Erosion and Sediment Control Plan S1
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PP
PROJECT LIMITS
BENCHMARK - TOP IRON PIN
ELEV=361.50
BENCHMARK - TOP IRON PIN
ELEV=362.18
WALTER REED AVENUE
H O
S P
IT
A L
R O
A D
GARNETT
W
EST ACCESS
SHEET INDEX:
SPOIL SITE S1
MTC FORT PICKETT
DATEDATE
REVISIONS:
VICINITY MAP: 1'' = 2000'
FIRST SUBMITTAL
DATE: 3/25/11
AREA OF DISTURBANCE:
TOTAL PROJECT AREA: 5.69 ACRES
4.10 ACRES
THIS PLAN ADDRESSES EROSION AND SEDIMENT CONTROL MEASURES ASSOCIATED WITH THE
PROPOSED SPOIL SITE. THIS PLAN IS INTENDED TO PROVIDE A FRAMEWORK FOR PROJECT
COMPLIANCE WHENEVER NECESSARY SPOIL ACTIVITY IS PROPOSED IN THE FUTURE. THE
CONTRIBUTING DRAINAGE AREA TO THE SPOIL SITE IS APPROXIMATELY 5.69 ACRES.
APPROXIMATELY 4.1 ACRES OF LAND DISTURBANCE (MAXIMUM) ARE PROPOSED DURING THE
SPOIL ACTIVITIES.
600'200'0' 100'200' 400'
CONTOUR INTERVAL = 2 FEET
OWNER
SURVEYOR
ENGINEER
STATISTICAL DATA
WILLIAMSBURG ENVIRONMENTAL GROUP, INC.
5209 CENTER STREET
WILLIAMSBURG, VIRGINIA 23188
PHONE: (757) 220-6869
FAX: (757) 229-4507
ATTN: DANIEL PROCTOR, PE
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
S
E
S P la n _R
E V
.d w g
FAX: (434) 292-2901
BLACKSTONE, VA 23824
MTC FORT PICKETT BLDG T-232
COMMONWEALTH OF VA - DEPARTMENT OF MILITARY AFFAIRS
ATTN: DAVID SHORT
PHONE: (434) 292-2144
PROJECT LOCATION
1. COVER SHEET
2. EROSION AND SEDIMENT CONTROL PLAN
3. EROSION AND SEDIMENT CONTROL DETAILS
4. EROSION AND SEDIMENT CONTROL NOTES
PROJECT NARRATIVE:
A VSMP GENERAL CONSTRUCTION PERMIT AND A STORMWATER
POLLUTION PREVENTION PLAN IS CURRENTLY UNDER
PREPARATION.
B&B CONSULTANTS, INC.
E. FERRELL STREET
SOUTH HILL, VA 23970
PHONE: (434) 447-7621
FAX: (434) 447-4257
ATTN: LARRY HARTSOE, L.S.
NOTE: ALL ELEVATIONS CONTAINED HEREIN ARE BASED ON THE
SITE TEMPORARY BENCHMARK IDENTIFIED ON THIS SHEET.
VERTICAL DATUM REFERENCED TO MEAN SEA LEVEL PER
NAVD 88, OR AS OTHERWISE NOTED ON PLANS.
EROSION AND SEDIMENT CONTROL PLAN
NOTTOWAY COUNTY, VIRGINIA
10/11/11 REVISED PER DCR COMMENTS
11/16/11 REVISED PER DCR COMMENTS
BENCHMARK -
TOP IRON PIN
ELEV=361.50
BENCHMARK -
TOP IRON PIN
ELEV=362.18
EXISTING
STOCKPILE
AREA
EXISTING
CONCRETE
STOCKPILE
AREA
356.25
DA-1B
0.92 AC
POST
A
A'
EXISTING
STOCKPILE
AREA
EXISTING
STOCKPILE
AREA
SEDIMENT BASIN OUTLET STRUCTURE:
36" VDOT SWM-1,CREST ELEV. = 353.2 FT;
24" OUTLET BARREL, LENGTH = 32 FT
INV. (UP) = 350.0 FT
INV. (DOWN) = 349.5 FT
3" ORIFICE AT ELEV.=350.0 FT
EXISTING
DEBRIS
STOCKPILE
AREA
OUTLET PROTECTION
CLASS I RIPRAP
MIN LENGTH = 9 FT
W
ALTER
R
EED
AVEN
U
E
EXISTING DROP INET
STRUCTURE (15" RCP
TO REMAIN)
APPROX. 5-FT BOTTOM
WIDTH SCC WITH 2:1 SIDE
SLOPES (MAX 5.0% SLOPE)
PREVIOUS SITE ACCESS
TO BE ABANDONED
STORMWATER
CONVEYANCE
CHANNEL 1
(SEE SUMMARY TABLE,
SHEET 4)
STORMWATER
CONVEYANCE
CHANNEL 2
(SEE SUMMARY TABLE,
SHEET 4)
PROVIDE EC-2
MATTING ON
PROPOSED
EMBANKMENT
H O
S P
I T
A L
R
O A
D
E R
O S
IO
N
A N
D S
E D
IM
E
N T C
O N
T R
O L P
L A
N M
T C
F O
R T P
IC
K
E T T S
P O
IL
S
IT
E
S
N O
T T O
W A
Y C
O U
N T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS/CSH
DATE:
3/25/11
DATE:
REVISIONS:
JOB#: 4475
SHEET: 2
SCALE:
1 INCH = 40 FT
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
S
E
S P la n _R
E V
.d w g
120'40'0' 20'40' 80'
CONTOUR INTERVAL = 1 FOOT
EXISTING CONTOURS
LEGEND:
PROJECT LIMITS PROPOSED CONTOURS
PROPOSED DIVERSION
CHANNEL
PROPOSED CONSTRUCTION
ENTRANCE
PROPOSED CLASS I RIPRAP
OUTFALL STABILIZATION
PROPOSED LIMITS OF
DISTURBANCE
SITE BENCHMARK
SURVEYED EDGE OF
GRAVEL ROAD
CONSTRUCTION SEQUENCE
1. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS PER THIS SHEET.
2. INSTALL SEDIMENT BASIN BERM AND OUTLET STRUCTURE, STABILIZE IMMEDIATELY AFTER
INSTALLATION.
3. PERFORM GRADING OF SEDIMENT BASIN.
4. INSTALL DIVERSION DIKES AS SHOWN TO DIRECT FLOW TO THE TEMPORARY SEDIMENT BASIN, STABILIZE IMMEDIATELY AFTER INSTALLATION..
5. INSTALL STORMWATER CONVEYANCE CHANNEL AT OUTFALL OF SEDIMENT BASIN AS SHOWN ON
THIS SHEET (SIZING ON SHEET 4).
6. PERFORM STOCKPILE OPERATIONS WITHIN LIMITS OF DISTURBANCE AS SHOWN ON THIS SHEET.
PERFORM TEMPORARY SEEDING ON ANY SPOIL PILES TO BE LEFT DORMANT FOR MORE THAN 30
DAYS BUT LESS THAN 1 YEAR. WITHIN 7 DAYS PROVIDE PERMANENT SEEDING ON ANY SPOIL PILE
THAT IS COMPLETE OR TO BE LEFT DORMANT FOR MORE THAN A YEAR
7. ONCE SPOIL ACTIVITY IS COMPLETED, MAKE SURE ALL DISTURBED AREAS ARE STABILIZED WITH
PERMANENT SEEDING.
8. WHEN FINAL STABILIZATION IS COMPLETE, REMOVE DIVERSION DIKES, SILT FENCE, AND ANY OTHER
TEMPORARY EROSION AND SEDIMENT CONTROLS. REMOVE PERFORATED TUBING FROM BASIN
OUTLET STRUCTURE AND INSTALL DEBRIS RACK IN ACCORDANCE WITH VDOT SWM-DR DETAILS.
DRAINAGE AREA
BOUNDARY
PROPOSED SILT FENCE
SOIL TYPE (TYP)
(SEE SUMMARY TABLE,
SHEET 4)
EXISTING STOCKPILE AREAS
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
300'0'300' 150'
1 INCH = 300 FEET
OVERALL DRAINAGE AREA MAP
POST DEVELOPMENT TC FLOW PATH
PRE DEVELOPMENT TC FLOW PATH
PRE AND POST
SAME FOR DA-2
PROPOSED EC-2 MATTING
A
DISTANCE (FT.)
E L E
V A
T
IO
N F
T M
S L
CROSS-SECTION A-A'
VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 20'
20 40 60 80 100 120 140 160
A'
BOTTOM OF BASIN = 347 FT
1 YEAR ELEV. = 350.74
SCALE: 1 INCH = 40 FEET
WATER ELEVATIONS SHOWN ARE FOR PROPOSED STABILIZED CONDITIONS
(SEE SHEET 4 FOR HYDRAULIC SUMMARY FOR ALL CONDITIONS)
36 IN SWM-1RISER STRUCTURE
RIM ELEV. = 353.20
3 IN ORIFICE ELEV = 350.00
INVERT OUT = 350.0010 YEAR ELEV. = 352.84
SCC-2
NORMAL POOL ELEVATION = 350.0
PROPOSED DRAINAGE
BLANKET
CLASS 1 RIPRAP OUTFALL
PROTECTION UNDERLAIN WITH
NONWOVEN FILTER FABRIC
CUTOFF TRENCH
(SEE DETAIL, SHEET 3)
PROPOSED CONCRETE
CRADLE
CONSTRUCTED TOP OF
BERM = 356.75 FT
EXISTING GRADE
PROPOSED GRADE
PROPOSED 24 IN RCP
LENGTH = 32 FT
INV UP = 350.00
INV DN = 349.50
2 YEAR ELEV. = 351.23
100 YEAR ELEV. = 353.69
SETTLED TOP OF BERM
= 356.25 FT
PROPOSED VDOT EW-1
(SEE DETAIL, SHEET 3)
PROPOSED EC-3 MATTING
PROPOSED NORMAL POOL
ELEVATION
PROPOSED ROUTED WATER
SURFACE ELEVATION (WSE)
349.50 FT (MSL)OUTLET BARREL INVERT DOWN ELEVATION
350.00 FT (MSL)OUTLET BARREL INVERT UP ELEVATION
DESIGN ELEVATIONS
1-YEAR ELEVATION
CFS
1-YEAR
8.16
PRINCIPAL RISER CREST ELEVATION 353.20 FT (MSL)
352.84 FT (MSL)
30.17
10-YEAR
CFS
356.25 FT (MSL)
350.00 FT (MSL)
353.57 FT (MSL)
354.22 FT (MSL)
2-YEAR ELEVATION
13.20
2-YEAR
CFS
POST-DEVELOPMENT (ROUTED)
TOP OF DAM ELEVATION (MIN.)
NORMAL POOL ELEVATION
HYDROLOGIC SUMMARY
ROUTED PEAK ELEVATIONS (DISTURBED CONDITIONS)
10-YEAR ELEVATION
100-YEAR ELEVATION
BASIN ROUTING SUMMARY
69.31
100-YEAR
CFS
350.00 FT (MSL)WATER QUALITY ORIFICE ELEVATION
11.83 41.6018.68PRE-DEVELOPMENT 89.93
352.15 FT (MSL)
LOW FLOW ORIFICE: 3" ORIFICE WITH DEBRIS RACK, ORIFICE INVERT =
350.0 FT (MSL). INSTALL 6" PERFORATED ELBOW
INSTEAD OF DEBRIS RACK WHILE UTILIZED AS A
SEDIMENT BASIN
RISER STRUCTURE: 36" VDOT SWM-1 RISER STRUCTURE, CREST =
352.25.0 FT (MSL)
OUTLET BARREL: PROPOSED 24" RCP, PROPOSED LENGTH = 32 FT,
INVERT (UP) = 350.0 FT (MSL), INVERT (DOWN)
= 349.5 FT (MSL)
OUTLET STRUCTURE DESIGN SUMMARY:
EXTENDED-DETENTION DESIGN SUMMARY
1-YR 24-HR EXTENDED DETENTION:
Vce VOLUME: 0.519 AC-FT *0.6 = 13,565 CF
ED WSE (FROM STAGE-STORAGE): 352.18 FT (MSL)
H (MAX): 2.18 FT
REQUIRED MINIMUM DRAWDOWN: 24 HRS
QAVG: Vce / (24*3600) = 0.157 CFS
QMAX: QAVG*2 = 0.314 CFS
MAX. HEAD METHOD - A (ORIFICE AREA): 0.044 SF
MAX. HEAD METHOD - D (DIAMETER): 0.237 FT = 2.9 INCHES
PROPOSED ORIFICE DIAMETER = 3 INCHES
WATER QUALITY DESIGN SUMMARY
NOTE: NO WATER QUALITY TREATMENT REQUIREMENTS ARE
ASSOCIATED WITH THIS PROJECT; BUT RATHER, THE
PROPOSED POND IS MERELY DESIGNED FOR
EXTENDED-DETENTION TO ADDRESS DOWNSTREAM
ADEQUACY CONCERNS. THE PROPOSED WET STORAGE IS
BASED ON SEDIMENT BASIN SIZING CRITERIA AND NOT
PERMANENT STORMWATER MANAGEMENT, SOME INCIDENTAL
WATER QUALITY IMPROVEMENTS ARE ANTICIPATED.
HYDROLOGIC SUMMARY
WATERSHED DATA
PRE-DEVELOPMENT DA-1
PROPOSED DISTURBED
PRE-DEVELOPMENT
HYDROLOGIC SUMMARY
NOTE:
1. THE PROPOSED RUNOFF CHARACTERISTICS ARE NOT EXPECTED TO INCREASE
FLOWS FROM THE SITE AREA.
2. THE CN WAS DERIVED USING TABLE 2-2A OF THE TR55 MANUAL.
3. THE EFFECTS OF THE PROPOSED SEDIMENT BASIN ARE REFLECTED IN THE
DISTURBED RESULTS.
TC (HR)AREA (AC)
0.373734.87
Q 10YRQ 2YR
41.6018.68
40.2715.33
PROPOSED 30.1713.20
CN
PRE-DEVELOPMENT DA-2 0.4317514.11
PROPOSED DISTURBED DA-1A 0.177883.84
PROPOSED DISTURBED DA-2 0.4318114.11
PROPOSED DISTURBED DA-1B 0.083 ( 5 MINUTE MIN.)751.07
FOLLOWING FINAL SITE STABILIZATION AND REMOVAL OF E&S CONTROLS DA-1
AND DA-3 TO REVERT BACK TO ORIGINAL DA-1 CONDITIONS.
PROPOSED STABILIZED DA-1A 0.379713.84
PROPOSED STABILIZED DA-2 0.4317314.11
PROPOSED STABILIZED DA-1B 0.083 ( 5 MINUTE MIN.)711.07
9.97 40.2715.33DISTURBED CONDITIONS 94.79
1-YEAR ELEVATION
351.23 FT (MSL)
352.84 FT (MSL)
353.69 FT (MSL)
2-YEAR ELEVATION
ROUTED PEAK ELEVATIONS (PROPOSED CONDITIONS)
10-YEAR ELEVATION
100-YEAR ELEVATION
350.74 FT (MSL)
SOILS CHARACTERISTICS TABLE
NAME
SOURCE: MTC FORT PICKETT GIS
WEHADKEE SILT LOAM 0-2% SLOPES99
SOIL
GROUP
HSG
C
SITE OUTFALL
PROPOSED DISTURBED
Q 10YRQ 2YR
7.720.39
PROPOSED 0.390.25
BMP OUTFALL
2:
3:1
Q 25YR
58.58
61.79
42.81
Q 10YR
16.94
2.24
10/11/11 REVISED PER DCR COMMENTS
11/16/11 REVISED PER DCR COMMENTS
PROPOSED DROP INLET
PROTECTION
E
S D
E T A
IL
S
M T C
F O
R T P
IC
K
E T T S
P O
IL
S
IT
E
S
N O
T T O
W A
Y C
O U
N T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS/CSH
DATE:
3/25/11
DATE:
REVISIONS:
JOB#: 4475
SHEET: 3
SCALE:
AS SHOWN
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
S
E
S P la n _R
E V
.d w g
NTS
DETAIL: STONE CONSTRUCTION ENTRANCE
12' MIN.
3' 5:1
SIDE ELEVATION
A6" MIN.
70' MIN.
OPERATION
OF INGRESS AND EGRESS
* MUST EXTEND FULL WIDTH
3" MIN.
3" MIN.
PLAN VIEW
SECTION A-A
ROADWAY
EXISTING
10' MIN.
A
(OPTIONAL)
MOUNTABLE BERM
ROADWAY
EXISTING
10' MIN.
10'MIN.
70' MIN.
FILTER CLOTH
EXISTING GROUND
12' MIN.
FILTER CLOTH
COURSE AGGREGATE
VDOT #1
4"
12"
SHALLOW
SLOPE
BERM
STEEP
SLOPE
DITCH FLOW
DETAIL: EC-2 MATTING
NTS
POINTS A SHOULD BE HIGHER THAN POINT B.
3' MAX.
FLOW
FLOW
CONSTRUCTION OF A SILT FENCE
(WITHOUT WIRE SUPPORT)
1. SET THE STAKES.
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
A
FLOW
A
6' MAX.
SF
4"
B
DETAIL: SILT FENCE
NTS
TRASH RACK
BOTTOM OF BASIN
ELEVATION = 347 FT
NTS
DETAIL: SEDIMENT BASIN SCHEMATIC
TEMPORARY TOP OF DAM
ELEVATION = 356.25 FT
25-YR STORM
ELEVATION = 353.31 FT
RISER CREST
ELEVATION = 353.2 FT67 CY/AC "DRY"
STORAGE
WET POOL
ELEVATION = 350.0 FT
OUTLET BARREL
PERFORATED DRAINAGE PIPE
(SEE VDOT SWM-DR DETAIL)
67 CY/AC "WET"
STORAGE
DEWATERING ORIFICE
ELEVATION = 350.0 FT
SEDIMENT CLEANOUT
ELEV. = 348.5
("WET" STORAGE
REDUCED TO 34 CY/AC)
PROPOSED SWM-1
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
0.3' FREE BOARD
DESIGN FLOW DEPTH
10% SETTLEMENT
DETAIL: DIVERSIONS
NTS
SEE TABLE (SHEET 4) FOR SIZING
1 2
1'-0 1 2"
1 2
1 1 4"
4"
R 1 4"
2 34" 4"
2"x4" ADHESIVE BOLT, 1 1 2"
SWM-DR
116.05
REFERENCE
SPECIFICATION
DETAIL FOR DEBRIS RACK HOLDER
TOP TO BE HINGED TO ALLOW
ACCESS TO WATER QUALITY
ORIFICE (SEE NOTE 3)
METAL
SEE NOTE 2
REV. 3/03
HIGH DENSITY POLYETHYLENE
2 " SQUARE OR
3" DIA. HOLES
MAX.
(SEE NOTE 2)
1'-0" MIN.
M
IN
THE LOCATION OF THE DEBRIS RACK HOLDER
MAY BE ADJUSTED FOR VARIABLE CONDITIONS.
DEBRIS RACK HOLDER AND ALL HARDWARE IS
TO BE GALVANIZED.
4.
3.
2.
1.
DEBRIS RACK TO BE HINGED AS SHOWN OR
CONTRACTOR MAY SUBSTITUTE A COMPARABLE
DESIGN AS APPROVED BY THE ENGINEER.
DEBRIS RACK MAY BE FABRICATED FROM WELDED
" DIAMETER BARS OR " THICK HIGH DENSITY
POLYETHYLENE. METAL COMPONENTS OF DEBRIS
RACK MUST NOT BE GALVANIZED.
COST OF DEBRIS RACK, METAL PLATE, AND DEBRIS
RACK HOLDER TO BE INCLUDED IN THE BID PRICE
FOR THE SWM DRAINAGE STRUCTURE.
" DIA.
HOLE
SHEET 2 OF 5
VIRGINIA DEPARTMENT OF TRANSPORTATION
DEBRIS RACK, METAL PLATE, WATER QUALITY ORIFICE, CONCRETE CRADLE
TOP TO BE HINGED TO ALLOW
NOT GALVANIZED
ACCESS TO WATER QUALITY ORIFICE
(SEE HOLDER DETAIL ABOVE)
FRONT VIEW
SELF-LOCKING HEX. NUT,
FLAT WASHER.
FRONT VIEW
(FOR WATER QUALITY ORIFICE)
(FOR SWM DRAINAGE STRUCTURES, SWM RISER PIPES AND SWM DAMS)
STORMWATER MANAGEMENT (SWM) DETAILS
DETAIL FOR DEBRIS RACK
3" M
AX.
SIDE VIEW
TOP VIEW
M
IN
M
IN
MIN.
M
IN
SIDE VIEW
3/8" DIA. BARS
SPECIFICATION
REFERENCE
VIRGINIA DEPARTMENT OF TRANSPORTATION
NOTES:
3'-0"
VAR.
FRONT VIEW
SIDE VIEW
SWM DRAINAGE STRUCTURE
6" 6"
8"
TYPICAL
CULVERT
ROUND OR
SQUARE 12" MAX.
OR 6" MIN. OPENING
THROUGH THE WALL
(DEBRIS RACK NOT SHOWN)
METAL
PLATE
DEBRIS
RACK
SEE
NOTE 6
BOTTOM OF
STORMWATER
MANAGEMENT
BASIN
SWM-1
116.02
3'-0" DIA.
SHEET 2 OF 2
SEE NOTE 6
PRECAST STORMWATER MANAGEMENT DRAINAGE STRUCTURE
MIN.
"H L
IN
E A
R F
E E
T
REV. 3/03
CLASS A-3 CONCRETE TO BE
USED TO FILL SWM DRAINAGE
STRUCTURE TO INVERT OF
OUTLET PIPE.
WATER QUALITY
ORIFICE SEE NOTE B
TRASH RACK
1.
2.
3.
4.
5.
6.
7.
8.
TYPICAL
EMBANKMENT
(DAM)3:1 SLOPE
COST OF TRASH RACK AND DEBRIS RACK ARE TO BE INCLUDED IN THE
PRICE BID FOR THE STORMWATER MANAGEMENT DRAINAGE STRUCTURE.
STRUCTURE MAY BE PRECAST OR CAST IN PLACE. SEE SHEET
1 OF 2 FOR DETAILS ON CAST IN PLACE STRUCTURE.
WEEP HOLES SHALL NOT BE PROVIDED. ANY LIFT HOLES SHALL BE
PLUGGED.
STEPS ARE TO BE PROVIDED WHEN HEIGHT OF STRUCTURE IS 4'-0"
OR GREATER ABOVE INVERT OF OUTLET PIPE. FOR STEP DETAILS
SEE STANDARD ST-1.
SEE STANDARD SWM-DR FOR DETAILS ON PLATE, DEBRIS RACK AND
TRASH RACK.
MARK HEIGHT OF STRUCTURE, IN BLACK, WITH 4" HIGH NUMERALS
AND 1" WIDE HORIZONTAL STRIPES AT 1' INTERVALS FROM INVERT
OF WATER QUALITY ORIFICE (ALL VISIBLE SIDES).
THE PERMANENT STORMWATER MANAGEMENT DRAINAGE STRUCTURE,
STANDARD SWM-1 MAY BE MODIFIED WHERE THE STORMWATER
MANAGEMENT BASIN IS TO BE USED AS A TEMPORARY SEDIMENT BASIN
DURING PROJECT CONSTRUCTION. SEE STANDARD SWM-DR, SHEET 1 OF 5
FOR TEMPORARY MODIFICATION DETAILS.
THE SIZE OF THE WATER QUALITY ORIFICE SHALL BE SPECIFIED ON THE
PLANS. ADDITIONAL OPENINGS IN THE STORMWATER MANAGEMENT DRAINAGE
STRUCTURE TO BE PROVIDED WHEN SPECIFIED ON THE PLANS.
GEOTEXTILE WITH
AOS = #70
U.S. SIEVE SIZE
12 INCH
DRAINAGE
BLANKET
(VDOT #78)
4 INCH DIAMETER
SLOTTED PVC PIPES
(MIN. 5 FEET LONG)
DAYLIGHTED
THROUGH
WEEPHOLE IN
HEADWALL (TYP) OR
DOWNSTREAM RIPRAP
RPOTECTION
12"
12"
DETAIL: DRAINAGE BLANKET
NTS
DETAIL: CONCRETE CRADLE
NTS
D = 24" 8"
12 D = 2" **
2 (D + 2t)
4 D * t (thickness)
NOTES:
CONCRETE SHALL BE CLASS A3
* IF THE PIPE IS LAID IN AN
EXCAVATED TRENCH, THEN THE
SIDE WALLS MAY CONFORM TO
THE TRENCH SHAPE
** SHALL NOT BE LESS THAN 6"
TYPICAL
4"
REV. 3/03
NECESSARY BY THE DEPARTMENT
MAY BE SUBJECT TO CHANGE AS DEEMED
OR TO REGULATION AND CONTROL OF TRAFFIC
DESIGN FEATURES RELATING TO CONSTRUCTION
SHEET NO.FILE NO.PROJECTPLAN NO.
SHEET NO.
PROJECTROUTE
STATE
PROJECT
FEDERAL AID
STATE
REVISED
VA.
DRAWING NO. 2216A
SPECIAL DESIGN SECTION
NOTES:
1. A HINGED, LOCKABLE ACCESS DOOR SHALL BE PROVIDED ON ALL TRASH RACKS:
- TOTAL WEIGHT IS GREATER THAN 75 LBS.
- IF THE TRASH RACK IS TO BE PLACED ON A SWM-1 WITH AN "H"
DIMENSION GREATER THAN 7'-2".
2. ANTI-VORTEX PLATE IS TO BE USED WHEN SPECIFIED ON THE PLANS. COST OF FURNISHING
AND PLACING THE ANTI-VORTEX PLATE IS TO BE INCLUDED IN THE BID PRICE FOR THE
STRUCTURE.
NOTES:
1. A HINGED, LOCKABLE ACCESS
DOOR SHALL BE PROVIDED ON ALL
TRASH RACKS.
3 "
4'-8" SQ.
4"
METAL (STEEL)
5'-4" SQ.
4'-0" SQ.
2" x "
STEEL
PLATE
TYP.
4'-9 " SQ.
TYP.
" DIA.
STEEL BAR
6"2'-4"
" DIA. X 6" LG.
ADHESIVE BOLTS
W/FLAT WASHERS AND
SELF LOCKING NUTS
TYPICAL 8 PLACES-EQUALLY
SPACED ON AN "E" DIA. B.C.
6" 20" 13"
WT. (LBS.)
APPROX.
WT. (LBS.)
APPROX.
HIGH DENSITY POLYETHYLENE
FOR STORMWATER MANAGEMENT DRAINAGE STRUCTURES
STORMWATER MANAGEMENT (SWM) DETAILS TRASH RACK
VIRGINIA DEPARTMENT OF TRANSPORTATION
5'-4" SQ.
4'-0" SQ.
WT. (LBS.)
APPROX.
WT. (LBS.)
APPROX.
RISER DIMENSION
SEGMENTE
RISER DIMENSION
E
" THICK
STEEL PLATE
LOCKABLE ACCESS
DOOR W/HINGE
SEE NOTE 1
LOCKABLE ACCESS
DOOR W/HINGE
SEE NOTE 1
D
HIGH DENSITY POLYETHYLENE
METAL
CIRCULAR
STORMWATER
MANAGEMENT
BASIN
D
RISER O.D.
RISER I.D.
CIRCULAR
STORMWATER
MANAGEMENT
BASIN
93101100
114 115 106
177372
24 3130
CBAO.D.I.D.
114 107
176872
95558
24 630
CBAO.D.I.D.
2" WIDE X "
THICK STEEL RING
BOLTED TO RISER
RISER O.D.
RISER I.D.
A MAX.
" DIA. X 6" LG.
ADHESIVE BOLTS
W/FLAT WASHERS AND
SELF LOCKING NUTS.
TYPICAL 8 PLACES-EQUALLY
SPACED ON AN "E" DIA. B.C.
6" SQ.
M
AX.
" DIA.
STEEL BAR
" DIA. X 6" LG.
ADHESIVE BOLTS
W/FLAT WASHERS AND
SELF LOCKING NUTS
TYPICAL 8 PLACES-EQUALLY
SPACED ON AN "E" DIA. B.C.
6" SQ. MAX.
B
TYP.
TYP.
A
MAX.
B MAX.
C MIN.
D MIN.
C MIN.
D MIN.
OUTLET PIPE
6"
TEMPORARY WATER
QUALITY ORIFICE
COVER PLATE
PERMANENT WATER
QUALITY ORIFICE
OPENING
TOP OF
STRUCTURE ELEVATION
FRONT VIEW
(TYPICAL DETAILS)
SIDE VIEW
(TYPICAL DETAILS)
DRAINAGE TUBING SHALL COMPLY WITH
ASTM F667 OR AASHTO M294.
POLYETHELENE CAP
6" DIAMETER PERFORATED
POLYETHYLENE DRAINAGE
TUBING
DRY
STORAGE
ELEVATION
WET
STORAGE
ELEVATION
3" DIAMETER TEMP. ORIFICE STUBOUT.
SCHEDULE 40 STEEL STUB, 1 FOOT.
MIN. LENGTH.
TEMPORARY
DEWATERING
DEVICE
STORMWATER MANAGEMENT
DRAINAGE STRUCTURE
(STD. SWM-1 TYPICAL)
1.
6.
7.
WATERTIGHT FLEXIBLE
COUPLING FOR 8" DIA.
POLYETHELENE TUBING
WATERTIGHT FLEXIBLE COUPLING FOR
3" DIA. STEEL PIPE TO
6" DIA. POLYETHELENE TUBING
STANDARD PIPE HANGER OR
"X2" METAL CLAMPS WITH HOLES
FOR " DIAMETER BOLTS & NUTS
6" DIA. SOLID POLYETHELENE
DRAINAGE TUBING
NTS
DETAIL: CUTTOFF TRENCH
EXISTING GRADE OR
BOTTOM OF PIPE/CRADLE
1 FT OVERCUT
AND BACKFILL WITH
SUITABLE COMPACTED
FILL MATERIAL
4'
4'
PROPOSED CLAY
CUTTOFF TRENCH
2. EXCAVATE A 4" x 4" TRENCH
UPSLOPE ALONG THE LINE OF
STAKES.
3. STAPLE FILTER MATERIAL
TO STAKES AND EXTEND IT
INTO THE TRENCH.
4. BACKFILL AND COMPACT
THE EXCAVATED SOIL.
IN DITCHES, APPLY
PROTECTIVE COVERING
PARALLEL TO THE DIRECTION
OF FLOW. USE CHECK SLOTS
AS REQUIRED. AVOID JOINING
MATERIAL IN THE CENTER OF
THE DITCH IF AT ALL POSSIBLE.
BRING MATERIAL DOWN TO A LEVEL
AREA BEFORE TERMINATING THE
INSTALLATION. TURN THE END
UNDER 4" AND STAPLE AT 12"
INTERVALS.
ON STEEP SLOPES,
APPLY PROTECTIVE
COVERING PARALLEL TO
THE DIRECTION OF FLOW
AND ANCHOR
SECURELY.
WHERE THERE IS A BERM AT THE TOP
OF THE SLOPE, BRING THE MATERIAL
OVER THE BERM AND ANCHOR IT
BEHIND THE BERM.
ON SHALLOW SLOPES, STRIPS OF
NETTING PROTECTIVE COVERINGS
MAY BE APPLIED ACROSS THE
SLOPE.
DV
SWM-DR
DETAIL: EC-3 MATTING
NTS
DETAIL: SOIL MATTING ANCHORS
NTS
PERMANENT SEEDING TEMPORARY SEEDING
NOTE:
CONTRACTOR MAY SELECT APPROPRIATE TEMPORARY SEED FROM THE LIST BELOW BASED ON TIME OF YEAR, TEMPORARY SEEDING IS ONLY NEEDED IF DISTURBED AREAS NOT YET AT FINAL GRADE WILL BE LEFT DORMANT FOR LONGER THAN 30 DAYS BUT LESS THAN A YEAR. PERMANENT SEEDING AND MULCHING SHALL BE USED IN
ALL OTHER SITUATIONS
10/11/11 REVISED PER DCR COMMENTS
SPECIFIC APPLICATION
* GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE.
SPECIFIC APPLICATION
OVERFLOW
DETAIL: DROP INLET SEDIMENT FILTER
NTS
WIRE SCREEN
CONCRETE BLOCK
GRAVEL FILTER*
WIRE SCREEN
FILTERED WATER
RUNOFF
WATER WITH
SEDIMENT
SEDIMENT
DROP INLET
WITH GATE
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE
HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW
CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING
AROUND THE STRUCTURE.
IP
E
S N
O T E
S M
T C
F O
R T P
IC
K
E T T S
P O
IL
S
IT
E
S
N O
T T O
W A
Y C
O U
N T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS/CSH
DATE:
3/25/11
DATE:
REVISIONS:
JOB#: 4475
SHEET: 4
SCALE:
AS SHOWN
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
S
E
S P la n _R
E V
.d w g
EROSION AND SEDIMENT CONTROL NARRATIVE
EROSION AND SEDIMENT CONTROL NOTES
1. THE PURPOSE OF THE EROSION CONTROL MEASURES SHOWN ON THESE PLANS SHALL BE TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS RESULTING FROM CONSTRUCTION ACTIVITIES FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS.
IF FIELD INSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SITE, APPROPRIATE MODIFICATIONS SHALL BE MADE TO CORRECT ANY PLAN DEFICIENCIES. IN ADDITION TO THESE NOTES, ALL PROVISIONS OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL REGULATION SHALL APPLY TO THIS PROJECT.
2. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A DISPOSAL AREA.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 . THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH ALL APPLICABLE
MEASURES CONTAINED THEREIN WHICH MAY BE PERTINENT TO THIS PROJECT.
4. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING A LIVE WATERCOURSE SHALL BE
MET.
5. PERIODIC INSPECTIONS OF ALL EROSION CONTROL MEASURES SHALL BE MADE BY THE CONTRACTOR TO ASSESS THEIR CONDITION.
INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY 14 CALENDAR DAYS AND WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT OR EVERY 7 CALENDAR DAYS REGARDLESS OF WEATHER (AS DETERMINED AND SPECIFIED VSMP PERMITTING AND SWPPP). THIS INCLUDES INSPECTION AFTER EVERY ERODIBLE RAINFALL EVENT AND THE REPAIR OF MEASURES DAMAGED BY SUB-CONTRACTORS. ANY NECESSARY REPAIRS OR CLEAN UP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL
BE MADE IMMEDIATELY.
6. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT THE TIME OF CONSTRUCTION TO INSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. APPROVAL BY THE ENGINEER OR SITE INSPECTOR WILL BE REQUIRED FOR ANY DEVIATIONS FROM THE
APPROVED PLANS.
7. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY THE STATE INSPECTOR, ENGINEER, OWNER, OR HIS DESIGNATED AGENT IF
DEEMED NECESSARY.
8. ALL EROSION CONTROL DEVICES SHALL BE IN PLACE AND FUNCTIONAL AT ALL TIMES AND IF REMOVED FOR CONSTRUCTION PROGRESS, SHALL BE REPLACED BY THE CLOSE OF EACH WORKDAY.
9. SURFACE FLOWS OVER CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER REDIRECTING FLOWS FROM TRANSVERSING THE SLOPES OR BY INSTALLING MECHANICAL DEVICES TO SAFELY LOWER WATER DOWNSLOPE WITHOUT CAUSING EROSION.
10. THE CONTRACTOR SHALL PLACE SOIL STOCKPILES AT THE LOCATIONS SHOWN ON THIS PLAN OR AS DIRECTED BY THE ENGINEER. SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. OFF-SITE WASTE OR BORROW AREAS SHALL BE APPROVED PRIOR TO THE IMPORT OF ANY BORROW OR EXPORT OF ANY WASTE TO OR FROM THE PROJECT SITE.
11. ALL SLOPES SHALL REQUIRE THE USE OF EROSION CONTROL BLANKETS TO AID IN THE ESTABLISHMENT OF A VEGETATIVE COVER.
INSTALLATION SHALL BE IN ACCORDANCE WITH SPECIFICATION 3.36 (B/M) AND MANUFACTURER'S INSTRUCTIONS. NO SLOPES SHALL BE
CREATED STEEPER THAN 2:1.
12. THE CONTRACTOR SHALL COMPLETE DRAINAGE FACILITIES WITHIN 30 DAYS FOLLOWING COMPLETION OF ROUGH GRADING AT ANY POINT WITHIN THE PROJECT. OUTFALL CHANNELS FROM DRAINAGE STRUCTURES SHALL BE STABILIZED IMMEDIATELY AFTER CONSTRUCTION OF SAME. THIS INCLUDES INSTALLATION OF EROSION CONTROL STONE OR PAVED DITCHES WHERE REQUIRED.
13. PERMANENT OR TEMPORARY SOIL STABILIZATION MUST BE APPLIED TO ALL DENUDED AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL STABILIZATION MUST ALSO BE APPLIED TO DENUDED AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. SOIL STABILIZATION MEASURES INCLUDE VEGETATIVE
ESTABLISHMENT OR MULCHING.
14. IF DISTURBED AREA STABILIZATION IS TO BE ACCOMPLISHED DURING THE MONTHS OF DECEMBER, JANUARY, OR FEBRUARY, STABILIZATION SHALL CONSIST OF MULCHING IN ACCORDANCE WITH SPECIFICATION 3.35 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK THIRD EDITION, 1992 . SEEDING WILL THEN TAKE PLACE AS SOON AS THE SEASON PERMITS.
15. THE TERM SEEDING, FINAL VEGETATIVE COVER OR STABILIZATION, ON THIS PLAN SHALL MEAN THE SUCCESSFUL GERMINATION AND ESTABLISHMENT OF A STABLE COVER FROM A PROPERLY PREPARED SEEDBED CONTAINING THE SPECIFIED AMOUNTS OF SEED AND
FERTILIZER IN ACCORDANCE WITH THE SEEDING SCHEDULE LOCATED ON THIS SHEET.
16. TEMPORARY EROSION CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED.
PROJECT DESCRIPTION
THIS PLAN ADDRESSES EROSION AND SEDIMENT CONTROL MEASURES ASSOCIATED WITH THE PROPOSED SPOIL SITE. THIS PLAN IS INTENDED TO PROVIDE A FRAMEWORK FOR PROJECT COMPLIANCE WHEN NECESSARY SPOIL ACTIVITY TAKES PLACE IN THE FUTURE. THE PROPOSED PROJECT AREA IS APPROXIMATELY 5.69 ACRES WITH A MAXIMUM ANTICIPATED AREA OF DISTURBANCE OF 4.1 ACRES.
EXISTING CONDITIONS
EXISTING CONDITIONS CONSIST OF OPEN AREA AND WOODED AREAS WITH EXISTING STOCKPILE AREAS LOCATED THROUGHOUT THE SITE.
EXISTING PAVED ROADS SURROUND THE SITE.
ADJACENT AREAS
ADJACENT ROADWAYS WILL BE PROTECTED THROUGH THE USE OF A CONSTRUCTION ENTRANCES. DOWNSTREAM CHANNELS WILL BE PROTECTED BY PROPOSED E&S MEASURES AS SPECIFIED ON SHEET 2 AND 3, MAINLY CONSISTING OF SILT FENCE AND A TEMPORARY
SEDIMENT BASIN.
OFF-SITE AREAS
A SEPARATE EROSION AND SEDIMENT CONTROL PLAN SHALL BE PROVIDED FOR ANY PROPOSED DISTURBANCE LOCATED OUTSIDE THE PROJECT LIMITS SHOWN IN THESE PLANS. (SUCH AS IMPORTED BORROW MATERIAL FOR DAM EMBANKMENT)
SOILS
A SOILS TABLE HAS BEEN PROVIDED ON THIS SHEET OF THIS PLAN SET. THE PROJECT AREA IS GENERALLY CHARACTERIZED BY TYPE "C" SILT
LOAM SOILS WITH A 0-2% SLOPE.
CRITICAL AREAS
CRITICAL AREAS INCLUDE DOWNSTREAM RECEIVING STREAM CHANNELS AND SLOPES WHERE SHEET FLOW EXCEEDS 100 FEET IN LENGTH WHICH COULD POTENTIALLY LEAD TO RILL AND GULLY EROSION. PROPOSED STOCKPILE AREAS WILL BE TREATED WITH EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON SHEET 2. ADEQUATE OUTFALL PROTECTION AS WELL AS A STORMWATER CONVEYANCE CHANNEL DELIVERS CONCENTRATED FLOWS FROM THE PROPOSED SEDIMENT BASIN TO A STABLE OUTFALL.
PERMANENT STORMWATER CONSIDERATIONS
THE ULTIMATE OUTFALL FOR THE PROPOSED SPOIL SITE IS LOCATED IN THE SOUTHWEST CORNER OF THE PROJECT SITE. PROPOSED SEDIMENT BASIN WILL SLOW RUNOFF FROM THE DISTURBED SITE DURING SPOILING OPERATIONS AND THE SITE WILL BE FULLY STABILIZED WITH PERMANENT SEEDING UPON COMPLETION OF SPOIL ACTIVITY. CONCENTRATED FLOW AT THE OUTFALL SHALL BE CONVEYED FROM THE PROJECT SITE THROUGH AN ADEQUATE STORMWATER CONVEYANCE CHANNEL AND WILL DISCHARGE AT NON-EROSIVE VELOCITIES TO THE EXISTING OUTFALL, WHICH CONSISTS OF AN EXISTING STORMWATER CONVEYANCE SYSTEM, AS SHOWN ON THE H&H SUMMARY (SHEET 2), THE FINAL PROPOSED FLOWS AT THE OUTFALL POINT (EXISTING STORMWATER CONVEYANCE SYSTEM) AND THE TEMPORARY FLOWS DURING CONSTRUCTION ARE BOTH LESS THAN OR EQUAL TO PRE DEVELOPMENT CONDITIONS. FOR ENHANCEMENT CONTROLS THE BASIN
HAS BEEN DESIGNED FOR 1 YEAR EXTENDED DETENTION.
STRUCTURAL PRACTICES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 . THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, LATEST EDITION SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE, IN WRITING.
1. TEMPORARY STONE CONSTRUCTION ENTRANCE - STD. & SPEC. 3.02 - CONSTRUCTION ENTRANCES SHALL BE EMPLOYED TO REDUCE THE AMOUNT OF MATERIAL TRANSPORTED OFF-SITE BY CONSTRUCTION VEHICLES. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED AT THE LOCATION SHOWN ON SHEET 2 FOR THE DURATION OF THE CONSTRUCTION AND STABILIZATION.
2. TEMPORARY SEDIMENT BASIN - STD. & SPEC. 3.14 - A TEMPORARY SEDIMENT BASIN SHALL BE USED TO PREVENT THE FLOW OF SEDIMENT
AWAY FROM THE CONSTRUCTION AREA.
3. SOIL STABILIZATION BLANKETS AND MATTING - STD. & SPEC. 3.36
STABILIZATION MATTING SHALL BE IMMEDIATELY APPLIED TO ALL DISTURBED SLOPES UPON COMPLETION OF CONSTRUCTION.
4. DIVERSION - STD. & SPEC. 3.12 - DIVERSION CHANNELS SHALL BE CONSTRUCTED ACROSS SLOPES AS SHOWN IN THE PLANS WITH A SUPPORTING EARTHEN RIDGE ON THE LOWER SIDE TO DIVERT RUNOFF TO THE PROPOSED SEDIMENT BASIN.
5. SILT FENCE - STD. & SPEC. 3.05 - SILT FENCE SHALL BE PLACED AS SHOWN IN THESE PLANS TO PREVENT SEDIMENT TRANSPORT OFFSITE.
NON-STRUCTURAL PRACTICES
1. TEMPORARY SEEDING - STD. & SPEC. 3.31 - ALL EXPOSED SOIL SURFACES THAT ARE NOT TO BE FINE-GRADED FOR PERIODS LONGER THAN 30 DAYS SHALL RECEIVE TEMPORARY SEEDING. SELECTION OF THE TEMPORARY SEED MIXTURE SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 AS REFERENCED ON THIS SHEET.
2. PERMANENT SEEDING - STD. & SPEC. 3.32 - PERMANENT SEEDING SHALL BE USED TO STABILIZE DISTURBED AREAS BROUGHT TO FINAL GRADE BY ESTABLISHING PERENNIAL VEGETATIVE COVER. SELECTION OF THE PERMANENT SEED MIXTURE SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 AS REFERENCED ON THIS SHEET.
3. MULCHING - STD. & SPEC. 3.35 - AREAS WHICH HAVE BEEN PERMANENTLY OR TEMPORARILY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING. MULCHING SHALL BE USED IN FALL FOR WINTER COVER AND DURING HOT AND DRY SUMMER MONTHS.
MAINTENANCE PRACTICES
IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY THE
CONTRACTOR. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR:
3.02 - TEMPORARY STONE CONSTRUCTION ENTRANCE - THE ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODICALLY TOPDRESSING THE ENTRANCE WITH
ADDITIONAL STONE OR WASHING THE EXISTING STONE.
3.03 - CONSTRUCTION ROAD STABILIZATION - NO CONSTRUCTION ROAD STABILIZATION IS PROPOSED AT THIS TIME, HOWEVER IF VEHICULAR PATHS APPEAR TO WARRANT STABILIZATION, IT SHOULD BE APPLIED AS NEEDED OR AS DIRECTED BY THE INSPECTOR.
3.05 - SILT FENCE - SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY.
SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED
SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
3.09 - TEMPORARY DIVERSION DIKE - THE MEASURE SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET OR SEDIMENT TRAPPING FACILITY, AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED
OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER
ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY.
3.12 - TEMPORARY DIVERSION - BEFORE FINAL STABILIZATION, THE DIVERSION SHOULD BE INSPECTED AFTER EVERY RAINFALL AND AT LEAST ONCE EVERY TWO WEEKS. SEDIMENT SHALL BE REMOVED FROM THE CHANNEL AND REPAIRS MADE AS NECESSARY. SEEDED AREAS WHICH
FAIL TO ESTABLISH A VEGETATIVE COVER SHALL BE RESEEDED AS NECESSARY.
3.14 - TEMPORARY SEDIMENT BASIN - THE EMBANKMENT SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. THE BASIN SHOULD BE CHECKED AFTER EACH RUNOFF-PRODUCING RAINFALL FOR SEDIMENT CLEANOUT. WHEN THE SEDIMENT REACHES THE CLEAN-OUT LEVEL, IT SHALL BE REMOVED
AND PROPERLY DISPOSED OF.
EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS
THE INTENT OF THIS SECTION IS TO SUMMARIZE HOW THE EROSION AND SEDIMENT CONTROL MEASURES PROPOSED IN THE EROSION AND SEDIMENT CONTROL PLAN SATISFY THE 19 MINIMUM STANDARDS SET FORTH IN THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30-40). THE FOLLOWING IS A BRIEF SYNOPSIS OF THE MINIMUM STANDARDS (MS) AND HOW THEY ARE ADDRESSED IN
THE PLAN:
MS-1 STABILIZATION OF DENUDED AREAS - WITHIN SEVEN DAYS, PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS THAT MAY REMAIN DORMANT FOR LONGER THAN 30 DAYS. TEMPORARY AND PERMANENT SEEDING, MULCHING, BLANKETS AND MATTING, AND RIPRAP ARE SPECIFIED IN THE PLAN FOR STABILIZATION OF DENUDED AREAS.
MS-2 STABILIZATION OF SOIL STOCKPILES - DURING CONSTRUCTION, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES, (SEDIMENT BASIN).
MS-3 ESTABLISHMENT OF PERMANENT VEGETATION - A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT EROSION.
MS-4 TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES - ALL SEDIMENT TRAPPING MEASURES (INCLUDING SEDIMEN TRAP) SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES PLACE.
MS-5 STABILIZATION OF EARTHEN STRUCTURES - STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES IMMEDIATELY
AFTER INSTALLATION AS SPECIFIED IN THE PLAN.
MS-6 SEDIMENT TRAP AND BASINS - SEDIMENT BASINS ARE NOT USED IN THIS PLAN. THE SEDIMENT TRAP SHALL CONTROL DRAINAGE AREAS LESS THAN TO THREE ACRES. THE MINIMUM STORAGE CAPACITY SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA.
MS-7 DESIGN, CONSTRUCTION, AND STABILIZATION OF CUT AND FILL SLOPES - CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. MOST SLOPES ARE PROPOSED TO BE STABILIZED WITH BLANKETING AND MATTING AS SHOWN ON THE E&S PLAN. SLOPES FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8 CONCENTRATED RUNOFF DOWN SLOPES - CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE.
MS-9 ADEQUATE DRAINAGE PROTECTION FROM WATER SEEPS - IF THE CONTRACTOR IDENTIFIES WATER SEEPAGE FROM A SLOPE FACE, ADEQUATE DRAINAGE PER VESCH 3.28 OR OTHER APPROPRIATE PROTECTION SHALL BE PROVIDED.
MS-10 STORM SEWER INLET PROTECTION - NOT APPLICABLE FOR THIS PLAN SINCE THERE ARE NO STORM SEWER INLETS AFFECTED BY THE
PROPOSED CONSTRUCTION.
MS-11 STORMWATER CONVEYANCE PROTECTION - BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED.
MS-12 WORK IN LIVE WATERCOURSE - THERE ARE NO WATERCOURSES LOCATED WITHIN THE PROJECT AREA.
MS-13 CROSSING LIVE WATERCOURSE - NONE OF THE PROPOSED SPOIL ACTIVITY IS EXPECTED TO CROSS A LIVE WATERCOURSE.
MS-14 REGULATION OF WATERCOURSE CROSSING - NO IMPACTS TO WATERCOURSES ARE ANTICIPATED FOR THIS PROJECT. SHOULD ANY IMPACTS TO WATERCOURSES BECOME NECESSARY, PROPER PERMITS MUST BE OBTAINED PRIOR TO CONSTRUCTION.
MS-15 STABILIZATION OF WATERCOURSE - THERE ARE NO WATERCOURSES LOCATED WITHIN THE PROJECT AREA.
MS-16 UNDERGROUND UTILITY LINE INSTALLATION - NO UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN THIS PLAN.
MS-17 VEHICULAR SEDIMENT TRACKING - WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE ROADWAY. WHERE SEDIMENT IS TRANSPORTED INTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
MS-18 REMOVAL OF TEMPORARY MEASURES - ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER THE FINAL SITE STABILIZATION OR WHEN TEMPORARY MEASURES ARE NO LONGER NEEDED.
MS-19 STORMWATER MANAGEMENT - THE PROPOSED SITE IMPROVEMENTS ARE NOT EXPECTED TO INCREASE HYDROLOGIC CONDITIONS AT THE SITE OUTFALL FOLLOWING FINAL STABILIZATION (SEE SUMMARY THIS SHEET). THE SITE DISCHARGES TO AN EXISTING CONVEYANCE SYSTEM. REFER TO PERMANENT STORWMATER CONSIDERATIONS SECTION OF THE EROSION AND SEDIMENT CONTROL NARRATIVE FOR
MORE DETAILED INFORMATION.
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
PIPE OUTFALL PROTECTION - RIPRAP APRON
dmin = 1.5 X D50 = 1.5 X 0.9 FT = 1.35 FT
APRON DEPTH:
DOWNSTREAM: Do + La = 12'
UPSTREAM: 3 X D = 6 FT (MIN.)
APRON WIDTH:
OUTLET VELOCITY = 4.94 FT/S
LENGTH La = 3 FT (MIN.)
DISCHARGE Q = 7.72 CFS (10-yr)
DIAMETER D = 24"
APRON LENGTH:
USED MINIMUM TAILWATER CONDITION
APRON MATERIAL:
APRON MATERIAL = CLASS AI RIPRAP (PER VDOT SPECS)
USE 9 FT TO BE CONSERVATIVE
NOTE: THE RISER SHALL BE INSTALLED ABOVE A 12" LAYER OF VDOT 21-A
LEVELING COARSE.
VOL. OF WATER DISPLACED = 116 CF
WEIGHT OF WATER DISPLACED = 49.7 CUBIC FEET X 62.4 LBS/ CF
= 3,101 LBS WATER
VOL. OF RISER = ((OUTER AREA - INNER AREA) X HEIGHT ABOVE INVERT) - HOLES
= ((12.56 - 7.1) X 3.2) - 0.25
= 17.2 CF
WEIGHT OF CONCRETE RISER = (17.2 CUBIC FT X 150 LBS/CF)
= 2583.3 LBS CONCRETE
VOL. OF BASE = (BASE AREA X HEIGHT BELOW INVERT)
= 12.56 SF * 3.0 FT
= 37.68 CF
WEIGHT OF BASE = (37.68 CF X 150 LBS/CF)
= 5,652 LBS CONCRETE
TOTAL COUNTERWEIGHT = WEIGHT OF RISER + WEIGHT OF BASE
= 2,583 LBS + 5,652 LBS
= 8,235 LBS
CHECK IF COUNTERWEIGHT > WEIGHT OF WATER DISPLACED X (SAFETY FACTOR):
8,235 LBS > 3,101 LBS X (SAFETY FACTOR)
8,235 LBS > 3,101 LBS X (1.26)
8,235 LBS > 3907.26 ... RISER WILL NOT FLOAT
FLOTATION CALCULATIONS
DA-3
VELOCITYPROPOSEDCHANNEL
CHANNEL
1.35
(FT/S)
6.33
DEPTH (FT)
0.7520.12
FLOW (CFS)
0.05
NOTES:
1) THE 10-YR DISCHARGE WAS USED FOR THE CHANNEL DESIGN.
SLOPE (FT/FT)
RECOMMENDED
EC-3
(D)
SHEAR
STRESS CHANNEL LINING
(LBS/FT)
SCC-1
DRAINAGE
AREA
EC-2DV-1
MAXCHANNEL
WIDTH (FT)
(A)
5.0
STORMWATER CONVEYANCE CHANNEL DESIGN TABLE
SIDE
SLOPE
2:1
2.0 0.018 12.48 0.75 3:1 4.0 0.52
0.604.940.757.720.06 EC-3SCC-2 3.0 2.5:1
FLOW
DEPTH (FT)
0.52
(D)
0.74
0.46
DA-1
DA-1A (DISTURBED)
TC CALCULATIONS
DA-1A (STABILIZED)
DA-2 (ALL CONDITIONS)
DA-1 (PRE DEVELOPMENT)
CURVE NUMBER CALCULATIONS
EXISTING CONDITIONS
DA-1
DA-2
PROPOSED (DISTURBED CONDITIONS)
DA-1
DA-3
DA-2
PROPOSED (FINAL STABILIZATION)
DA-1
DA-3
DEWATERING DEVICE
6" DRAINAGE TUBING AND/OR A RISER PIPE IS TO BE TEMPORARILY
ATTACHED TO THE 3" EXTENDED-DETENTION ORIFICE OF THE RISER
STRUCTURE TO FUNCTION AS THE SEDIMENT BASIN DEWATERING DEVICE.
SEE DETAIL, SHEET 3.
BASIN VOLUME DESIGN
OUTLET CULVERT BARREL DIAMETER
OULET CULVERT BARREL LENGTH
PRIMARY RISER INNER DIAMETER
BARREL INVERT DOWN ELEVATION
BARREL INVERT UP ELEVATION
BOTTOM OF BASIN
CLEANOUT ELEVATION
ELEV. OF START OF PERFORATED TUBING (WET POOL)
PRINCIPLE SPILLWAY CREST
DESIGN HIGH WATER (25-YR)
TOP OF DAM ELEVATION (TEMPORARY)
DISTANCE FROM TOP OF RISER TO CLEANOUT LEVEL
AVAILABLE WET VOLUME BEFORE CLEANOUT REQ.
REQUIRED TOTAL AVAILABLE BASIN VOLUME
PROVIDED TOTAL AVAILABLE BASIN VOLUME
PROVIDED DRY STORAGE VOLUME
REQUIRED DRY STORAGE VOLUME
PROVIDED WET STORAGE VOLUME
REQUIRED WET STORAGE VOLUME
DESIGN ELEVATIONS
350.0ft msl ft msl inches inches feet
349.5
1.5feet ft msl ft msl ft msl ft msl ft msl ft msl
347.0 348.5 352.0 N/A 352.57 356.0 cu yds cu yds cu yds cu yds cu yds cu yds cu yds
SEDIMENT BASIN SIZING TABLE
TOTAL AREA DRAINING TO BASIN
LOCATION
acres
UNITS
SB-1
3.84
OULET STRUCTURE DESIGN
DA-2
DRY STORAGE VOLUME (DV): 7,146 CF
DRY STORAGE ELEV.(FROM STAGE-STORAGE): 351.24 FT (MSL)
ELEV. OF START OF PERFORATED TUBING: 350.00 FT (MSL)
H (MAX): 1.24 FT
H (AVG): 1.24 FT/2 = 0.62 FT
REQUIRED MINIMUM DRAWDOWN: 6 HRS
Q: DV / (6*3600) = 7,146 / (6*3600) = 0.33 CFS
Q (MAX): 0.33*2 = 0.66 CFS
A (ORIFICE AREA): Q/[(64.32*h) 1
2*(0.6)] SF
0.123 SF
D (ORIFICE DIAMETER): 2*(A/3.14) 1
0.396 FT
4.75 INCHES
PROPOSED DESIGN: PROPOSED 3 INCH ORIFICE FOR 1-YR, 24-HR ED IS
SUFFICIENT (ATTACH 6" OR LARGER DIAMETER
PERFORATED TUBING WITH FERNCO-STYLE
COUPLING TO ED ORIFICE, SEE DETAIL, SHEET 3)
1. MATERIALS - REINFORCED CONCRETE PIPE SHOULD HAVE BELL AND SINGULAR SPIGOT
JOINTS WITH RUBBER GASKETS AND SHOULD EQUAL OR EXCEED ASTM DESIGNATION
C-361.
2. BEDDING - ALL REINFORCED CONCRETE PIPE CONDUITS SHOULD BE LAID IN AN
APPROPRIATE BEDDING MATERIAL IN ACCORDANCE WITH VDOT SPECIFICATIONS, OR AS
OTHERWISE NOTED HEREIN.
3. LAYING PIPE - BELL AND SPIGOT PIPE SHOULD BE PLACED WITH THE BELL END UPSTREAM.
JOINTS SHOULD BE MADE PER RECOMMENDATIONS FROM THE MANUFACTURER. AFTER
THE JOINTS ARE SEALED FOR THE ENTIRE RUN OF PIPE, THE BEDDING SHOULD BE PLACED
SO THAT ALL SPACES UNDER THE PIPE ARE FILLED. CARE SHOULD BE TAKEN TO PREVENT
ANY DEVIATION FROM THE ORIGINAL LINE AND GRADE OF THE PIPE.
4. BACKFILL - ALL BACKFILL MATERIAL AND PLACEMENT SHOULD CONFORM TO STRUCTURE
BACKFILL SPECIFICATIONS IN MINIMUM STANDARD 3.01, EARTHEN EMBANKMENT OF THE
VIRGINIA STORMWATER HANDBOOK AND APPROPRIATE VDOT SPECIFICATIONS, AS
APPLICABLE.
REINFORCED CONCRETE PIPE NOTES
PRECAST CONCRETE NOTES
PRECAST STRUCTURES WILL CONFORM WITH SECTION 114.02 OF THE VDOT SPECIFICATIONS.
CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR RISER & CONNECTIONS DEMONSTRATING WATERTIGHT SEALS &
ADEQUATE CONNECTORS TO RESIST BUOYANT FORCES.
THE MANUFACTURER WILL HAVE THE OPTION OF SELECTING THE COMBINATION OF PRECAST UNITS TO COMPLETE A
STRUCTURE UNLESS OTHERWISE NOTED ON THE PLANS.
OVERALL HEIGHT DIMENSIONS ARE APPROXIMATE ONLY FOR ESTIMATING PURPOSES AND THE ACTUAL DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR FROM FIELD CONDITIONS, WITH APPROVAL BY ENGINEER.
IN THE EVENT THE INVERT OF THE OUTFALL PIPE IS HIGHER THAN THE BOTTOM OF THE STRUCTURE, THE INVERT OF THE STRUCTURE SHALL BE SHAPED WITH CEMENT MORTAR TO PREVENT STANDING OR PONDING OF WATER IN THE STRUCTURE. THIS WILL APPLY TO ALL STRUCTURES MEETING THIS CONDITION. THE COST FOR INVERT SHAPING SHALL BE
INCLUDED IN THE PRICE BID FOR THE STRUCTURE.
ALL CONCRETE STRUCTURES TO BE CONSTRUCTED WITH 4000 PSI MINIMUM CONCRETE.
MANHOLE STEPS TO BE PROVIDED TO MEET LATEST OSHA REGULATION 29 CFR 1910.27, SECTION 16 OF ASTM
SPECIFICATION C478 AND SECTION 10 OF ASTM SPECIFICATION C497.
TWO 2" DIAMETER LIFT HOLES TO BE PROVIDE IN BASE UNIT. HOLES ARE TO BE LOCATED ABOVE THE CENTER OF GRAVITY
OF UNIT WITH CENTERS 180 DEGREES APART.
LIFT HOLES TO BE GROUTED & SEALED WATERTIGHT AFTER ASSEMBLY OF OUTFALL STRUCTURE.
THREE LIFT EYES OF MANUFACTURER'S DESIGN PER UNIT MAY BE SUBSTITUTED FOR LIFT HOLES.
ALL BASE, REDUCER AND RISER UNITS ARE TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF AASHTO M199, (ASTM C478).
BASE SECTION TO BE CAST MONOLITHIC INCLUDING BASE EXTENSION.
THE REQUIRED OPENINGS FOR PIPE SHALL BE FORMED, DRILLED OR NEATLY CUT AS APPROVED BY THE ENGINEER. THE CONTRACTOR WILL FURNISH THE FABRICATOR WITH THE ANGLES BETWEEN CENTER LINES, THE INVERT ELEVATIONS, AND THE SIZE OF ALL PIPES TO ENTER THE BASE OR RISER UNITS. FOR PIPE PENETRATIONS THE HOLES ARE TO BE A MINIMUM
OF 4" TO 8" LARGER THAN THE OUTSIDE DIAMETER OF THE PROPOSED PIPE.
ALL PIPE CONNECTIONS TO BE WATERTIGHT, FLEXIBLE AND DEFLECTION RESISTANT.
DIMENSIONS SHOWN ARE MINIMUM. ACTUAL DIMENSIONS MAY VARY WITH MANUFACTURER.
JOINT SEALANT AND INSIDE AND OUTSIDE GROUT TO BE PROVIDED FOR ALL JOINTS. JOINT SEALANT IS BUTYL RUBBER
MASTIC TYPE SEAL THAT CONFORMS TO LATEST AASHTO SPECIFICATION M-198.
REINFORCING STEEL WELDED WIRE FABRIC CONFORMS TO LATEST ASTM SPECIFICATION A185.
REINFORCING STEEL DEFORMED BARS CONFORM TO LATEST ASTM SPECIFICATION A6
THE CONSTRUCTION SPECIFICATIONS FOR EARTHEN EMBANKMENTS OUTLINED BELOW SHOULD BE CONSIDERED AS MINIMUM GUIDELINES, WITH THE UNDERSTANDING THAT MORE STRINGENT SPECIFICATIONS MAY BE REQUIRED DEPENDING UPON INDIVIDUAL SITE CONDITIONS. IN GENERAL, WIDELY ACCEPTED CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR EMBANKMENTS, SUCH AS THOSE DEVELOPED BY THE USDA SOIL CONSERVATION SERVICE OR THE U. S. ARMY CORPS OF ENGINEERS, SHOULD BE FOLLOWED. FURTHER GUIDANCE CAN BE FOUND IN THE SCS ENGINEERING FIELD MANUAL AND NATIONAL ENGINEERING HANDBOOK. SPECIFICATIONS FOR THE EMBANKMENT WORK SHOULD CONFORM TO THE METHODS AND PROCEDURES INDICATED FOR INSTALLING EARTHWORK, CONCRETE, REINFORCING STEEL, PIPE, WATER GATES, METAL WORK, WOODWORK AND MASONRY, AS THEY APPLY TO THE SITE AND THE PURPOSE OF THE STRUCTURE. THE SPECIFICATIONS SHOULD ALSO SATISFY ALL REQUIREMENTS OF THE LOCAL GOVERNMENT.
SITE PREPARATION AREAS DESIGNATED FOR BORROW SITES, EMBANKMENT CONSTRUCTION, AND STRUCTURAL WORK SHOULD BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL. ALL TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL SHOULD BE REMOVED. ALL CLEARED AND GRUBBED MATERIAL SHOULD BE DISPOSED OF OUTSIDE AND BELOW THE LIMITS OF THE EMBANKMENT AND RESERVOIR, AS DIRECTED BY THE OWNER OR HIS REPRESENTATIVE. WHEN SPECIFIED, A SUFFICIENT QUANTITY OF TOPSOIL SHOULD BE STOCKPILED IN A SUITABLE LOCATION FOR USE ON THE
EMBANKMENT AND OTHER DESIGNATED AREAS.
EARTH FILL
1. MATERIAL - FILL MATERIAL SHOULD BE TAKEN FROM ONSITE OR AN APPROVED, DESIGNATED BORROW AREA. IT SHOULD BE FREE OF ROOTS, STUMPS, WOOD, RUBBISH, STONES GREATER THAN 6 INCHES, AND FROZEN OR OTHER OBJECTIONABLE MATERIALS. FILL MATERIAL FOR THE CENTER OF THE EMBANKMENT AND THE CUTOFF TRENCH SHOULD CONFORM TO UNIFIED SOIL CLASSIFICATION GC, SC, OR CL. CONSIDERATION MAY BE GIVEN TO THE USE OF OTHER MATERIALS IN THE EMBANKMENT IF THE DESIGN AND CONSTRUCTION ARE SUPERVISED BY A GEOTECHNICAL ENGINEER.
2. PLACEMENT - AREAS ON WHICH FILL IS TO BE PLACED SHOULD BE SCARIFIED BEFORE ITS PLACEMENT. FILL MATERIAL SHOULD BE PLACED IN LAYERS A MAXIMUM OF 8 INCHES THICK (BEFORE COMPACTION), WHICH SHOULD BE CONTINUOUS OVER THE ENTIRE LENGTH OF THE FILL. THE MOST PERMEABLE BORROW MATERIAL SHOULD BE PLACED IN THE DOWNSTREAM PORTIONS OF THE EMBANKMENT. THE PRINCIPAL SPILLWAY MUST BE INSTALLED
CONCURRENTLY WITH FILL PLACEMENT AND NOT EXCAVATED INTO THE EMBANKMENT.
3. COMPACTION - FILL MATERIAL SHOULD BE COMPACTED WITH APPROPRIATE COMPACTION EQUIPMENT SUCH AS A SHEEPSFOOT, RUBBER-TIRED OR VIBRATORY ROLLER. THE NUMBER OF REQUIRED PASSES BY THE COMPACTION EQUIPMENT OVER THE FILL MATERIAL MAY VARY WITH SOIL CONDITIONS.
FILL MATERIAL SHOULD CONTAIN SUFFICIENT MOISTURE SUCH THAT THE REQUIRED DEGREE OF COMPACTION WILL BE OBTAINED WITH THE EQUIPMENT USED. THE MINIMUM REQUIRED DENSITY IS 95% OF MAXIMUM DRY DENSITY WITH A MOISTURE CONTENT WITHIN ± 2% OF THE OPTIMUM, UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. EACH LAYER OF THE FILL SHOULD BE COMPACTED AS NECESSARY TO OBTAIN MINIMUM DENSITY AND THE ENGINEER SHOULD CERTIFY, AT THE TIME OF CONSTRUCTION, THAT EACH FILL LAYER MEETS THE MINIMUM DENSITY REQUIREMENT. ALL COMPACTION IS TO BE DETERMINED BY EITHER STANDARD PROCTOR TEST (ASTM D698) OR THE MODIFIED PROCTOR TEST (ASTM D1557) AS DIRECTED BY THE GEOTECHNICAL ENGINEER BASED ON SITE AND SOIL CONDITIONS AND THE SIZE AND TYPE OF STRUCTURE BEING BUILT.
4. CUTOFF TRENCH - THE CUTOFF TRENCH SHOULD BE EXCAVATED INTO IMPERVIOUS MATERIAL ALONG OR PARALLEL TO THE CENTERLINE OF THE EMBANKMENT AS SHOWN ON THE PLANS. THE BOTTOM WIDTH OF THE TRENCH SHOULD BE GOVERNED BY THE EQUIPMENT USED FOR EXCAVATION, WITH THE MINIMUM WIDTH BEING 4 FEET. THE DEPTH SHOULD BE AT LEAST 4 FEET BELOW EXISTING GRADE OR TO AN IMPERMEABLE BEDROCK LAYER. THE SIDE SLOPES OF THE TRENCH SHOULD BE 1H:1V OR FLATTER. THE BACKFILL SHOULD BE COMPACTED WITH CONSTRUCTION EQUIPMENT, ROLLERS, OR HAND
TAMPERS TO ASSURE MAXIMUM DENSITY AND MINIMUM PERMEABILITY.
5. TOP SOIL - THE SURFACE LAYER OF COMPACTED FILL SHOULD BE SCARIFIED PRIOR TO PLACEMENT OF AT LEAST 6 INCHES OF TOP SOIL. THE TOP SOIL SHALL BE STABILIZED WITH IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION.
STRUCTURE AND CONDUIT BACKFILL
STRUCTURE AND CONDUIT BACKFILL BACKFILL THAT IS BESIDE PIPES OR STRUCTURES SHOULD BE OF THE SAME TYPE AND QUALITY AS SPECIFIED FOR THE ADJOINING FILL MATERIAL OR AS OTHERWISE NOTED HEREIN. THE FILL SHOULD BE PLACED IN HORIZONTAL LAYERS NOT TO EXCEED 4 INCHES IN THICKNESS AND COMPACTED BY HAND TAMPERS OR OTHER MANUALLY DIRECTED COMPACTION EQUIPMENT. THE MATERIAL SHOULD COMPLETELY FILL ALL SPACES UNDER AND BESIDE THE PIPE. DURING THE BACKFILLING OPERATION, EQUIPMENT SHOULD NOT BE DRIVEN CLOSER THAN 4 FEET, AS MEASURED HORIZONTALLY, TO ANY PART OF A STRUCTURE. ALSO, EQUIPMENT SHOULD NEVER BE DRIVEN OVER ANY PART OF A STRUCTURE OR PIPE, UNLESS COMPACTED FILL HAS BEEN PLACED TO A DEPTH SPECIFIED BY THE STRUCTURAL LIVE LOAD CAPACITY OF THE STRUCTURE OR PIPE IN ORDER TO
ADEQUATELY DISTRIBUTE THE LOAD.
DAM EMBANKMENT SPECIFICATIONS
16. ALL TESTS, STUDIES. ETC., WILL BE CARRIED OUT AT THE EXPENSE OF THE CONTRACTOR.
17. THE APPROVAL OF THESE PLANS SHALL IN NO WAY RELIEVE THE OWNER OF COMPLYING WITH OTHER
APPLICABLE LOCAL, STATE, AND FEDERAL REQUIREMENTS.
18. CBR TEST SHALL BE PERFORMED PRIOR TO DETERMINATION OF FINAL SUBGRADE ELEVATION. SUBBASE DEPTH IS BASED ON A CBR VALUE OF SIX (6) UNLESS OTHERWISE NOTED. SOILS TESTS OF SUBGRADE SHALL BE SUBMITTED FOR ACTUAL DETERMINATION OF REQUIRED SUBBASE THICKNESS PRIOR TO CONSTRUCTION, ALL SUBGRADE TO BE COMPACTED TO 95% DENSITY AT ±2% OF OPTIMUM MOISTURE CONTENT PER ASTM D698
METHOD UNLESS OTHERWISE DIRECTED BY AN APPROVED GEOTECHNICAL REPORT.
13. WILLIAMSBURG ENVIRONMENTAL GROUP, INC. DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. THE UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION, THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS. THE CONTRACTOR SHALL NOTIFY WILLIAMSBURG ENVIRONMENTAL
GROUP, INC. SO THAT APPROPRIATE REVISIONS CAN BE MADE TO THE PLANS.
1. ALL UTILITIES, INCLUDING ALL POLES AND STRUCTURES, SHALL BE AVOIDED BY THE BASIN CONSTRUCTION. IF UTILITY CONFLICTS ARE IDENTIFIED BY COORDINATION WITH MISS UTILITY , FIELD MODIFICATIONS MAY BE NECESSARY AND SHALL BE COORDINATED WITH THE DESIGN ENGINEER PRIOR TO COMMENCING WORK.
2. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS AND UTILITIES WHICH OCCUR AS A
RESULT OF…