Amendment_A005.pdf
PDF 1 MB Posted
- Attached to
- CA FLAP SR89(1), Truckee River Bridge Federal contract opportunity
- Solicitation number
- DTFH6816B00001
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
E-111 Schedule A & Option X
CA FLAP SR89(1)
Truckee River Bridge
S. Special Provisions
1. For the first three months, after final acceptance the owner shall regularly check the irrigation system to insure complete functioning.
2. After the initial plant establishment period, the water requirements shall be lowered by 25 percent.
3. Each zone shall be turned on and checked on a monthly basis to insure full functioning of all equipment.
4. The landscape contractor is responsible for the proper watering of plant material to insure healthy plants during construction and until receipt of final acceptance.
Section 612. — SANITARY SEWER SYSTEMS
Materials
612.02 Add the following:
Trench Backfill 704.09 Low-Head Reinforced Concrete Sewer Pipe 706.10 Ductile Iron Pipe and Fittings 707.19 Smooth Wall Polyvinyl Chloride (PVC) Pipe 708.05 High-Density Polyethylene Pressure Pipe and Fittings 708.09 Manholes 725.20 Palmer-Bowlus Flume 725.20
Construction Requirements
612.03 General.
Delete the first sentence and replace with “Furnish Low-Head Reinforced Concrete Sewer Pipe and Ductile Iron Pipe sanitary sewer lines.”
Add the following:
(a) General:
(1) Notify CO at least 2 weeks prior to field fabrication of pipe or fittings.
(2) Furnish feeler gauges of proper size, type, and shape for use during installation for each type of pipe furnished.
(3) Distributing Materials: Place materials along trench only as will be used each day, unless otherwise approved by Engineer. Placement of materials shall not be hazardous to traffic or to general public, obstruct access to adjacent property, or obstruct others working in area.
(b) Examination:
Amendment A005 July 22, 2016
Amendment A005 July 22, 2016
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 3 |
| Text3: |
| 0: A005 |
| 1: 7/22/2016 |
| 2: |
| 0: |
| 1: CA FLAP SR89(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6816B00001 |
| 1: 6/24/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: |
INVITATION FOR BID - Special Contract Requirements Remove Page E-111 and replace with attached Page E-111 dated July 22, 2016.
PLAN SHEETS - Schedule A and Option X Remove Plan Sheet W41 and replace with attached Plan Sheet W41 dated July 22, 2016.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .