Final_J-1_SE_RRA_Eng_Specs_&_Drawings.pdf

PDF 12 MB Posted

Attached to
(IDIQ) for Remediation Services Contract for Joint Base Cape CodBourne, Massachusetts
Solicitation number
W912WJ18R0002
Issued by

About this file

Final J-1 SE RRA Eng Specs & Drawings

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
Attachment_I-1_-_Prime_Binding_Rates_Rev_3-15-2018.xlsx XLSX spreadsheet
Attachment_I-2_-_Subcontractor_Binding_Rates_Rev_3-15-2018.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
Attachment_I-4_-_Seed_Task_Order_Rates_for_Subcontractor_Rev_3-15-2018.xlsx XLSX spreadsheet
Attachment_I-3_-_Seed_Task_Order_Rates_for_Prime_Rev_3-15-2018.xlsx XLSX spreadsheet
Demo_1_Decision_Document_2006.pdf PDF
J-3_Range_Decision_Document_2015_.pdf PDF
Demo_1_Decision_Document_Addendum_No._1_2009.pdf PDF
J-2_Range_Decision_Document_2013.pdf PDF
Demo_1_Decision_Document_Addendum_No.2_2013.pdf PDF
CIA_Decision_Document_2012.pdf PDF
IAGWSP_cameras_locations.pdf PDF
Amendment_0003.pdf PDF
J-1_Range_Decision_Document_2011.pdf PDF
Amendment_0002_.pdf PDF
Final_J-1_Range_South_RRA_SPM_Plan_2007.pdf PDF
J-3_Range_O&M_Manual_&_Drawings.pdf PDF
Attachment_I-4_-_Seed_Task_Order_Rates_for_Subcontractor_JM_Rev1.xlsx XLSX spreadsheet
Demo_1_Pew_Rd_&_Base_Boundary_O&M_Manual.pdf PDF
Attachment_I-1_-_Prime_Binding_Rates_Rev2.xlsx XLSX spreadsheet
CIA_1&2_O&M_Manual_&_Drawings.pdf PDF
Final_J-3_Range_RRA_SPEIM_Plan_2006.pdf PDF
Attachment_I-2_-_Subcontractor_Binding_Rates_Rev2.xlsx XLSX spreadsheet
Final_SPEIM_Plan_RRA_Systems_Demo_1_Groundwater_OU_2005.pdf PDF
QAPP_Appendix_D_Files.pdf PDF
Attachment_I-3_-_Seed_Task_Order_Rates_for_Prime_JMRev1.xlsx XLSX spreadsheet
SIR-110-Spec-Sheet.pdf PDF
J-1_North_O&M_Manual_&_Drawings_.pdf PDF
JBCC_GAC_Sample_Non-HazManifest-BOL.PDF PDF
PWS_JBCC_ID-IQ_Seed_Task_Order_3-5-2018_Rev.pdf PDF
Demo_1-Base_Boundary_GWT-_Drawings.pdf PDF
Final_J-2_Range_East_SPM_Plan_2008.pdf PDF
CIA_3_Leading_Edge_O&M_Manual_&_Drawings.pdf PDF
Final_J-2_North_RRA_PME_Plan.pdf PDF
Demo_1_Pew_Road_RRA_Plan_Nov2003.pdf PDF
Demo_1_Frank_Perkins_Road_O&M_Manual.pdf PDF
J-2_East_O&M_Manual.pdf PDF
Demo_1_Off_Base_O&M_Manual_&_Drawings.pdf PDF
Final_J-2_North_O&M_Manual_&_Drawings.pdf PDF
Demo_1_Leading_Edge_MTU.pdf PDF
CIA3_Range_MTU.pdf PDF
JBCC_camera_spec_sheet.pdf PDF
J2_Range_North_Treatment_Facility.pdf PDF
Amendment_0001.pdf PDF
Demo_1_Base_Boundary_MTU.pdf PDF
J2_Range_North_MTUs.pdf PDF
J1_Range_South_and_J2_Range_East.pdf PDF
J1_Range_North.pdf PDF
J3_Range.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Impact Area Groundwater Study Program

FINAL

J-1 Range Southeast Groundwater Rapid Response Action (RRA)

Engineering Design Specifications

Camp Edwards Massachusetts Military Reservation

Cape Cod, Massachusetts

June 12, 2007

Prepared for:

U.S. Army Corps of Engineers New England District

Concord, Massachusetts for

U.S. Army / National Guard Bureau

Camp Edwards, Massachusetts

Prepared by:

ECC

Contract No. DACW33-02-D-0003, CTO 002

IMPACT AREA GROUNDWATER STUDY PROGRAM

FINAL

J-1 Range Southeast Groundwater Rapid Response Action (RRA)

Camp Edwards Massachusetts Military Reservation

Cape Cod, Massachusetts

Prepared for:

U.S. Army Corps of Engineers New England District Concord, Massachusetts

Camp Edwards, Massachusetts

Prepared by:

ECC

NOTICE

The United States Department of Defense, Department of the Army, funded wholly or in part the preparation of this document and work described herein under Contract DACW33-02-D-0003. Mention of trade names or commercial products does not constitute endorsement or recommendation for use.

DISCLAIMER

This document has been prepared pursuant to government administrative orders (U.S. EPA Region 1 SDWA Docket No. I-97-1019 and 1-2000-0014) and is subject to approval by the U.S. Environmental Protection Agency. The opinions, findings, and conclusions expressed are those of the authors and not necessarily those of the Environmental Protection Agency.

Final J-1 Range Southeast Groundwater Rapid Response Action (RRA)

Table of Contents

Division 01 General Requirements 01 33 00 Submittal Procedures 01 62 00 Product Options

Division 26 Electrical 26 05 00 Common Work for Electrical 26 05 26 Grounding and Bonding for Electrical Systems 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical System 26 29 23 Variable Frequency Motor Controllers

Division 31 Earthwork 31 11 00 Clearing and Grubbing 31 23 00 Excavation and Fill 31 25 00 Erosion and Sedimentation Controls

Division 40 Process Integration 40 05 13 Common Work Results for Process Piping 40 05 13.13 Steel Process Piping 40 05 13.73 Plastic Process Piping 40 05 13.94 Process Piping Supports 40 42 13.16 Low Temperature Process Piping Insulation

Division 43 Process Gas and Liquid Handling, Purification, and Storage Equipment 43 21 39 Submersible Liquid Pumps

Pump Curve

Piping Line List

Print Report Submersible

Company: 5CLC5S, 3.72", 10 HP, from EW28 Name:

Date: 4/12/2007

Pump:

Size: 5CLC (5 stage) Type: Submersible Speed: 2985 rpm Synch speed: 3600 rpm Dia: 3.72 in Curve: E6205CFPC2 Impeller:

Specific Speeds: Ns: 2140

Nss:

Dimensions: Suction:

Discharge:

Vertical Turbine: Bowl size: 0.13 m

Max lateral: 0.0063 m Thrust K factor: 1.2 lb/ft

Pump Limits:

Temperature: 120 °F Power:

Pressure: 480 psi g Eye area:

Sphere size: 0.22 in

Operating Point:

Flow: 75 US gpm Head: 192.1 ft

Preferred Operating Region: 70% to 120% of BEP

Fluid:

Water Temperature: 55 °F Density: 62.21 lb/ft³ Vapor pressure: 0.2141 psi a Viscosity: 1.183 cP Atm pressure: 14.7 psi a NPSHa: 33.55 ft

Motor:

Consult Submersible to select a motor for this pump.

Selected from catalog: Goulds Sub 60Hz Vers: 2.03

Data Point Flow: 75 US gpm Head: 193 ft Eff: 71.4% Power: 5.1 hp NPSHr: 6.62 ft

Design Curve Shutoff head: 229 ft Shutoff dP: 98.7 psi Min flow:

BEP: 74.1% @ 104 US gpm NOL power:

6.24 hp @ 118 US gpm

Max Curve Max power:

6.24 hp @ 118 US gpm

Suction Size4" Discharge Sizes3",4" US gpm

Po w er hp

1601401201008060400 20

2.5

7.5

N

PS

H r ft

1601401201008060400 20

H ea d f t

1601401201000 80

74.1

3.72 in3.72 in

3.25 in

70 70

Project: J-1 RANGE GROUNDWATER RRA 35AY5301-059-LST-001

Client: ECC 35AY5301

Location: MMR, CAPE COD, MA PIPING LINE LIST 0

05/15/07

Area Size SEQ No Insulation Tracing From To P&ID

From / To

Piping Plan Max

Pressure

Max

Temp

Test Type Comments

00 3" GW 754 001

EXTRACTION WELL

P-001

3"-GW-002(V)E-754 R1-0001 100 80

00 3" GW 757 002 V E 3"-GW-001(V)E-754

Groundwater

Treatment System R1-0001 43 80

Insulation and tracing between the frost line and

MTU

00 3" EF 754/757 001 V

Groundwater

Treatment System

3"-EF-001-757 R1-0001 43 80

Insulation and tracing between the frost line and

MTU

00 2" EF 757 002 3"-EF-001-757

INFILTRATION

TRENCH

R1-0001 43 80

Perforated Piping

00 2" EF 757 003 3"-EF-001-757

INFILTRATION

TRENCH

R1-0001 43 80

Perforated Piping

Document Number:

Revision Number:

Service

Found On DesignLine Number

Project Number:

Revision Date:

6/11/2007 8:03 AM J1_Piping_Line_List.XLS Page 1 of 1

LIST OF DRAWINGS

DRAWING

NUMBER TITLE

PROCESS

CIVIL

00-CD-0001 CIVIL, DETAIL - 1

00-CD-0002 CIVIL, EXTRACTION WELL DETAILS

00-CP-0001 CIVIL, ENTRANCE ROAD PLAN AND DETAILS

RL-0001 PIPING AND INSTRUMENTATION, LEGEND AND SYMBOLS

RI-0001

ELECTRICAL

00-EU-001 ELECTRICAL, POWER PLAN

ELECTRICAL, POWER DETAILS

PIPING AND INSTRUMENTATION DIAGRAM, EXTRACTION WELL AND INFILTRATION TRENCH

00-CP-0002 CIVIL, SITE PLAN AND DETAILS

00-CP-0003 CIVIL, PIPING PLAN AND PROFILE

00-EU-002

ELECTRICAL, MISC. DETAILS00-EU-003

Cover
Specifications Table of Contents.pdf
Division 01 General Requirements
01_33_00.pdf
01_62_00.pdf
Division 26 Electrical
26_05_00.pdf
26_05_26.pdf
26_05_53.pdf
26_08_00.pdf
26_29_23.pdf
Division 31 Earthwork
31_11_00.pdf
31_23_00.pdf
31_25_00.pdf
Division 40 Process Integration
40_05_13.pdf
40_05_13.13.pdf
40_05_13.73.pdf
40_05_13.94.pdf
40_42_13.16.pdf
Division 43 Process Gas & Liquid Handling
43_21_39.pdf
Pump Curve.pdf
Piping Line List.pdf
List of Drawings.pdf
Process
RI-0001.PDF
RL-0001.PDF
Civil
00-CD-0001.pdf
00-CD-0002.pdf
00-CP-0001.pdf
00-CP-0002.pdf
00-CP-0003.pdf
Electrical
00-EU-0001.pdf
00-EU-0002.pdf
00-EU-0003.pdf

File details come from the government source that posted it.