F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 1
SECTION 221316 - SANITARY WASTE AND VENT PIPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplemen-tary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following for soil, waste, and vent piping inside the building:
1. Pipe, tube, and fittings.
2. Special pipe fittings.
3. Encasement for underground metal piping.
1.3 DEFINITIONS
A. ABS: Acrylonitrile-butadiene-styrene plastic.
B. EPDM: Ethylene-propylene-diene terpolymer rubber.
C. LLDPE: Linear, low-density polyethylene plastic.
D. NBR: Acrylonitrile-butadiene rubber.
E. PE: Polyethylene plastic.
F. PVC: Polyvinyl chloride plastic.
G. PE: Thermoplastic elastomer.
1.4 PERFORMANCE REQUIREMENTS
A. Components and installation shall be capable of withstanding the following minimum working pressure, unless otherwise indicated:
1. Soil, Waste, and Vent Piping: 10-foot head of water
1.5 SUBMITTALS
A. Product Data: For pipe, tube, fittings, and couplings.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 2
B. Shop Drawings:
C. Field quality-control inspection and test reports.
1.6 QUALITY ASSURANCE
A. Piping materials shall bear label, stamp, or other markings of specified testing agency.
B. Comply with NSF 14, "Plastics Piping Systems Components and Related Materials," for plastic piping components. Include marking with "NSF-dwv" for plastic drain, waste, and vent piping; "NSF-drain" for plastic drain piping; "NSF-tubular" for plastic continu-ous waste piping; and "NSF-sewer" for plastic sewer piping.
C. Comply with applicable portion of the Ohio Plumbing Code pertaining to plumbing ma-terials, construction and installation of products.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements ap-ply to product selection:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not lim-ited to, manufacturers specified.
2.2 PIPING MATERIALS
A. Refer to Part 3 "Piping Applications" Article for applications of pipe, tube, fitting, and joining materials.
2.3 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS
A. Pipe and Fittings: ASTM A 74, Extra-Heavy class(es).
B. Gaskets: ASTM C 564, rubber.
2.4 HUBLESS CAST-IRON SOIL PIPE AND FITTINGS
A. Pipe and Fittings: ASTM A 888 or CISPI 301.
B. Shielded Couplings: ASTM C 1277 assembly of metal shield or housing, corrosion-resistant fasteners, and rubber sleeve with integral, center pipe stop.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 3
1. Standard, Shielded, Stainless-Steel Couplings: CISPI 310, with stainless-steel corrugated shield; stainless-steel bands and tightening devices; and ASTM C 564, rubber sleeve.
a. Available Manufacturers:
1) ANACO.
2) Fernco, Inc.
3) Ideal Div.; Stant Corp.
4) Mission Rubber Co.
5) Tyler Pipe; Soil Pipe Div.
PART 3 - EXECUTION
3.1 EXCAVATION
A. Refer to Division 31 Section "Earth Moving" for excavating, trenching, and backfilling.
3.2 PIPING APPLICATIONS
A. Flanges and unions may be used on aboveground pressure piping, unless otherwise indicated.
B. Aboveground, soil and waste piping NPS 10 and smaller shall be the following:
1. Hubless cast-iron soil pipe and fittings, heavy-duty shielded, stainless-steel cou-plings; and hubless-coupling joints.
2. Polyvinyl chloride (PVC) pipe, PVC DWV socket fittings, and solvent-cemented joints.
C. Aboveground, vent piping NPS 10 and smaller shall be any of the following:
1. Hubless cast-iron soil pipe and fittings, heavy-duty shielded, stainless-steel cou-plings; and hubless-coupling joints.
2. Polyvinyl chloride (PVC) pipe, PVC DWV socket fittings, and solvent-cemented joints.
D. Underground, soil, waste, and vent piping NPS 10 and smaller shall be any of the fol-lowing:
1. Service class, cast-iron soil piping; gaskets; and gasketed joints.
2. Polyvinyl chloride (PVC) plastic, Sewer and Drain Series, PVC pipe; PVC socket fittings; and solvent-cemented joints.
3. Dissimilar Pipe-Material Couplings: Shielded, nonpressure pipe couplings for join-ing dissimilar pipe materials with small difference in OD.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 4
3.3 PIPING INSTALLATION
A. Sanitary sewer piping outside the building is specified in Division 22 Section "Facility Sanitary Sewers."
B. Basic piping installation requirements are specified in Division 22 Section "Common Work Results for Plumbing."
C. Install seismic restraints on piping. Seismic-restraint devices are specified in Divi-sion 22 Section "Vibration and Seismic Controls for Plumbing Piping and Equipment."
D. Install cleanouts at grade and extend to where building sanitary drains connect to build-ing sanitary sewers.
E. Install cast-iron sleeve with water stop and mechanical sleeve seal at each service pipe penetration through foundation wall. Select number of interlocking rubber links re-quired to make installation watertight. Sleeves and mechanical sleeve seals are speci-fied in Division 22 Section "Common Work Results for Plumbing."
F. Install wall-penetration fitting at each service pipe penetration through foundation wall.
Make installation watertight.
G. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Hand-book," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."
1. Install encasement on underground piping according to ASTM A 674 or
AWWA C105.
H. Make changes in direction for soil and waste drainage and vent piping using appropri-ate branches, bends, and long-sweep bends. Sanitary tees and short-sweep 1/4 bends may be used on vertical stacks if change in direction of flow is from horizontal to vertical. Use long-turn, double Y-branch and 1/8-bend fittings if 2 fixtures are installed back to back or side by side with common drain pipe. Straight tees, elbows, and crosses may be used on vent lines. Do not change direction of flow more than 90 de-grees. Use proper size of standard increasers and reducers if pipes of different sizes are connected. Reducing size of drainage piping in direction of flow is prohibited.
I. Lay buried building drainage piping beginning at low point of each system. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream. Install required gaskets according to manufacturer's written in-structions for use of lubricants, cements, and other installation requirements. Maintain swab in piping and pull past each joint as completed.
J. Install soil and waste drainage and vent piping at the following minimum slopes, unless otherwise indicated:
1. Building Sanitary Drain: 2 percent downward in direction of flow for piping NPS 3 and smaller; 1 percent downward in direction of flow for piping NPS 4 and larger.
2. Horizontal Sanitary Drainage Piping: 2 percent downward in direction of flow.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 5
3. Vent Piping: 1 percent down toward vertical fixture vent or toward vent stack.
K. Install engineered soil and waste drainage and vent piping systems as follows:
1. Combination Waste and Vent: Comply with standards of authorities having juris-diction.
L. Sleeves are not required for cast-iron soil piping passing through concrete slabs-on-grade if slab is without membrane waterproofing.
M. Install PVC soil and waste drainage and vent piping according to ASTM D 2665.
N. Install underground PVC soil and waste drainage piping according to ASTM D 2321.
O. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.
3.4 JOINT CONSTRUCTION
A. Join hub-and-spigot, cast-iron soil piping with gasket joints according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for compression joints.
B. Join hubless cast-iron soil piping according to CISPI 310 and CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for hubless-coupling joints.
C. Grooved Joints: Assemble joint with keyed coupling, gasket, lubricant, and bolts ac-cording to coupling and fitting manufacturer's written instructions.
D. PVC Nonpressure Piping Joints: Join piping according to ASTM D 2665.
3.5 VALVE INSTALLATION
A. General valve installation requirements are specified in Division 22 Section "General- Duty Valves for Plumbing Piping."
3.6 HANGER AND SUPPORT INSTALLATION
A. Seismic-restraint devices are specified in Division 22 Section "Vibration and Seismic Controls for Plumbing Piping and Equipment."
B. Pipe hangers and supports are specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment." Install the following:
1. Vertical Piping: MSS Type 8 or Type 42 clamps.
2. Install individual, straight, horizontal piping runs according to the following:
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 6
a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers.
b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.
c. Longer Than 100 Feet, if Indicated: MSS Type 49, spring cushion rolls.
3. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls. Support pipe rolls on trapeze.
4. Base of Vertical Piping: MSS Type 52, spring hangers.
C. Install supports according to Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment."
D. Support vertical piping and tubing at base and at each floor.
E. Rod diameter may be reduced 1 size for double-rod hangers, with 3/8-inch minimum rods.
F. Install hangers for cast-iron soil piping with the following maximum horizontal spacing and minimum rod diameters:
1. NPS 1-1/2 and NPS 2: 60 inches with 3/8-inch rod.
2. NPS 3: 60 inches with 1/2-inch rod.
3. NPS 4 and NPS 5: 60 inches with 5/8-inch rod.
G. Install supports for vertical cast-iron soil piping every 15 feet.
H. Install hangers for PVC piping with the following maximum horizontal spacing and minimum rod diameters:
1. NPS 1-1/2 and NPS 2: 48 inches with 3/8-inch rod.
2. NPS 3: 48 inches with 1/2-inch rod.
3. NPS 4 and 5: 48 inches with 5/8-inch rod.
4. NPS 6: 48 inches with 3/4-inch rod.
I. Install supports for vertical PVC piping every 48 inches.
J. Support piping and tubing not listed above according to MSS SP-69 and manufac-turer's written instructions.
3.7 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Connect soil and waste piping to exterior sanitary sewerage piping. Use transition fit-ting to join dissimilar piping materials.
C. Connect drainage and vent piping to the following:
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 7
1. Plumbing Fixtures: Connect drainage piping in sizes indicated, but not smaller than required by plumbing code.
2. Plumbing Fixtures and Equipment: Connect atmospheric vent piping in sizes indi-cated, but not smaller than required by authorities having jurisdiction.
3. Plumbing Specialties: Connect drainage and vent piping in sizes indicated, but not smaller than required by plumbing code.
4. Equipment: Connect drainage piping as indicated. Provide shutoff valve, if indi-cated, and union for each connection. Use flanges instead of unions for connec-tions NPS 2-1/2 and larger.
3.8 FIELD QUALITY CONTROL
A. During installation, notify authorities having jurisdiction at least 24 hours before inspec-tion must be made. Perform tests specified below in presence of authorities having ju-risdiction.
1. Roughing-in Inspection: Arrange for inspection of piping before concealing or clos-ing-in after roughing-in and before setting fixtures.
2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.
B. Reinspection: If authorities having jurisdiction find that piping will not pass test or in-spection, make required corrections and arrange for reinspection.
C. Reports: Prepare inspection reports and have them signed by authorities having juris-diction.
D. Test sanitary drainage and vent piping according to procedures of authorities having ju-risdiction or, in absence of published procedures, as follows:
1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit sepa-rate report for each test, complete with diagram of portion of piping tested.
2. Leave uncovered and unconcealed new, altered, extended, or replaced drainage and vent piping until it has been tested and approved. Expose work that was cov-ered or concealed before it was tested.
3. Roughing-in Plumbing Test Procedure: Test drainage and vent piping, except out-side leaders, on completion of roughing-in. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water. From 15 minutes before inspection starts to completion of inspection, water level must not drop. Inspect joints for leaks.
4. Finished Plumbing Test Procedure: After plumbing fixtures have been set and traps filled with water, test connections and prove they are gastight and watertight.
Plug vent-stack openings on roof and building drains where they leave building.
Introduce air into piping system equal to pressure of 1-inch wg. Use U-tube or manometer inserted in trap of water closet to measure this pressure. Air pressure must remain constant without introducing additional air throughout period of in-spection. Inspect plumbing fixture connections for gas and water leaks.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SANITARY WASTE AND VENT PIPING 221316 – 8
5. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.
6. Prepare reports for tests and required corrective action.
3.9 CLEANING
A. Clean interior of piping. Remove dirt and debris as work progresses.
B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.
C. Place plugs in ends of uncompleted piping at end of day and when work stops.
3.10 PROTECTION
A. Exposed PVC Piping: Protect plumbing vents exposed to sunlight with two coats of water-based latex paint.
END OF SECTION 221316