Impact Area Groundwater Study Program
FINAL
J-1 Range Southeast Groundwater Rapid Response Action (RRA)
Engineering Design Specifications
Camp Edwards Massachusetts Military Reservation
Cape Cod, Massachusetts
June 12, 2007
Prepared for:
U.S. Army Corps of Engineers New England District
Concord, Massachusetts for
U.S. Army / National Guard Bureau
Camp Edwards, Massachusetts
Prepared by:
ECC
Contract No. DACW33-02-D-0003, CTO 002
IMPACT AREA GROUNDWATER STUDY PROGRAM
FINAL
J-1 Range Southeast Groundwater Rapid Response Action (RRA)
Camp Edwards Massachusetts Military Reservation
Cape Cod, Massachusetts
Prepared for:
U.S. Army Corps of Engineers New England District Concord, Massachusetts
Camp Edwards, Massachusetts
Prepared by:
ECC
NOTICE
The United States Department of Defense, Department of the Army, funded wholly or in part the preparation of this document and work described herein under Contract DACW33-02-D-0003. Mention of trade names or commercial products does not constitute endorsement or recommendation for use.
DISCLAIMER
This document has been prepared pursuant to government administrative orders (U.S. EPA Region 1 SDWA Docket No. I-97-1019 and 1-2000-0014) and is subject to approval by the U.S. Environmental Protection Agency. The opinions, findings, and conclusions expressed are those of the authors and not necessarily those of the Environmental Protection Agency.
Final J-1 Range Southeast Groundwater Rapid Response Action (RRA)
Table of Contents
Division 01 General Requirements 01 33 00 Submittal Procedures 01 62 00 Product Options
Division 26 Electrical 26 05 00 Common Work for Electrical 26 05 26 Grounding and Bonding for Electrical Systems 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical System 26 29 23 Variable Frequency Motor Controllers
Division 31 Earthwork 31 11 00 Clearing and Grubbing 31 23 00 Excavation and Fill 31 25 00 Erosion and Sedimentation Controls
Division 40 Process Integration 40 05 13 Common Work Results for Process Piping 40 05 13.13 Steel Process Piping 40 05 13.73 Plastic Process Piping 40 05 13.94 Process Piping Supports 40 42 13.16 Low Temperature Process Piping Insulation
Division 43 Process Gas and Liquid Handling, Purification, and Storage Equipment 43 21 39 Submersible Liquid Pumps
Pump Curve
Piping Line List
Print Report Submersible
Company: 5CLC5S, 3.72", 10 HP, from EW28 Name:
Date: 4/12/2007
Pump:
Size: 5CLC (5 stage) Type: Submersible Speed: 2985 rpm Synch speed: 3600 rpm Dia: 3.72 in Curve: E6205CFPC2 Impeller:
Specific Speeds: Ns: 2140
Nss:
Dimensions: Suction:
Discharge:
Vertical Turbine: Bowl size: 0.13 m
Max lateral: 0.0063 m Thrust K factor: 1.2 lb/ft
Pump Limits:
Temperature: 120 °F Power:
Pressure: 480 psi g Eye area:
Sphere size: 0.22 in
Operating Point:
Flow: 75 US gpm Head: 192.1 ft
Preferred Operating Region: 70% to 120% of BEP
Fluid:
Water Temperature: 55 °F Density: 62.21 lb/ft³ Vapor pressure: 0.2141 psi a Viscosity: 1.183 cP Atm pressure: 14.7 psi a NPSHa: 33.55 ft
Motor:
Consult Submersible to select a motor for this pump.
Selected from catalog: Goulds Sub 60Hz Vers: 2.03
Data Point Flow: 75 US gpm Head: 193 ft Eff: 71.4% Power: 5.1 hp NPSHr: 6.62 ft
Design Curve Shutoff head: 229 ft Shutoff dP: 98.7 psi Min flow:
BEP: 74.1% @ 104 US gpm NOL power:
6.24 hp @ 118 US gpm
Max Curve Max power:
6.24 hp @ 118 US gpm
Suction Size4" Discharge Sizes3",4" US gpm
Po w er hp
1601401201008060400 20
2.5
7.5
N
PS
H r ft
1601401201008060400 20
H ea d f t
1601401201000 80
74.1
3.72 in3.72 in
3.25 in
70 70
Project: J-1 RANGE GROUNDWATER RRA 35AY5301-059-LST-001
Client: ECC 35AY5301
Location: MMR, CAPE COD, MA PIPING LINE LIST 0
05/15/07
Area Size SEQ No Insulation Tracing From To P&ID
From / To
Piping Plan Max
Pressure
Max
Temp
Test Type Comments
00 3" GW 754 001
EXTRACTION WELL
P-001
3"-GW-002(V)E-754 R1-0001 100 80
00 3" GW 757 002 V E 3"-GW-001(V)E-754
Groundwater
Treatment System R1-0001 43 80
Insulation and tracing between the frost line and
MTU
00 3" EF 754/757 001 V
Groundwater
Treatment System
3"-EF-001-757 R1-0001 43 80
Insulation and tracing between the frost line and
MTU
00 2" EF 757 002 3"-EF-001-757
INFILTRATION
TRENCH
R1-0001 43 80
Perforated Piping
00 2" EF 757 003 3"-EF-001-757
INFILTRATION
TRENCH
R1-0001 43 80
Perforated Piping
Document Number:
Revision Number:
Service
Found On DesignLine Number
Project Number:
Revision Date:
6/11/2007 8:03 AM J1_Piping_Line_List.XLS Page 1 of 1
LIST OF DRAWINGS
DRAWING
NUMBER TITLE
PROCESS
CIVIL
00-CD-0001 CIVIL, DETAIL - 1
00-CD-0002 CIVIL, EXTRACTION WELL DETAILS
00-CP-0001 CIVIL, ENTRANCE ROAD PLAN AND DETAILS
RL-0001 PIPING AND INSTRUMENTATION, LEGEND AND SYMBOLS
RI-0001
ELECTRICAL
00-EU-001 ELECTRICAL, POWER PLAN
ELECTRICAL, POWER DETAILS
PIPING AND INSTRUMENTATION DIAGRAM, EXTRACTION WELL AND INFILTRATION TRENCH
00-CP-0002 CIVIL, SITE PLAN AND DETAILS
00-CP-0003 CIVIL, PIPING PLAN AND PROFILE
00-EU-002
ELECTRICAL, MISC. DETAILS00-EU-003
| Cover |
| Specifications Table of Contents.pdf |
| Division 01 General Requirements |
| 01_33_00.pdf |
| 01_62_00.pdf |
| Division 26 Electrical |
| 26_05_00.pdf |
| 26_05_26.pdf |
| 26_05_53.pdf |
| 26_08_00.pdf |
| 26_29_23.pdf |
| Division 31 Earthwork |
| 31_11_00.pdf |
| 31_23_00.pdf |
| 31_25_00.pdf |
| Division 40 Process Integration |
| 40_05_13.pdf |
| 40_05_13.13.pdf |
| 40_05_13.73.pdf |
| 40_05_13.94.pdf |
| 40_42_13.16.pdf |
| Division 43 Process Gas & Liquid Handling |
| 43_21_39.pdf |
| Pump Curve.pdf |
| Piping Line List.pdf |
| List of Drawings.pdf |
| Process |
| RI-0001.PDF |
| RL-0001.PDF |
| Civil |
| 00-CD-0001.pdf |
| 00-CD-0002.pdf |
| 00-CP-0001.pdf |
| 00-CP-0002.pdf |
| 00-CP-0003.pdf |
| Electrical |
| 00-EU-0001.pdf |
| 00-EU-0002.pdf |
| 00-EU-0003.pdf |
File details come from the government source that posted it.