC
V P I
E L
,7
.8
+4.55 3%
+3.547
280' VC
V P I
E L
,7
.7
+3.547 % -3.078%
150' VC
V P I
E L
,7
.7
-3.078%
150' VC
V P I
E L
,7
.3
+1.286% -5.000%
75' VC
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00
C6
DOLLAR CREEK SHARED USE PATH STA. 80+00.00 - 94+00.00
200'100'0
Scale in Feet
Profile Grade Existing Ground
Transition apron
Hammerhead Turnaround
Potential Temporary
Curve = ALI291-54
PI 81+29.49
D
R = 500.00'
T = 19.78'
L = 39.54'
Curve = ALI291-55
PI 83+12.11
D
R = 200.00'
T = 16.97'
L = 33.86'
Curve = ALI291-56
PI 84+69.24
D
R = 100.00'
T = 13.78'
L = 27.39'
Curve = ALI291-57
PI 85+30.64
D
R = 50.00'
T = 21.97'
L = 41.40'
Curve = ALI291-58
PI 86+10.05
D
R = 100.00'
T = 16.51'
L = 32.72'
Curve = ALI291-59
PI 86+98.34
D
R = 200.00'
T = 28.63'
L = 56.87'
Curve = ALI291-60
PI 88+39.81
D
R = 150.00'
T = 40.93'
L = 79.92'
Curve = ALI291-61
PI 89+31.46
D
R = 100.00'
T = 52.66'
L = 96.93'
Curve = ALI291-62
PI 89+83.35
D
R = 200.00'
T = 7.61'
L = 15.22'
Curve = ALI291-63
PI 90+41.63
D
R = 300.00'
T = 16.66'
L = 33.28'
Curve = ALI291-64
PI 91+14.75
D
R = 100.00'
T = 12.49'
L = 24.85'
Curve = ALI291-65
PI 92+01.38
D
R = 100.00'
T = 23.37'
L = 45.91'
092-240-021
STATE OF CA.
092-240-035
STATE OF CA.
See Note 1
See Note 1
Note:
Begin EOP taper
Station 93+65
End EOP taper
Station 93+75
Begin EOP taper
Station 94+00
End EOP taper
Station 94+10
End EOP taper
Station 86+60
Begin EOP taper
Station 86+50
End EOP taper
Station 86+25
Begin EOP taper
Station 86+15
1. Location of pullouts may be adjusted by the CO to fit field conditions.
0 673
PC 91+78.01
PT
2+
.9
PC
+76 .5
P T
.1
P C
.4
P T .8
P C .8
P T
.2
P C
.2
P T
.4
P C
.1
P T
.2
P C
.4
P T
.1
P C
.1
P T
.5
P C
.1
P T
.6
P C
.6
P R
C
.2
P R
C
.5
P R
C
.9
P R
C
.3
P T
.8
P C
.4
P T
.1
P C
.4
P T
.0
P C
.3
P T .7
P C .9
PR
C
.3
S T A
.9
.4
.7
E L
,7
.3
-5.000%
75' VC
V P I
E L
,7
.4
-5.000%
-1.083%
75' VC
V P I
E L
,7
.8
-1.083%
-4.947%75' VC
V P I
E L
,7
.4
-1.623%
75' VC
V P I
E L
,6
.7
-1.623%
-0.895%
200' VC
V P I
E L
,6
.7
80' VC
V P I
E L
,6
.0
+2.220% +0.474%
75' VC
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00
C7
DOLLAR CREEK SHARED USE PATH STA. 94+00.00 - 108+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground
Hammerhead Turnaround
Potential Temporary
Hammerhead Turnaround
Potential Temporary
Curve = ALI291-66
PI 94+02.38
D
R = 100.00'
T = 25.86'
L = 50.61'
Curve = ALI291-67
PI 95+10.69
D
R = 200.00'
T = 17.24'
L = 34.40'
Curve = ALI291-68
PI 95+83.28
D
R = 74.00'
T = 23.48'
L = 45.48'
Curve = ALI291-69
PI 96+56.86
D
R = 100.00'
T = 10.67'
L = 21.25'
Curve = ALI291-70
PI 97+18.48
D
R = 100.00'
T = 20.29'
L = 40.04'
Curve = ALI291-71
PI 98+74.73
D
R = 350.00'
T = 54.29'
L = 107.72'
Curve = ALI291-72
PI 100+57.55
D
R = 450.00'
T = 76.44'
L = 151.43'
Curve = ALI291-73
PI 103+01.31
D
R = 100.00'
T = 23.12'
L = 45.45'
Curve = ALI291-74
PI 103+60.12
D
R = 100.00'
T = 17.51'
L = 34.67'
Curve = ALI291-75
PI 104+15.07
D
R = 100.00'
T = 37.79'
L = 72.27'
Curve = ALI291-76
PI 104+70.78
D
R = 75.00'
T = 21.24'
L = 41.39'
Curve = ALI291-77
PI 105+40.39
D
R = 90.00'
T = 49.45'
L = 90.44'
Curve = ALI291-78
PI 105+97.26
D
R = 100.00'
T = 15.88'
L = 31.50'
Curve = ALI291-79
PI 106+94.92
D
R = 300.00'
T = 29.44'
L = 58.68'
Curve = ALI291-80
PI 107+90.81
D
R = 260.00'
T = 24.33'
L = 48.52'
092-240-035
STATE OF CA.
092-240-035
STATE OF CA.
5 6
67006
05 6710
P C
.4
P T
.0
P C
.3
PT
.7
PC
.9
PRC
0+ .3
P T
.1
P
C
.2
P T
.1
P C
.9
P T
.1
P C
.8
P R
C
.7
PR
C .0
PRC 117+76.76
P T
.1
P C
.5
3 PRC 119+74.21 120+
P R C .7
PT
.7
PC
121+
30.25
PT 122+21.31
PC 122+31.57
PRC 122+82.21
PC
3+ .0
P T .3
T C
E n o t a c q u ir e d a s o f M a r c h
, 2
,7
.8
,7
.0
+0.474%
V P I
E L
,6
.9
75' VC
V P I
E L
,7
.3
+4.33 3%
-1.841%
125' VC
V P I
E L
,7
.0
-1.841% +4.66 7%
175' VC
V P I
E L
,7
.6
+4.66 7% -4.667%
150' VC
V P I
E L
,6
.6
-4.667%
70' VC
V P I
E L
,6
.0
-4.000%
75' VC
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r R y a n .O ls o n
CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r R y a n .O ls o n _ Dollar Creek Trail
CA FLAP 10089(1)
108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00
C8
DOLLAR CREEK SHARED USE PATH STA. 108+00.00 - 122+00.00
200'100'0
Scale in Feet
Existing Ground
6750 6750
Hammerhead Turnaround
Potential Temporary
Hammerhead Turnaround
Potential Temporary and establish turf conserved topsoil, (informal trail), place
Obliterate roadway
Profile Grade aprons
Transition
Curve = ALI291-81
PI 109+62.52
D
R = 75.00'
T = 26.15'
L = 50.32'
Curve = ALI291-82
PI 110+50.18
D
R = 120.00'
T = 11.20'
L = 22.35'
Curve = ALI291-83
PI 110+88.87
D
R = 75.00'
T = 27.55'
L = 52.80'
Curve = ALI291-84
PI 111+93.84
D
R = 180.00'
T = 60.60'
L = 116.91'
Curve = ALI291-85
PI 113+81.97
D
R = 100.00'
T = 49.02'
L = 91.16'
Curve = ALI291-86
PI 115+44.59
D
R = 170.00'
T = 41.75'
L = 81.89'
Curve = ALI291-87
PI 116+24.84
D
T = 40.12'
L = 76.31'
Curve = ALI291-88
PI 117+47.53
D
R = 60.00'
T = 86.50'
L = 115.73'
Curve = ALI291-89
PI 118+12.76
D
R = 105.00'
T = 36.00'
L = 69.36'
Curve = ALI291-90
PI 119+32.64
D
R = 100.00'
T = 48.11'
L = 89.68'
Curve = ALI291-91
PI 119+99.52
D
R = 100.00'
T = 25.31'
L = 49.58'
Curve = ALI291-92
PI 120+68.46
D
R = 50.00'
T = 44.67'
L = 72.92'
Curve = ALI291-93
PI 121+76.59
D
R = 200.00'
T = 46.33'
L = 91.06'
R = 100.00' zone (SEZ) environmental
Stream
092-240-035
STATE OF CA.
092-240-035
STATE OF CA.
092-010-023
Placer County
L t
R t
C o n s tr u c t r ip r a p a p r o n
I n s ta ll e n d s e c ti o n
L t
R t x
C u lv e r t
P C
.8
PRC
5+ .7
PR
C 117+
76.76
PC 118+84.53
P R C
.2
120+
P T
.7
P C
.2
P T
.3
P C
.5
P R
C
.2
P T
.6
P C
.0
P T
.3
P C
.6
PT 125+49.93
PC 1
27+
27.
P T
.3
P C
.6
P T .9
P O T .5
T C E n o t ac q u ir ed a s o f
M ar ch
V P I
E L
,6
.0
-1.421%
75' VC
V P I
E L
,6
.6
-1.421% -2.342%
200' VC
V P I
E L
,6
.5
-2.342% -0.500%
60' VC
,6
.1
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
_ CA C9N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P S
R
C .d g n
U s e r b ia n c a .s m it h
Dollar Creek Trail
CA FLAP 10089(1)
122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00
C9
DOLLAR CREEK SHARED USE PATH STA. 122+00.00 - 130+00.00
200'100'0
Scale in Feet
Profile Grade
Existing Ground
Existing gravel road
Fu lt o n C re sc e n t
D ri ve
Lynow ood D rive
Hammerhead Turnaround
Potential Temporary trail to 8' wide paved trail
Transition from 10' wide paved
Sta. 127+70 to 127+81
See special 251-A a random and natural appearance
Place Boulders, create
Curve = ALI291-94
PI 122+57.14
D
R = 150.00'
T = 25.56'
L = 50.64'
Curve = ALI291-95
PI 123+06.20
D
R = 74.00'
T = 23.99'
L = 46.39'
Curve = ALI291-96
PI 123+52.76
D
R = 125.00'
T = 16.75'
L = 33.30'
Curve = ALI291-97
PI 125+18.82
D
R = 74.00'
T = 36.16'
L = 67.26'
Curve = ALI291-98
PI 127+83.05
D
R = 50.00'
T = 55.15'
L = 83.44'
Curve = ALI291-99
PI 128+88.02
D
R = 100.00'
T = 18.38'
L = 36.35' panel (8' x 3')
Detectable warning
SEZ Zone
619-A
Bollard, see Special
092-010-023
Placer County
E: 7098857.7762
N: 2208522.2982
Station 129+42.00
End Project
Dollar Creek Shared Use Path
CA FLAP SR89(1)
Option Y
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R P a r k in g .d g n
U s e r r y a n .o ls o n
CA D4N/A
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R P a r k in g .d g n
U s e r r y a n .o ls o n
Dollar Creek Trail
CA FLAP 10089(1)
,4
.0
V P I
E L
,4
.4
+1.921%
+1.581%
200' VC
,5
.2
POT 20
0+00.0
200+00
PC 200+22.71
P T
.8
P C
.2
P T
.0
P C
.6
P T
.4
P C
.1
PT 20
6+21.27
POT 206
+52.52
H
IG
H L A
N
L A
G E
N .T .P .U .D
DOLLAR CREEK DRIVEWAY AND PARKING STA. 200+00.00 - 206+47.52
200+00
100'50'0
Scale in Feet
200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50 205+00 205+50 206+00 206+50 207+00
Profile Grade
Existing Ground
D1 detail 619-A
Bollard, see special pad (do not disturb)
Existing transformer be ≤ 1.8% in all directions stall and access aisle to Grade accessible parking
20' 9'
10'
21'
R = 25 ft
R=3'
Pavement markings, 4" white (typ.)
R=5'
R=5'
R=5'
7.5'
7.5'
8'
PARKING
ONLY
MINIMUM
FINE $250
VAN
ACCESSIBLE
& R7-8b
R99C (CA)
Curve = ALI_PKG-1
PI 200+60.81
D
R = 50.00'
T = 38.11'
L = 65.12'
Curve = ALI_PKG-2
PI 201+65.26
D
R = 120.00'
T = 18.03'
L = 35.79'
Curve = ALI_PKG-3
PI 203+75.16
D
R = 175.00'
T = 47.51'
L = 92.79'
Curve = ALI_PKG-4
PI 206+07.00
D
R = 25.00'
T = 24.85'
L = 39.12' detail on Special 634-A) aisle (see hatching Hatch accessible
25'
10'
1:3 1:3
12'
18-24" ground
Existing
Section A-A
A
A
B B
No Scale
634-A) marking (See Special Accessible pavement
(Pay using equipment hours)
Construct infiltration basin
6'
4' ground
Existing
Section B-B
18-24"
40'
1:
21:3
1'
1:31:
18"
Riprap Weir
1.5'
1'
See Section 633 Install snow pole (typ.)
Concrete curb
E: 7098737.5125
N: 2201711.5027
Station 200+00.00
Begin Project
Dollar Creek Driveway & Parking
CA FLAP SR89(1)
Option Y
E: 7098790.7548
N: 2202293.1587
Trail Station 18+39.21
Station 206+47.52
End Project
Driveway & Parking
Dollar Creek
CA FLAP SR89(1)
Option Y power pole or supports
Do not disturb exist.
exist. light pole
Do not disturb
646-A)
(See Special
Install Bike rack
(See Special 615-B) trash enclosure and Gov't. furnished
Install Concrete pad
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r g w e n d o ly n .r if fl e
CA D4N/A
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d g n
U s e r g w e n d o ly n .r if fl e
Dollar Creek Trail
CA FLAP 10089(1)
D o ll a r D r iv e
Highway 28
Observation Drive
ACCESS PLAN
STAGING AND
200'100'0
Scale in Feet
D2 location) construction of roadway in final will only be paid once for base for this portion of roadway section (grading and aggregate
Temporary road entrance
Stabilized construction
Sheet 1 of 3 location) construction of roadway in final will only be paid once for base for this portion of roadway section (grading and aggregate
Temporary road staging area
Potential temporary
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r g w e n d o ly n .r if fl e
CA D4N/A
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d g n
U s e r g w e n d o ly n .r if fl e
Dollar Creek Trail
CA FLAP 10089(1)
+00
45+
D3 section
Temporary road
ACCESS PLAN
STAGING AND
road Existing dirt
200'100'0
Scale in Feet
H ig h la n d s D r iv e
Country Club Drive entrance Stabilized construction
Sheet 2 of 3
Proposed trail
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r g w e n d o ly n .r if fl e
CA D4N/A
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P S
R S ta g in g A c c e s s .d g n
U s e r g w e n d o ly n .r if fl e
Dollar Creek Trail
CA FLAP 10089(1)
20 21
0+
+00
125+00
200'100'0
Scale in Feet
ACCESS PLAN
STAGING AND
D4
Fulton Crescent Drive
L y n w o o d D r iv e
B e a u m o n t
R o a d
Marino Way
Existing dirt road staging area
Potential temporary
Proposed trail location) construction of roadway in final will only be paid once for base for this portion of roadway section (grading and aggregate
Temporary road
Sheet 3 of 3
200+00
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
PT
+21 .2
D o ll a r
D ri v e
E1
Highway 28
100'50'0
Scale in Feet
100'50'0
Scale in Feet
3.
2.
1.
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
10+00 - 25+00
CONTROL PLAN
EROSION AND SEDIMENT
TREE REMOVAL AND
(large tree to remain) Remove 8" pine
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
38+
E2
100'50'0
Scale in Feet
100'50'0
Scale in Feet
3.
2.
1.
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
25+00 - 38+00
CONTROL PLAN
EROSION AND SEDIMENT
TREE REMOVAL AND
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
+00
0 5
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
E3
3.
2.
1.
D o ll a r C r e e k
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Proposed Bridge
38+00 - 54+00
CONTROL PLAN
0 6
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
0 6
69+
E4
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
100'50'0
Scale in Feet
100'50'0
Scale in Feet
54+00 - 69+00
CONTROL PLAN
69+00
70+00
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
78+
79+
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
E5
100'50'0
Scale in Feet
100'50'0
Scale in Feet 69+00 - 86+00
CONTROL PLAN
0 8
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
0 9
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
E6
100'50'0
Scale in Feet
100'50'0
Scale in Feet
86+00 - 101+00
CONTROL PLAN
0 1
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
0 1
0 1
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
E7
100'50'0
Scale in Feet
100'50'0
Scale in Feet 101+00 - 117+00
CONTROL PLAN
121+00
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
6+
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
E8
100'50'0
Scale in Feet
100'50'0
Scale in Feet
117+00 - 126+00
CONTROL PLAN
126+00
127+00
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E E
C .d g n
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
CA FLAP 10089(1)
E12
Note:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices are not to scale.
Staging and Access Plan
All Stabilized Construction Entrances are shown in the
3.
2.
1.
E9
100'50'0
Scale in Feet
Fult on C resc ent
Dr
L y n w o o d D r
126+00 - 129+43.56
CONTROL PLAN
SILT FENCE
REVISED:
6" min. trench
6" min.
18" min.
30" min.
24" min.
DETAIL APPROVED FOR USE 01/2011
C157-50
NOTE:
5.
4.
3.
2.
1.
mesh of equivalent strength.
6 in. x 6 in. or prefabricated polymeric
14-gauge steel wire with a mesh spacing of
Silt fence support mesh consists of
6 ft. (max.)
Post spacing without fence support mesh =
10 ft. (max.)
Post spacing with fence support mesh = water from running around the ends.
Curve the silt fence up the slope to prevent contours as closely as possible.
Install silt fence to follow the ground manufacturer's recommendations.
machine-sliced silt fence according to the slicing as approved by the CO. Install
Silt fence may be installed using machine
E10
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow Fi ll slo pe
Flow
T o e o f s lo p e
Flow
(undisturbed)
Existing ground
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Panel B
Steel or wood post
Geotextile, type V-A
Backfilled and compacted soil
Limits of clearing
Steel or wood post
Panel A
Varies
Varies
See Note 3 for spacing
See Note 4
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
NO SCALE
PLAN
T o e o f s lo p
Note 3See
Staple or tie
See Note 5
Fence support mesh (optional)
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
POSTS AT JOINTS
See End Posts Detail
End posts
Geotextile fabric
Staple or tie
SILT FENCE AS PERIMETER CONTROL
Fill
Existing ground
Sheet flow Silt fence
PLAN
SECTION A-A
A
A
Roadway
Edge of shoulder
Edge of shoulder
Toe of slope
Toe of slope
Posts Detail
See End
End posts
Silt fence
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A s r R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
E12
CONSTRUCTION ENTRANCE
STABILIZED
6" min.
50' m in.
NO SCALE
See Note 2
25' radius max.
1:1 m ax
Cut slope
1:1 m ax
Fill slope ground
Existing
Roadway
Existing Ground
Minimize clearing and construction limits
12' - 20'
Temporary Road
Stabilized Construction Entrance/
TYPICAL SECTION
Construction Entrance)
(Subsidiary to Stabilized
Construction Entrance)
(Subsidiary to Stabilized
Type-IV-E Geotextile
6" crushed aggregate
157-A
4.
4.
E11
4.
(Subsidiary to Stabilized Construction Entrance)
Clean, crushed aggregate 3" to 6" in diameter
Stabilized Construction Entrance.
aggregate may be used. Aggregate is subsidiary to of the temporary access road, 3/4" or 1" minus
50 ft of the construction entrance. For the remainder
6" crushed aggregate must be used for the first
Entrances longer than 50')
(Stabilized Construction
1:1 for the temporary access road
20' max. Taper down to 12' at a
STABILIZED CONSTRUCTION ENTRANCE
ingress / egress area
Provide full width of
NOTE:
Existing paved road reduce tracking onto paved roadway.
Remove build-up of sediment as necessary to typical truck using exit.
Construct radius to allow turning movement of where entrance crosses existing drainage ditches.
directed by the CO. Provide temporary drainage
Construct drainage ditches along entrance as
3.
2.
1.
Geotextile type IV-E
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E s p A .d
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
Flow
Stagger joints (typ.)
NO SCALE
12" max.
Trench 2" min.
12" min.
Trench 2" min.
12" min.
See Note 2
Stake Spacing
NOTE:
5.
4.
3.
2.
1.
See Note 2
STAKE DETAIL
157-B
Tightly abut joints (typ.)
Toe of fill slope
Fill slope
FlowFlow Flow
ELEVATION
PLAN
recommendation
According to manufacturer's
Trench 2" (min.) or
Fill slope gaps. See Note 5.
Tie ends if necessary to eliminate
Abut log ends tightly together.
flared end section
Culvert inlet with
E12 uphill side of fiber roll
Place excavated material on
Fiber roll
AT TOE OF SLOPE LAYOUT
FIBER ROLL
FIBER ROLL JOINT DETAIL
uphill side of fiber roll
Place excavated material on
FIBER ROLL IN DITCH
uphill side of fiber roll
Place excavated material on
AT CULVERT INLET
FIBER ROLL
inlets fiber rolls around culvert
Install 2 - 9" Ø min. x 10' the manufacturer's recommendations.
Fiber rolls may be overlapped according to through fiber roll rather than under it.
of log to ensure storm water is forced to flow sides. Tamp soil backfill against upstream side continuous contact with trench bottom and parallel to the contour. Place fiber rolls in
For fiber rolls on bare soil, construct trenches of fiber roll.
12" deep. Expose stakes 2" above top
Drive stakes into undisturbed soil at least at each end.
manufacturer's recommendations). Stake fiber rolls stakes. Space stakes 4' o.c. max. (or according to
Stake fiber rolls in place with 1" x 1" or 1" Ø wood
Repair all rills or gullies prior to installation.
FIBER ROLL
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts E s p B .d
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
DETAIL APPROVED FOR USE 12/2012
SUBEXCAVATION
NO SCALE C204-51
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
max.
2 ft
1 ft min.
6.
5.
4.
3.
2.
1.
NOTE:
the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the every 2 ft of subexcavation depth.
in bottom layers. Provide a 1 ft min. bench width for
Widen top of subexcavation area to allow for bench width
Do not place backfill material within the structural section.
Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
unless otherwise specified.
Replace unsuitable material according to Subsection 204.07
F1
See typical sections for structural section
Finished grade
Backfill with material according to Section 204
TYPICAL SECTION
SUBEXCAVATION
BENCH DETAIL
Total subexcavation width
Width of need according to Section 204
Backfill with material structural section
See typical sections for
Finished grade
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A s r R o a d w a y C
A D
D S h e e ts F C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DETAIL
U.S. CUSTOMARY DETAIL
U s e r g w e n d o ly n .r if fl e
CAN/A
Dollar Creek Trail
F1
PLAN
C TrailL
D o ll a r
C re e k
6'-0" ty p
El. 6538.05
El. 6537.89
El. 6538.58
El. 6538.42
N
6,520
6,525
6,530
6,535
6,540
6,545
6,550
+1.062% Grade
@ C Trail
Profile grade
L
ABUTMENT 1
ABUTMENT 2
Lground @ C Trail.
Approximate existing
L@ 13'-0" Lt. of C Trail.
Approximate existing ground
L@ 13'-0" Rt. of C Trail.
Approximate existing ground
Approximate min.
low chord El. 6534.86
Tubular Steel Pedestrian Rail
(typ.)
Berm El. 6534.4
Length of Bridge = 50'-0"
ELEVATION
El. 6537.97
Sta. 48+65.00
Begin Bridge
El. 6538.50
Sta. 49+15.00
End Bridge
Q
Q
Q
WS EL.
HYDRAULIC DATA
Q(ft /s)Vm(ft/s)3
5.32
9.70
10.35
6530.10
6531.07
6531.31
+1.062%
+1.062%
S ta
.0
E n d B r id g e
S ta
.0
B e g in B r id g e
V P
T
E L
,5
.6
V P
C
.0
E L
,5
.0
GRADE DIAGRAM
No Scale
Elevations are at profile grade @ C TrailL
Drawing No. Description
BRIDGE DRAWING INDEX
RG2994-A
RG2994-B
RG2994-C
RG2994-D
RG2994-E
RG2994-F
GENERAL NOTES
FOUNDATION PLAN
PLAN AND ELEVATION
ABUTMENTS
WINGWALLS
TYPICAL SECTION
Note: Water surface elevations are at upstream face of bridge
*El. 6530.9 El. 6531.4*
K. EIKERMANN
PLAN AND ELEVATION
A
Berm El. 6534.6
Steel Bridge
Prefabricated Modular
S1
1" = 10'-0" 1
WINGWALL A
WINGWALL B
WINGWALL C
WINGWALL D
EXP FIX
El. 6531.31
Water…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .