BORROW SITE 5A
BENCHMARK - TOP
IRON PIN
ELEV=354.59
BENCHMARK - TOP
IRON PIN
ELEV=342.90
SHEET INDEX:
BORROW SITES B5A
MTC FORT PICKETT
DATEDATE
REVISIONS:
FIRST SUBMITTAL
DATE: 8/8/12
AREA OF DISTURBANCE:
TOTAL PROJECT AREA: 2.81 ACRES
1.38 ACRES
THIS PLAN ADDRESSES EROSION AND SEDIMENT CONTROL MEASURES ASSOCIATED WITH THE
PROPOSED BORROW SITE. NO BORROW ACTIVITY IS PROPOSED AT THIS TIME, BUT THIS PLAN IS
INTENDED TO PROVIDE A FRAMEWORK FOR PROJECT COMPLIANCE WHEN NECESSARY IN THE
FUTURE. THE CONTRIBUTING DRAINAGE AREA TO THE BORROW SITE IS APPROXIMATELY 1.71
ACRES AT OUTFALL 1 AND 0.40 AT OUTFALL 2. APPROXIMATELY 1.38 ACRES OF LAND
DISTURBANCE MAXIMUM ARE PROPOSED DURING THE BORROW ACTIVITIES.
600'200'0' 100'200' 400'
OWNER
SURVEYOR
ENGINEER
STATISTICAL DATA
WILLIAMSBURG ENVIRONMENTAL GROUP, INC.
5209 CENTER STREET
WILLIAMSBURG, VIRGINIA 23188
PHONE: (757) 220-6869
FAX: (757) 229-4507
ATTN: DANIEL PROCTOR, PE
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
U p d a te d
-2
-1
\4
B
A
E
S P la n .d w g
FAX: (434) 292-2901
BLACKSTONE, VA 23824
MTC FORT PICKETT BLDG T-232
COMMONWEALTH OF VA - DEPARTMENT OF MILITARY AFFAIRS
ATTN: DAVID SHORT
PHONE: (434) 292-2144
PROJECT LOCATION
1. COVER SHEET
2. EROSION AND SEDIMENT CONTROL PLAN PHASE I
3. EROSION AND SEDIMENT CONTROL PLAN PHASE II
4. EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
5. HYDROLOGY
PROJECT NARRATIVE:
A VSMP GENERAL CONSTRUCTION PERMIT SHALL BE OBTAINED,
AND A STORMWATER POLLUTION PREVENTION PLAN PREPARED
PRIOR TO LAND DISTURBANCE WHEN APPLICABLE.
B&B CONSULTANTS, INC.
E. FERRELL STREET
SOUTH HILL, VA 23970
PHONE: (434) 447-7621
FAX: (434) 447-4257
ATTN: LARRY HARTSOE, L.S.
NOTE: ALL ELEVATIONS CONTAINED HEREIN ARE BASED ON THE
SITE TEMPORARY BENCHMARK IDENTIFIED ON THIS SHEET.
VERTICAL DATUM REFERENCED TO MEAN SEA LEVEL PER
NAVD 88, OR AS OTHERWISE NOTED ON PLANS.
EROSION AND SEDIMENT CONTROL PLAN
DINWIDDIE COUNTY, VIRGINIA
VICINITY MAP: 1'' = 2000'
SOURCE: USGS 7.5 MINUTE SERIES TOPOGRAPHY MAP,
BLACKSTONE EAST, VA QUADRANGLE, (1966, (REV 1978)).
LATITUDE: 37° 2' 38.23" N
LONGITUDE: 77° 55' 48.17" W
10/12/12 REVISED PER DCR COMMENTS
W
O
N
J
U
R
A
D
E
X
C
M
P
BENCHMARK -
TOP IRON PIN
ELEV=354.59
352.5
352.5
352.5
1.71 AC
DA-1
0.4 AC
DA-2
353.5
TEMPORARY STOCKPILE
AREA AS NEEDED
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS
DATE:
8/8/12
DATE:
REVISIONS:
JOB#: 4475
SHEET: 2
SCALE:
1 INCH = 20 FEET
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
U p d a te d
-2
-1
\4
B
A
E
S P la n .d w g
90'30'0' 15'30' 60'
CONTOUR INTERVAL = 1 FOOT
E R
O S
IO
N
A N
D S
E D
IM
E
N T C
O N
T R
O L P
L A
N
M T C
F O
R T P
IC
K
E T T B
O R
R O
W S
IT
E
B B
D
IN
W
ID
D
IE
C O
U N
T Y
V
IR
G
IN
IA
P H
A S
E I
SF
SF
SF
SOILS CHARACTERISTICS TABLE
NAME
SOURCE: MTC FORT PICKETT GIS
APPLING ASHLAR COMPLEX 7-15% SLOPES105C
SOIL
GROUP
HSG
B
EXISTING CONTOURS
LEGEND:
PROJECT LIMITS
PROPOSED CONTOURS
PROPOSED CONSTRUCTION
ENTRANCE
PROPOSED LIMITS OF
DISTURBANCE
SITE BENCHMARK
SURVEYED EDGE OF GRAVEL
ROAD
DRAINAGE AREA BOUNDARY
PROPOSED SILT FENCE
SOIL TYPE (TYP) G
R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
TIME OF CONCENTRATION LINE (TC)
PRE
NOTE: ONLY ONE SOIL TYPE IN PROJECT AREA
CONSTRUCTION SEQUENCE PHASE I
1. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS PER THIS SHEET. STABILIZE
DIVERSION DIKE IMMEDIATELY AFTER INSTALLATION TO PREVENT EROSION.
2. STRIP TOPSOIL AND UNSUITABLE MATERIALS. PERFORM BORROW EXCAVATION.
STOCKPILE VARYING MATERIALS SEPARATELY.
3. IMMEDIATELY STABILIZE ALL DISTURBED AREAS WITH TEMPORARY SEEDING (OR
PERMANENT SEEDING WHEN FINAL GRADING IS ACHIEVED OR TO BE LEFT DORMANT
FOR MORE THAN 1 YEAR)
NOTE: GRADING SHOWN REFLECTS THE
MAXIMUM ANTICIPATED EXCAVATION
ASSOCIATED WITH THE BORROW ACTIVITY.
ACTUAL EXCAVATION MAY BE ADJUSTED IN
THE FIELD BASED ON QUANTITY AND/OR TYPE
OF MATERIAL NEEDED. DURING INTERIM
OPERATIONS BEFORE FINAL GRADES ARE
ACHIEVED, THE CONTRACTOR SHALL MAINTAIN
THE SAME DRAINAGE BREAKS SHOWN HEREIN
ALTHOUGH AT SLIGHTLY DIFFERENT
ELEVATIONS, ADDITIONAL TEMPORARY
CONTROLS SUCH AS SILT FENCE OR EXTENDED
DIVERSION DIKES MAY BE NECESSARY TO
ACCOMPLISH THIS.
NOTE: FOR PRE AND POST FLOWS, SEE
HYDROLOGIC SUMMARY ON SHEET 5
TS
W
N
J
U
R
A
D
X
C
M
P
BENCHMARK -
TOP IRON PIN
ELEV=354.59
352.5
352.5
352.5
1.71 AC
DA-1
0.4 AC
DA-2
353.5
E R
O S
IO
N
A N
D S
E D
IM
E
N T C
O N
T R
O L P
L A
N
M T C
F O
R T P
IC
K
E T T B
O R
R O
W S
IT
E
B A
D
IN
W
ID
D
IE
C O
U N
T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS
DATE:
8/8/12
DATE:
REVISIONS:
JOB#: 4475
SHEET: 3
SCALE:
1 INCH = 30 FEET
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
U p d a te d
-2
-1
\4
B
A
E
S P la n .d w g
90'30'0' 15'30' 60'
CONTOUR INTERVAL = 1 FOOT
P H
A S
E I I
CONSTRUCTION SEQUENCE PHASE I
1. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS PER THIS SHEET. STABILIZE
DIVERSION DIKE IMMEDIATELY AFTER INSTALLATION TO PREVENT EROSION.
2. STRIP TOPSOIL AND UNSUITABLE MATERIALS. PERFORM BORROW EXCAVATION.
STOCKPILE VARYING MATERIALS SEPARATELY.
3. IMMEDIATELY STABILIZE ALL DISTURBED AREAS WITH TEMPORARY SEEDING (OR
PERMANENT SEEDING WHEN FINAL GRADING IS ACHIEVED OR TO BE LEFT DORMANT
FOR MORE THAN 1 YEAR)
4. ONCE BORROW ACTIVITY IS COMPLETED, BRING SITE TO FINAL GRADE AND
STABILIZE.
5. APPLY MATTING TO CUT SLOPES.
6. WHEN FINAL STABILIZATION IS COMPLETE REMOVE SILT FENCE, AND ANY OTHER
REMAINING TEMPORARY EROSION AND SEDIMENT CONTROLS. APPLY PERMANENT
SEEDING TO DISTURBANCE FROM E&S CONTROL REMOVAL.
CONSTRUCTION SEQUENCE PHASE II
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
EXISTING CONTOURS
LEGEND:
PROJECT LIMITS
PROPOSED EC-2 MATTING
PROPOSED CONSTRUCTION
ENTRANCE
SITE BENCHMARK
PROPOSED FLOW PATH
LIMITS OF DISTURBANCE
PROPOSED PHASE 2 GRADES
PROPOSED PHASE 1 GRADES
TIME OF CONCENTRATION LINE
(TC) POST
NOTE: GRADING SHOWN REFLECTS THE
MAXIMUM ANTICIPATED EXCAVATION
ASSOCIATED WITH THE BORROW ACTIVITY.
ACTUAL EXCAVATION MAY BE ADJUSTED IN
THE FIELD BASED ON QUANTITY AND/OR TYPE
OF MATERIAL NEEDED. DURING INTERIM
OPERATIONS BEFORE FINAL GRADES ARE
ACHIEVED, THE CONTRACTOR SHALL MAINTAIN
THE SAME DRAINAGE BREAKS SHOWN HEREIN
ALTHOUGH AT SLIGHTLY DIFFERENT
ELEVATIONS, ADDITIONAL TEMPORARY
CONTROLS SUCH AS SILT FENCE OR EXTENDED
DIVERSION DIKES MAY BE NECESSARY TO
ACCOMPLISH THIS.
S N
O T E
S A
N D
D E
T A
IL
S
M T C
F O
R T P
IC
K
E T T B
O R
R O
W S
IT
E
B A
D
IN
W
ID
D
IE
C O
U N
T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS
DATE:
8/8/12
DATE:
REVISIONS:
JOB#: 4475
SHEET: 4
SCALE:
AS SHOWN
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
U p d a te d
-2
-1
\4
B
A
E
S P la n .d w g
NTS
DETAIL: STONE CONSTRUCTION ENTRANCE
12' MIN.
3' 5:1
SIDE ELEVATION
A6" MIN.
70' MIN.
OPERATION
OF INGRESS AND EGRESS
* MUST EXTEND FULL WIDTH
3" MIN.
3" MIN.
PLAN VIEW
SECTION A-A
ROADWAY
EXISTING
10' MIN.
A
(OPTIONAL)
MOUNTABLE BERM
ROADWAY
EXISTING
10' MIN.
10' MIN.
70' MIN.
FILTER CLOTH
EXISTING GROUND
12' MIN.
FILTER CLOTH
COURSE AGGREGATE
VDOT #1
4"
12"
SHALLOW
SLOPE
NETTING PROTECTIVE COVERINGS
MAY BE APPLIED ACROSS
THE SLOPE.
ON SHALLOW SLOPES, STRIPS
WHERE THERE IS A BERM AT THE TOP OF THE SLOPE,
BRING THE MATERIAL OVER THE BERM AND ANCHOR IT
BEHIND THE BERM.
BERM
ON STEEP SLOPES, APPLY
PROTECTIVE COVERING PARALLEL
TO THE DIRECTION OF FLOW
AND ANCHOR SECURELY.
STEEP
SLOPE
BRING MATERIAL DOWN TO A LEVEL AREA BEFORE
TERMINATING THE INSTALLATION. TURN THE END
UNDER 4" AND STAPLE AT 12" INTERVALS.
DITCH FLOW
IN DITCHES, APPLY PROTECTIVE COVERING
PARALLEL TO THE DIRECTION OF FLOW.
USE CHECK SLOTS AS REQUIRED. AVOID
JOINING MATERIAL IN THE CENTER OF
THE DITCH IF AT ALL POSSIBLE.
OF
DETAIL: EC-2 MATTING
NTS
PERMANENT SEEDING TEMPORARY SEEDING
NOTE:
CONTRACTOR MAY SELECT APPROPRIATE TEMPORARY SEED FROM THE LIST BELOW BASED ON TIME OF YEAR, TEMPORARY SEEDING IS ONLY NEEDED IF DISTURBED AREAS NOT YET AT FINAL GRADE WILL BE LEFT DORMANT FOR LONGER THAN 30 DAYS. PERMANENT SEEDING AND MULCHING SHALL BE USED IN ALL OTHER SITUATIONS
POINTS A SHOULD BE HIGHER THAN POINT B.
4. BACKFILL AND COMPACT3. STAPLE FILTER MATERIAL
2. EXCAVATE A 4" x 4" TRENCH
3' MAX.
FLOW
FLOW
CONSTRUCTION OF A SILT FENCE
(WITHOUT WIRE SUPPORT)
IT INTO THE TRENCH.
1. SET THE STAKES.
UPSLOPE ALONG THE LINE OF
STAKES.
TO STAKES AND EXTEND
SHEET FLOW INSTALLATION
THE EXCAVATED SOIL.
(PERSPECTIVE VIEW)
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
A
FLOW
A
6' MAX.
SF
4"
B
DETAIL: SILT FENCE
NTS
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
EROSION AND SEDIMENT CONTROL NARRATIVE
EROSION AND SEDIMENT CONTROL NOTES
1. THE PURPOSE OF THE EROSION CONTROL MEASURES SHOWN ON THESE PLANS SHALL BE TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS RESULTING FROM CONSTRUCTION ACTIVITIES FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS. IF FIELD INSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SITE, APPROPRIATE MODIFICATIONS SHALL BE MADE TO CORRECT ANY PLAN DEFICIENCIES. IN ADDITION TO THESE NOTES, ALL PROVISIONS OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL REGULATION SHALL APPLY TO THIS PROJECT.
2. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS
BY SHOVELING OR SWEEPING AND TRANSPORTED TO A DISPOSAL AREA.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 . THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH ALL
APPLICABLE MEASURES CONTAINED THEREIN WHICH MAY BE PERTINENT TO THIS PROJECT.
4. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING A LIVE WATERCOURSE SHALL
BE MET.
5. PERIODIC INSPECTIONS OF ALL EROSION CONTROL MEASURES SHALL BE MADE BY THE CONTRACTOR TO ASSESS THEIR CONDITION.
INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY 14 CALENDAR DAYS AND WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT OR EVERY 7 CALENDAR DAYS REGARDLESS OF WEATHER . THIS INCLUDES INSPECTION AFTER EVERY ERODIBLE RAINFALL EVENT AND THE REPAIR OF MEASURES DAMAGED BY SUB-CONTRACTORS. ANY NECESSARY REPAIRS OR CLEAN UP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
6. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT THE TIME OF CONSTRUCTION TO INSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. APPROVAL BY THE ENGINEER OR SITE INSPECTOR WILL BE REQUIRED FOR ANY DEVIATIONS
FROM THE APPROVED PLANS.
7. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY THE STATE INSPECTOR, ENGINEER, OWNER, OR HIS DESIGNATED
AGENT IF DEEMED NECESSARY.
8. ALL EROSION CONTROL DEVICES SHALL BE IN PLACE AND FUNCTIONAL AT ALL TIMES AND IF REMOVED FOR CONSTRUCTION
PROGRESS, SHALL BE REPLACED BY THE CLOSE OF EACH WORKDAY.
9. SURFACE FLOWS OVER CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER REDIRECTING FLOWS FROM TRANSVERSING THE SLOPES OR BY INSTALLING MECHANICAL DEVICES TO SAFELY LOWER WATER DOWNSLOPE WITHOUT CAUSING EROSION.
10. THE CONTRACTOR SHALL PLACE SOIL STOCKPILES AT THE LOCATIONS SHOWN ON THIS PLAN OR AS DIRECTED BY THE ENGINEER.
SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. OFF-SITE WASTE OR BORROW AREAS SHALL BE APPROVED PRIOR TO THE IMPORT OF ANY BORROW OR EXPORT OF ANY WASTE TO OR FROM THE PROJECT SITE.
11. ALL SLOPES STEEPER THAN 3:1 SHALL REQUIRE THE USE OF EROSION CONTROL BLANKETS TO AID IN THE ESTABLISHMENT OF A VEGETATIVE COVER. INSTALLATION SHALL BE IN ACCORDANCE WITH SPECIFICATION 3.36 (B/M) AND MANUFACTURER'S INSTRUCTIONS.
NO SLOPES SHALL BE CREATED STEEPER THAN 2:1.
12. THE CONTRACTOR SHALL COMPLETE DRAINAGE FACILITIES WITHIN 30 DAYS FOLLOWING COMPLETION OF ROUGH GRADING AT ANY POINT WITHIN THE PROJECT. OUTFALL CHANNELS FROM DRAINAGE STRUCTURES SHALL BE STABILIZED IMMEDIATELY AFTER CONSTRUCTION OF SAME. THIS INCLUDES INSTALLATION OF EROSION CONTROL STONE OR PAVED DITCHES WHERE REQUIRED.
13. PERMANENT OR TEMPORARY SOIL STABILIZATION MUST BE APPLIED TO ALL DENUDED AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL STABILIZATION MUST ALSO BE APPLIED TO DENUDED AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. SOIL STABILIZATION MEASURES INCLUDE
VEGETATIVE ESTABLISHMENT OR MULCHING.
14. IF DISTURBED AREA STABILIZATION IS TO BE ACCOMPLISHED DURING THE MONTHS OF DECEMBER, JANUARY, OR FEBRUARY, STABILIZATION SHALL CONSIST OF MULCHING IN ACCORDANCE WITH SPECIFICATION 3.35 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK THIRD EDITION, 1992 . SEEDING WILL THEN TAKE PLACE AS SOON AS THE SEASON PERMITS.
15. THE TERM SEEDING, FINAL VEGETATIVE COVER OR STABILIZATION, ON THIS PLAN SHALL MEAN THE SUCCESSFUL GERMINATION AND ESTABLISHMENT OF A STABLE COVER FROM A PROPERLY PREPARED SEEDBED CONTAINING THE SPECIFIED AMOUNTS OF SEED AND
FERTILIZER IN ACCORDANCE WITH THE SEEDING SCHEDULE LOCATED ON THIS SHEET.
16. TEMPORARY EROSION CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT SHALL BE SPREAD AND
SEEDED.
PROJECT DESCRIPTION
THIS PLAN ADDRESSES EROSION AND SEDIMENT CONTROL MEASURES ASSOCIATED WITH THE PROPOSED BORROW SITE. THIS PLAN IS INTENDED TO PROVIDE A FRAMEWORK FOR PROJECT COMPLIANCE WHEN NECESSARY BORROW ACTIVITY TAKES PLACE IN THE FUTURE.
THE PROPOSED PROJECT AREA IS APPROXIMATELY 2.81 ACRES WITH A MAXIMUM ANTICIPATED AREA OF DISTURBANCE OF 1.38 ACRES.
EXISTING CONDITIONS
EXISTING CONDITIONS CONSIST OF OPEN AREAS AND AN EXISTING PAVED ROAD TO THE WEST.
ADJACENT AREAS
ADJACENT ROADWAYS WILL BE PROTECTED THROUGH THE USE OF A CONSTRUCTION ENTRANCES. DOWNSTREAM CHANNELS WILL BE PROTECTED BY PROPOSED E&S MEASURES AS SPECIFIED ON SHEET 2 AND 3, MAINLY CONSISTING OF SILT FENCE AND/OR A
TEMPORARY SEDIMENT TRAP.
OFF-SITE AREAS
THIS PROJECT IS INTENDED TO SERVE AS AN OFFSITE BORROW SITE FOR ANOTHER PROJECT UNDETERMINED AT THIS TIME. A SEPARATE EROSION AND SEDIMENT CONTROL PLAN SHALL BE PROVIDED FOR ANY ACTIVITIES OUTSIDE THE PROJECT LIMITS SHOWN IN THESE
PLANS.
SOILS
A SOILS TABLE HAS BEEN PROVIDED ON SHEET 2 OF THIS PLAN SET. THE PROJECT AREA IS GENERALLY CHARACTERIZED BY TYPE "B" APPLING ASHLAR COMPLEX 7-15% SLOPES ADDITIONAL GEOTECHNICAL INFORMATION HAS BEEN PROVIDED BY BLUE RIDGE
GEOTECHNICAL, LLC.
CRITICAL AREAS
CRITICAL AREAS INCLUDE DOWNSTREAM RECEIVING STREAM CHANNELS AND SLOPES WHERE SHEET FLOW EXCEEDS 150 FEET IN LENGTH WHICH COULD POTENTIALLY LEAD TO RILL AND GULLY EROSION. THESE BORROW AREAS WILL BE PROTECTED WITH EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON SHEET 2, AND FINAL SITE REHABILITATION WILL RESTORE THE PROJECT AREA TO
STABLE CONDITIONS CONSISTENT WITH PRE-CONSTRUCTION STATE.
PERMANENT STORMWATER CONSIDERATIONS
THE ULTIMATE OUTFALL FOR THE PROPOSED SPOIL SITE IS LOCATED IN THE NORTHWESTAND SOUTH EAST EDGES OF THE PROJECT SITE.
THE SITE WILL BE FULLY STABILIZED WITH PERMANENT SEEDING UPON COMPLETION OF SPOIL ACTIVITY. THE PROPOSED BORROW ACTIVITIES WILL NOT INCREASE FLOWS AT THE SITE OUTFALL. ALL RUNOFF LEAVING THE PROJECT DISTURBANCE IS EXPECTED TO BE
SHEET FLOW
STRUCTURAL PRACTICES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 . THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, LATEST EDITION SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE, IN WRITING.
1. TEMPORARY STONE CONSTRUCTION ENTRANCE - STD. & SPEC. 3.02 - CONSTRUCTION ENTRANCES SHALL BE EMPLOYED TO REDUCE THE AMOUNT OF MATERIAL TRANSPORTED OFF-SITE BY CONSTRUCTION VEHICLES. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED AT THE LOCATION SHOWN ON SHEET 2 FOR THE DURATION OF THE CONSTRUCTION AND STABILIZATION.
2. SILT FENCE - STD. & SPEC. 3.05 - SILT FENCE SHALL BE PLACED AS SHOWN IN THESE PLANS TO PREVENT SEDIMENT TRANSPORT
OFFSITE.
3. DIVERSION DIKES - STD. & SPEC. 3.09
TEMPORARY DIVERSION DIKES SHALL BE USED TO DIRECT FLOW TO THE TEMPORARY SEDIMENT TRAP.
4. TEMPORARY SEDIMENT TRAP - STD. & SPEC. 3.13 - A TEMPORARY SEDIMENT TRAP SHALL BE USED TO PREVENT THE FLOW OF
SEDIMENT AWAY FROM THE CONSTRUCTION AREA.
5. STORMWATER CONVEYANCE CHANNEL - STD. & SPEC. 3.17 - A STORMWATER CONVEYANCE CHANNEL SHALL BE USED TO BREAK UP
SHEET FLOW AND PREVENT RILL EROSION.
6. OUTLET PROTECTION - STD. & SPEC. 3.18 - OPTLET PROTECTION WILL BE USED AT THE PIPE OUTFALL TO PREVENT EROSION OF THE
DOWNSTREAM CHANNEL.
7. SOIL STABILIZATION BLANKETS AND MATTING - STD. & SPEC. 3.36
STABILIZATION MATTING SHALL BE IMMEDIATELY APPLIED TO ALL DISTURBED SLOPES UPON COMPLETION OF CONSTRUCTION.
NON-STRUCTURAL PRACTICES
1. TEMPORARY SEEDING - STD. & SPEC. 3.31 - ALL EXPOSED SOIL SURFACES THAT ARE NOT TO BE FINE-GRADED FOR PERIODS LONGER THAN 30 DAYS SHALL RECEIVE TEMPORARY SEEDING. SELECTION OF THE TEMPORARY SEED MIXTURE SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 AS REFERENCED ON THIS SHEET.
2. PERMANENT SEEDING - STD. & SPEC. 3.32 - PERMANENT SEEDING SHALL BE USED TO STABILIZE DISTURBED AREAS BROUGHT TO FINAL GRADE BY ESTABLISHING PERENNIAL VEGETATIVE COVER. SELECTION OF THE PERMANENT SEED MIXTURE SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992 AS REFERENCED ON THIS SHEET.
3. MULCHING - STD. & SPEC. 3.35 - AREAS WHICH HAVE BEEN PERMANENTLY OR TEMPORARILY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING. MULCHING SHALL BE USED IN FALL FOR WINTER COVER AND DURING HOT AND DRY SUMMER
MONTHS.
MAINTENANCE PRACTICES
IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY
THE CONTRACTOR. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR:
3.02 - TEMPORARY STONE CONSTRUCTION ENTRANCE - THE ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODICALLY TOPDRESSING THE ENTRANCE WITH
ADDITIONAL STONE OR WASHING THE EXISTING STONE.
3.03 - CONSTRUCTION ROAD STABILIZATION - BOTH TEMPORARY AND PERMANENT ROADS MAY REQUIRE PERIODIC TOP DRESSING WITH NEW GRAVEL. SEEDED AREAS ADJACENT TO THE ROADS SHOULD BE CHECKED PERIODICALLY TO ENSURE THAT A VIGOROUS STAND OF
VEGETATION IS MAINTAINED.
3.05 - SILT FENCE - SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
3.09 - TEMPORARY DIVERSION DIKE - THE MEASURE SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET OR SEDIMENT TRAPPING FACILITY, AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION
TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY.
3.13 - TEMPORARY SEDIMENT TRAP - SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN VOLUME OF THE WET STORAGE. STONE IN THE SPILLWAY THAT IS CHOKED
WITH SEDIMENT SHALL BE REMOVED AND CLEANED OR REPLACED. THE TRAP SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND. THE TRAP SHALL BE CHECKED AFTER EACH RAINFALL EVENT FOR SEDIMENT CLEANOUT. WHEN THE SEDIMENT REACHES THE CLEANOUT LEVEL, THE SEDIMENT SHALL BE REMOVED AND PROPERLY DISPOSED OF.
3.17 - STORMWATER CONVEYANCE CHANNEL - DURING INITIAL ESTABLISHMENT, GRASS LINED CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND GRASS RE-ESTABLISHED AREAS IF NECESSARY. AFTER GRASS HAS BECOME ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO DETERMINE IF THE GRASS IS WITHSTANDING THE FLOW VELOCITIES WITHOUT DAMAGE. IF THE CHANNEL
IS TO BE MOWED, IT SHOULD BE DONE IN A MANNER THAT WILL NOT DAMAGE THE GRASS.
3.18 - OUTLET PROTECTION - ONCE RIPRAP INSTALLATION HAS BEEN COMPLETED, IT SHOULD REQUIRE VERY LITTLE MAINTENANCE. IT SHOULD, HOWEVER, BE INSPECTED PERIODICALLY TO DETERMINE IF HIGH FLOWS HAVE CAUSED SCOUR BENEATH THE RIPRAP OR FILTER FABRIC OR DISLODGED ANY OF THE STONE. CARE MUST BE TAKEN TO PROPERLY CONTROL SEDIMENT-LADEN RUNOFF WHICH MAY DRAIN TO THE POINT OF THE NEW INSTALLATION. IF REPAIRS ARE NEEDED, THEY SHOULD BE ACCOMPLISHED IMMEDIATELY.
3.36 - BLANKETING AND MATTING - ALL SOIL STABILIZATION BLANKETS AND MATTING SHOULD BE INSPECTED PERIODICALLY FOLLOWING INSPECTION, PARTICULARLY AFTER RAIN STORMS TO CHECK FOR EROSION AND UNDERMINING. ANY DISLOCATION OR FAILURE SHOULD ME REPAIRED IMMEDIATELY. IF WASHOUTS OR BREAKAGE OCCURS, REINSTALL THE MATERIAL AFTER REPAIRING DAMAGE TO SLOPE OR DITCH. CONTINUE TO MONITOR THESE AREAS UNTIL WHICH THEY BECOME PERMANENTLY STABILIZED; AT THAT TIME AN ANNUAL
INSPECTION SHOULD BE ADEQUATE.
EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS
THE INTENT OF THIS SECTION IS TO SUMMARIZE HOW THE EROSION AND SEDIMENT CONTROL MEASURES PROPOSED IN THE EROSION AND SEDIMENT CONTROL PLAN SATISFY THE 19 MINIMUM STANDARDS SET FORTH IN THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30-40). THE FOLLOWING IS A BRIEF SYNOPSIS OF THE MINIMUM STANDARDS (MS) AND HOW THEY ARE
ADDRESSED IN THE PLAN:
MS-1 STABILIZATION OF DENUDED AREAS - WITHIN SEVEN DAYS, PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS THAT MAY REMAIN DORMANT FOR LONGER THAN 30 DAYS. TEMPORARY AND PERMANENT SEEDING, MULCHING, BLANKETS AND MATTING, AND RIPRAP ARE SPECIFIED IN THE PLAN FOR STABILIZATION OF DENUDED AREAS.
MS-2 STABILIZATION OF SOIL STOCKPILES - DURING CONSTRUCTION, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES, (SEDIMENT TRAP).
MS-3 ESTABLISHMENT OF PERMANENT VEGETATION - A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT EROSION.
MS-4 TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES - ALL SEDIMENT TRAPPING MEASURES (INCLUDING SEDIMENT TRAP) SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE
UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5 STABILIZATION OF EARTHEN STRUCTURES - STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES IMMEDIATELY
AFTER INSTALLATION AS SPECIFIED IN THE PLAN.
MS-6 SEDIMENT TRAP AND BASINS - SEDIMENT BASINS ARE NOT USED IN THIS PLAN. THE SEDIMENT TRAP SHALL CONTROL DRAINAGE AREAS LESS THAN TO THREE ACRES. THE MINIMUM STORAGE CAPACITY SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA.
MS-7 DESIGN, CONSTRUCTION, AND STABILIZATION OF CUT AND FILL SLOPES - CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. MOST SLOPES ARE PROPOSED TO BE STABILIZED WITH BLANKETING AND MATTING AS SHOWN ON THE E&S PLAN. SLOPES FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8 CONCENTRATED RUNOFF DOWN SLOPES - CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE.
MS-9 ADEQUATE DRAINAGE PROTECTION FROM WATER SEEPS - IF THE CONTRACTOR IDENTIFIES WATER SEEPAGE FROM A SLOPE FACE, ADEQUATE DRAINAGE PER VESCH 3.28 OR OTHER APPROPRIATE PROTECTION SHALL BE PROVIDED.
MS-10 STORM SEWER INLET PROTECTION - NOT APPLICABLE FOR THIS PLAN SINCE THERE ARE NO STORM SEWER INLETS AFFECTED BY
THE PROPOSED CONSTRUCTION.
MS-11 STORMWATER CONVEYANCE PROTECTION - BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL
BE INSTALLED.
MS-12 WORK IN LIVE WATERCOURSE - THERE ARE NO WATERCOURSES LOCATED WITHIN THE PROJECT AREA.
MS-13 CROSSING LIVE WATERCOURSE - NONE OF THE PROPOSED SPOIL ACTIVITY IS EXPECTED TO CROSS A LIVE WATERCOURSE.
MS-14 REGULATION OF WATERCOURSE CROSSING - NO IMPACTS TO WATERCOURSES ARE ANTICIPATED FOR THIS PROJECT. SHOULD ANY IMPACTS TO WATERCOURSES BECOME NECESSARY, PROPER PERMITS MUST BE OBTAINED PRIOR TO CONSTRUCTION.
MS-15 STABILIZATION OF WATERCOURSE - THERE ARE NO WATERCOURSES LOCATED WITHIN THE PROJECT AREA.
MS-16 UNDERGROUND UTILITY LINE INSTALLATION - NO UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN THIS PLAN.
MS-17 VEHICULAR SEDIMENT TRACKING - WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE ROADWAY. WHERE SEDIMENT IS TRANSPORTED INTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
MS-18 REMOVAL OF TEMPORARY MEASURES - ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER THE FINAL SITE STABILIZATION OR WHEN TEMPORARY MEASURES ARE NO LONGER NEEDED.
MS-19 STORMWATER MANAGEMENT - THE PROPOSED SITE IMPROVEMENTS ARE NOT EXPECTED TO INCREASE HYDROLOGIC CONDITIONS AT THE SITE OUTFALL. PLEASE, REFER TO H&H SUMMARY TABLE AND PERMANENT STORWMATER CONSIDERATIONS SECTION OF THE EROSION AND SEDIMENT CONTROL NARRATIVE FOR MORE DETAILED INFORMATION.
H Y D
R O
L O
G Y
M T C
F O
R T P
IC
K
E T T B
O R
R O
W S
IT
E
B A
D
IN
W
ID
D
IE
C O
U N
T Y
V
IR
G
IN
IA
CHECKED BY:
DESIGNED BY:
DAP
DAP
DRAWN BY:
SMS
DATE:
8/8/12
DATE:
REVISIONS:
JOB#: 4475
SHEET: 5
SCALE:
AS SHOWN
\\l a n .w e g n e t.
c o m \W
E G
\W M
B G c a d \4 s\
F o rt
P ic ke tt P o te n tia l B o rr o w P it S ite s\
S to rm w a te r A n a ly si s\ E
S
P la n s\
U p d a te d
-2
-1
\4
B
A
E
S P la n .d w g
SEDIMENT TRAP SIZING CALCULATIONS
SEDIMENT
TRAP #
DRAINAGE AREA
(ACRES)
WET STORAGE
VOL REQUIRED
(CY)
DRY STORAGE
VOL REQUIRED
(CY)
TOTAL STORAGE
VOL REQUIRED
(CY)
WET
STORAGE
VOL.
PROVIDED
(CY)
DRY
STORAGE
VOL.
PROVIDED
(CY)
TOTAL
STORAGE
VOL.
PROVIDED
(CY)
DEPTH OF
DRY
STORAGE
'A'(FT)
TOP OF
BERM
ELEV.
(FT)
BOTTOM
OF BASIN
ELEV
(FT)
WET
POOL
ELEV
(FT)
DEPTH OF
WET
STORAGE
(FT)
SA AT
WET
STORAGE
(SF)
WEIR
LENGTH
(FT)
NOTES
1 0.60 40.2 40.2 80.4 41.0 54.0 95.0 3.00 339.00 332.00 336.00 4.00 1,874 3.6
G R
O U
P , I
N C
C e n te r S tr e e t
W ill ia m sb u rg
V ir g in ia
(7 -6
B o u ld e r
S p ri n g s D ri ve
S u ite
R ic h m o n d
V ir g in ia
(8 -3
R iv e rs id e P a rk w a y, S u ite
F re d e ri c ks b u rg
V ir g in ia
(5 -5
HYDROLOGIC SUMMARY
WATERSHED DATA
PRE-DEVELOPMENT
PROPOSED
PROPOSED
PRE-DEVELOPMENT
HYDROLOGIC SUMMARY
(IN/HR) (IN/HR)
INTENSITY INTENSITYTC (HR)C FACTORAREA (AC)
4.2 5.60.2030.231.47
3.25 4.350.3520.231.71
Q 10YRQ 2YR
1.711.28
2 YR 10 YR
NOTE:
1. THE PROPOSED RUNOFF CHARACTERISTICS ARE NOT EXPECTED TO INCREASE
FLOWS FROM THE SITE AREA.
2. THE C FACTOR WAS DERIVED USING TABLE 5-2 OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK. CONDITIONS USED FOR THIS PLAN WERE LAWNS -
HEAVY SOILS FLAT (0.15), PASTURE (0.20).
PRE-DEVELOPMENT
PROPOSED
5.1 6.70.1210.200.40
3.9 5.10.2480.200.40
DA-1
DA-2
1.891.42
Q 10YRQ 2YR
0.410.31
0.540.41
DA-1 DA-2
C FACTOR SUMMARY
TC SUMMARY TABLE