COLLECTIVE TRAINING
FACILITY FORT PICKETT,
BLACKSTONE, VA
Pre-Bid Conference
November 15, 2012
USPFO-AQS, Fort Pickett, Blackstone, VA
INTRODUCTION
Rebecca Fowler – Contract Specialist
CW3 Rick Thibeault – Contracting Officer, Supervisory Contract Specialist
CPT Matthew Swanson – Contracting
Officer’s Representative (COR)
AGENDA
• Conference
– Rules
– Synopsis of Requirement
– IFB Process
• Site Visit
CONFERENCE/SITE VISIT
“RULES”
• No intention of answering technical questions today.
• IFB, Page 10, Para 3.5
Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.
SYNOPSIS
• Construct fourteen new training structures and three new support facilities and retrofit fifteen existing training facilities on Fort Pickett, Blackstone, VA.
•The estimated cost range -$10M to $25M.
• A firm-fixed price contract will be awarded.
• Solicitation issued as HUBZone SBSA.
• The contract will be awarded as low price.
WHAT IS THE CONTRACT
PERIOD?
• Construction period is 548 calendar days from receipt of Notice to Proceed (NTP).
SOLICITATION, PLANS
& SPECIFICATIONS
• On the web:
– https://www.fbo.gov
– Solicitation
– Wage Determination
– Specifications & Drawings
– Bid Request for Information (BRIF) form
– Pre-Bid presentation & Sign-In Roster (will be posted)
– Amendments (if required)
• check regularly & refresh web page
IFB PROCESS
• In the invitation for bid (IFB) (FAR PART
14) process, a public bid opening occurs when the bids are due and the prices are read to the public
– There can be no discussion
– No correction of mistakes in most cases
DISCLAIMER
BIDDERS ARE STRONGLY
CAUTIONED TO CAREFULLY
READ THE REQUIREMENTS OF
THE SOLICITATION AND
COMPLY ACCORDINGLY.
IMPORTANT REMINDER
THE IFB PROCESS DOES NOT
ALLOW FOR DISCUSSION!!
WHAT YOU MUST SUBMIT
• Section 00010 of the IFB details the required information
– Standard Form (SF) 1442, pages 1 & 2
– Section 00010 Line Items
– Section 00600, Representations &
Certifications (including current and complete data at SAM)
– Valid Bid Bond
BID DUE DATE
• Bids are due 1000 Hours (10:00 A.M.), December 7, 2012
• Bid opening to be held at Bldg 316, 10th and Rives Streets, Fort Pickett, Blackstone, VA
• SF 1442, Page 1, Block 7 addresses where to mail bids
• Hand-carried bids – deposit in bid repository located at front entrance (10th Street) of Bldg 316
• Access to the bid repository is not available on Mondays
BID DUE DATE (continued)
• FedEx and UPS deliver to Bldg 316
– No guarantee of time for delivery
– Deliveries are not made on Mondays
• Bid must be signed by an official having authority to contractually bind the company
• No facsimile or electronic bids will be accepted
CONTRACT LINE ITEM
NUMBERS (CLINS)
• CLIN 0001 – New Construction
• CLIN 0002 – Retrofitting of Existing Facilities
• CLINs 0003-0007 – Additive Bid Items
HELPFUL WEBSITES
• https://www.sam.gov
• http://www.wdol.gov/dba.aspx
• https://www.fbo.gov https://www.sam.gov/ http://www.wdol.gov/dba.aspx
QUESTIONS AFTER
CONFERENCE/SITE VISIT
• Submit in writing only, preferably via email to:
rebecca.fowler@us.army.mil; Cc susan.quinn@us.army.mil and richard.r.thibeault@us.army.mil
• Submit not later than the 10th working day prior to bid opening (i.e. Bid Opening 7 Dec 12, questions must be submitted not later than 23 Nov 12).
DO NOT CALL TECHNICAL PERSONNEL,
INCLUDING DESIGNER - THIS WILL DELAY
GETTING AN ANSWER
mailto:rebecca.fowler@us.army.mil mailto:susan.quinn@us.army.mil mailto:richard.r.thibeault@us.army.mil
ANSWERS TO QUESTIONS
• All questions, on a non-attribution basis, and the answers will be posted to FedBizOpps (www.fbo.gov)
• If necessary addendums, issued by an amendment, will also be posted
• Check web site regularly and don’t forget to refresh web page!!
ANSWERS TO QUESTIONS
• Specification Section 087111, Paragraph 2.3 will be amended to include “approved equal”.
• Specification Section 087111, Paragraph 2.4 will be removed via amendment.
• Section 042000, Paragraph 2.4 will be removed via amendment as all brick has been removed from the project.
• This project is currently funded.
• During the solicitation phase, CADD drawings will not be made available.
• Regulations identify the project magnitude range our office is authorized to publish. Therefore, we are unable to specify a range magnitude “tighter” than $10M-$25M.
Questions ???
Site Visit Follows This Briefing
File details come from the government source that posted it. Updated .