Drawings, December 2018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attendance_Sheet_for_Bid_Opening.pdf | ||
| Abstract_of_Offers_1419_MSA_Cold_Storage.pdf | ||
| Bid_Opening_FBO_Instructions.docx | DOCX document | |
| Q&A_35-42.docx | DOCX document | |
| B.08.Q&A_33-34.docx | DOCX document | |
| B.08.W912J2-19-B-6004_Conform_Through_Amenement_5.pdf | ||
| B.08.W912J2-19-B-6004-0005.pdf | ||
| W912J2-19-B-6004-0004.pdf | ||
| XGFG162010_MSA_ACCESS_PLAN.pdf | ||
| XGFG162010_Amendment-1_Drawing.pdf | ||
| B.08.Q&A_20-32.docx | DOCX document | |
| W912J2-19-B-6004-0003.pdf | ||
| W912J2-19-B-6004-0002.pdf | ||
| B.08.Q&A_14-19.docx | DOCX document | |
| B.08.Q&A_4-13_Clarifications.docx | DOCX document | |
| Overall_Site_2.PNG | PNG image | |
| Overall_Site_PIC.PNG | PNG image | |
| Q&A_4-12.docx | DOCX document | |
| Overall_Site_1.PNG | PNG image | |
| W912J2-19-B-6004-0001.pdf | ||
| W912J2-19-B-6003-0001.pdf | ||
| Site_Visit_Attendance_Sheet.pdf | ||
| Q&A_1-3.docx | DOCX document | |
| W912J2-19-B-6004.pdf | ||
| XGFG162010_Project_Specs_DEC_2018.pdf | ||
| XGFG162010_Addendum-1.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERSTATE 94
INTERSTATE 90
INTERSTATE 90/94
INTERSTATE 90
INTERSTATE 94
WISCONSIN
MADISON
18 151
12 18
Lake Mendota
Lake Kegonsa
Lake Waubesa
M on on a
NORTH
VERONA
OREGON
WAUNAKEE
DEFOREST
DANE
CROSS
PLAINS
SUN PRAIRIE
BROOKLYN
BELLEVILLE
MOUNT
HOREB
MARSHALL
STOUGHTON
MIDDLETON
McFARLAND
DEERFIELD
CAMBRIDGE
COTTAGE
GROVE
MONONAMADISON
FITCHBURG
TRUAX
FIELD
T T
P
TAXIWAY "F"
SOUTH RAMP
T A
X
IW
A Y
B
TAXIWAY "D"
T A
X
IW
A Y
G
PIERSTORFF ST.
MITCHELL ST.
MILLER ST.
RED
W H
IT
E
YE
LL
O W
W H
IT
E
YE
LL
O W
W H
IT
E
W H
IT
E
YE
LL
O W
W H
IT
E
W H
IT
E
W H
IT
E
RED
Main Gate
Project Site
Base Civil Engineering
Office
HAUL ROUTE
ANG No.:
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
CONSTRUCT MSA COLD STORAGE
TRUAX FIELD ANGB
MADISON, WI
XGFG162010
TRUAX FIELD ANGB
T R
U A
X F
IE
L D
A N
G B
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
C O
N S
T R
U C
T M
S A
C O
L D
S T
O R
A G
E
G-001
COVER SHEET
XGFG162010ANG NO.:
3141300-160809.01
MAB
KSF
September 30, 2016
SZK
GENERAL
G-001 COVER SHEET
CIVIL
C-021 EXISTING SITE PLAN
C-041 SITE REMOVALS PLAN
C-081 OPERATIONS PLAN
C-101 SITE PAVEMENT AND UTILITY PLAN
C-121 GRADING AND EROSION CONTROL PLAN
C-122 BIORENTENTION GRADING AND EROSION CONTROL PLAN
C-501 DETAILS
STRUCTURAL
S-001 STRUCTURAL NOTES
S-101 FOUNDATION PLAN
S-111 FLATWORK PLAN
S-501 FOUNDATION DETAILS
ARCHITECTURAL
A-101 FIRST FLOOR PLAN
A-201 EXTERIOR ELEVATIONS
A-311 WALL SECTIONS
A-601 ARCHITECTURAL SCHEDULES
ELECTRICAL
E-001 NOTES, SYMBOLS & ABBREVIATIONS
E-101 FIRST FLOOR PLAN - LIGHTING & POWER
E-501 DETAILS AND SCHEDULES
SHEET INDEXPROJECT LOCATION
SITE MAP LOCAL VICINITY MAP
09/30/16 B-3 FINAL
1099672745M Text Box
DECEMBER 2018
1099672745M Text Box
DECEMBER 2018
CP6
CP7
CP8
B
B
B
B
B
B
B
B
B
B
E
BM1302
E
HH
D
S
D
S
HH
B
B
B
B
B
B x x x x x x x x x xx
W
V
W
V
W
V
W
V
BLDG 700
FFE=858.15
BLDG 705
FFE=857.11
TRANS
CONCRETE
ASPHALT
SURVEY CONTROL DATA
POINT #
BM1302
CP6
CP7
CP8
DESCRIPTION
BM FF
CP TAG-BURY
CP TAG-BURY
CP TAG-BURY
ELEVATION
857.11
857.39
857.98
858.38
NORTHING
504796.289
504701.443
504906.538
505101.951
EASTING
833715.882
833548.553
833767.255
833974.444
15" RCP
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
S D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
L D
A
N G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
S
C
O
T O
R A
G E
C-021
EXISTING SITE PLAN
WFK
CAJ
00 30 60
SURVEY DATA:
SURVEY DATE(S)
6/10/2016
COORDINATE SYSTEM DANE COUNTY
VERTICAL DATUM USGS NAVD 88
CONTROL SOURCE WISCORS
SURVEY UNITS US SURVEY FOOT
LEGEND:
BENCHMARK
BOLLARD
CONTROL POINT
DOWNSPOUT
DUCT MARKER
ELECTRICAL / COMMUNICATIONS PEDESTAL
ELECTRICAL TRANSFORMER BOX
ELECTRICAL SERVICE PANEL
ELECTRICAL HANDHOLE/PULLBOX
FIRE HYDRANT
GROUNDING ROD
LIGHT POLE
MANHOLE, ELECTRIC
MANHOLE, FIBER OPTIC
MANHOLE, SANITARY SEWER
MANHOLE, STORM SEWER
MANHOLE, TELECOMMUNICATIONS
POWER POLE
SOIL BORING
STORM FLARED END SECTION
WATER VALVE
COMMUNICATIONS
GAS
ELECTRIC, OVERHEAD
ELECTRIC, UNDERGROUND
EXISTING CONTOUR LINES
FENCE
FIBER OPTIC CABLE
SANITARY SEWER
CULVERT
SWALE
WATER
B
DS
TRANS
ESP
E
E
FO
S
D
T
W V xxx.x xxx.x
SITE SURVEY PLAN NOTES:
1. CONTOUR INTERVALS SHOWN ARE 1.0'.
2. PRIVATE SUBSURFACE UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON GROUND
MARKINGS PLACED BY CLIENT REPRESENTATIVE. MARKINGS MAY NOT BE BY BENEFIT OF
SUBSURFACE DETECTING INSTRUMENTS AS SOME WERE MARKED PER PERSONNEL BEST
RECOLLECTION.
3. PUBLIC SUBSURFACE UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON GROUND
MARKINGS PLACED BY DIGGERS HOTLINE. DIGGERS HOTLINE DOES NOT GUARANTEE THE
PRECISION OF THEIR MARKINGS. IN ACCORDANCE WITH WISCONSIN LAW, SUBSURFACE
UTILITIES MUST BE EXPOSED VIA HAND DIGGING BEFORE MACHINE DIGGING IS
PERMISSABLE. UTILITY LOCATION MARKINGS ARE VALID FOR ONLY 10 DAYS.
CONTRACTOR MUST ORDER NEW UTILITY LOCATE PRIOR TO ANY EXCAVATION.
4. SANITARY SEWER AND STORM SEWER LOCATIONS HAVE BEEN DETERMINED BY
OBSERVABLE SURFACE STRUCTURES AND RESPECTIVE FEATURES. INTERMEDIATE PIPE
LOCATIONS ARE APPROXIMATE AS ACCURATE LOCATIONS WERE NOT AVAILABLE AT TIME
OF SURVEY.
5. CONTROL POINTS AND BENCHMARKS SHOWN HEREON ARE FOR REFERENCE PURPOSES
ONLY. PRIOR TO STAKING, THE CONTROL MUST BE INDEPENDENTLY VERIFIED AS
UNDISTURBED. NO WARRANTY IS MADE WITH RESPECT TO THE ACCURACY OF CONTROL
SHOWN HEREON AS THEY ARE SUBJECT TO POTENTIAL DISTURBANCE.
WFK
AutoCAD SHX Text
E
B
B
B
B
B
B
B
B
B B
E
E
B
B
B
B
B
B
W
W
W
W
OHE
OHE
OHE
OHE
OHE
x x x x x x x x x x x x x xx
W
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
W
V
W
V
W
V
W
V
BLDG 705
FFE=857.11
TRANS
CONCRETE
ASPHALT
G
G
G
W
W
W
W
//W// //W//
//W//
//W//
//W//
W
W
W
W
W W W W W W W W W
//E// //E//
//E//
//E//
//E//
E E
E E
E E
E E
E E
E E
E E
G
//G//
//G
//G
//G//
//G//
G
E
//E//
//E//
//E//
//E//
E
E
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
SAW CUT PAVEMENT
AND REMOVE ASPHALT
2.5'
135.0'
RELOCATE EXISTING SWALE
CONTRACTOR TO REMOVE EXISTING WATER LINE
PRIVATE UTILITY (MG&E) TO REMOVE EXISTING POWER AND GAS (SEE NOTE 1)
(SEE NOTE 2)
(SEE NOTE 2)
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
C-041
SITE REMOVALS PLAN
KSF
CAJ
LGK
00 20 40
LEGEND:
REMOVE
RELOCATE SWALE
REMOVE ELECTRIC, UNDERGROUND
REMOVE GAS LINE
REMOVE TELEPHONE
REMOVE WATER LINE
SAW CUT PAVEMENT
ASPHALT REMOVAL
//E//
//G//
//T//
//W//
XXXXXXXXXXXXXXXXXXX
SITE DEMOLITION PLAN NOTES:
1. GENERAL CONTRACTOR SHALL COORDINATE WITH UTILITY (MG&E) FOR
RELOCATION OF THE GAS AND ELECTRICAL LINES BY MADISON GAS & ELECTRIC.
GENERAL CONTRACTOR SHALL CARRY AN ALLOWANCE FOR THIS WORK
ACCORDING TO SPECIFICATION SECTION 012100 ALLOWANCES.
2. VALVE OR LIVE TAP EXISTING WATER LINE IN ORDER TO PROVIDE WATER
SERVICE TO EXISTING FACILITIES.
1099672745M Rectangle
1099672745M Line
1099672745M Line
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
DECEMBER 2018
1099672745M Text Box EXIST. COMMUNICATION, CONTROL, SECURITY & FIBER OPTIC, HANDHOLE; E1-E7 SHALL REMAIN.
1099672745M Line
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Oval
1099672745M Oval
1099672745M Line
1099672745M Line
1099672745M Oval
1099672745M Line
1099672745M Line
1099672745M Oval
1099672745M Line
1099672745M Line
1099672745M Line
1099672745M Oval
1099672745M Line
1099672745M Line
1099672745M Line
1099672745M Line
1099672745M Line
1099672745M Text Box E1
1099672745M Text Box E2
1099672745M Text Box E3
1099672745M Text Box E4
1099672745M Text Box E6
1099672745M Text Box E7
1099672745M Line
1099672745M Callout EXIST. DUCT BANK TO REMAIN. REMOVE ALL EXIST COPPER & FIBER OPTIC CABLES. FURNISH & INSTALL NEW UNINTERUPPTED CABLES FROM BLDG. 700 SERVICE CONNECTION BLOCK TO POINT OF SERVICE CONNECTION @ EACH LOCATION
1099672745M Line
1099672745M Line
1099672745M Text Box
BLDG. 705
1099672745M Text Box
TO BLDG. 710 & 711 SERVICE POINT CONNECTIONS
1099672745M Text Box
TO BLDG. 716 SERVICE POINT CONNECTIONS
1099672745M Callout EXIST. DUCT BANK TO REMAIN. REMOVE ALL EXIST COPPER & FIBER OPTIC CABLES. FURNISH & INSTALL NEW UNINTERUPPTED CABLES FROM BLDG. 700 SERVICE CONNECTION BLOCK TO POINT OF SERVICE CONNECTION @ EACH LOCATION INCLUDING BLDG. 716, SERVICE TO ELEC. GATE, KEYPAD, INTERCOM AND CAMERA (NOT SHOWN).
1099672745M Line
1099672745M Line
1099672745M Text Box
TO BLDG. 700 SERVICE CONNECTION BLOCKS LOCATED IN ELEC CLOSET, NOT SHOWN.
1099672745M Line
1099672745M Polygonal Line
1099672745M Callout
ABANDON & REMOVE EXIST. DUCT BANK
1099672745M Callout
FURNISH & INSTALL NEW DUCT BANK
1099672745M Line
X
I
W
Y
B
C
T
I
V
E
R
U
N
W
TWY G
T
W
C
T
I
V
E
T
A
X
I
W
F
C
T
I
V
E
ALERT HANGAR
T
A
X
I W
F
E
R
E
A
T
A
X
I W
J
E
F
E
A
(WANG AIRCRAFT APRON)
RESTRICTED AREA
RED LINE
CONTRACTOR SHALL NOT CROSS
"RED LINE" INTO RESTRICTED
AREA AT ANY TIME
AVE. GROUND ELEV. 857.0
MAX. EQUIPMENT HEIGHT 887.0
HAUL ROUTE
PERMANENT BARRICADE LINE
BY WANG
C
L
C
L
C
L
FENCE
AIRCRAFT APRON
(ACTIVE)
(ACTIVE)
PROPOSED BUILDING
RED LINE
CONTRACTOR SHALL NOT CROSS
"RED LINE" INTO RESTRICTED
AREA AT ANY TIME
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
CONSTRUCTION LIMITS
Marking and Lighting
(a) Construction Equipment--All construction equipment must be marked with a 3 feet x 3 feet orange and white checkered flag and/or amber beacon.
For nighttime construction, cranes, and other construction equipment, as determined by the Airport Operations Department, must be lighted.
(b) Excavation/Stockpiles--Excavation adjacent to paved surfaces must be appropriately marked by barricades.
(c) Contractor shall barricade open excavations as required by the C.O.R.
Fuel Support
(a) Any type of fueling support facility or device used to refuel construction equipment is subject to WANG fire inspection. Local fire codes and safety standards shall be met prior to commencement of work.
Sweeping/Clean-up
(a) The Contractor shall have sweeping or vacuuming capabilities on-site at all times in order to remove debris as it occurs. Upon completion, the Contractor is responsible for insuring that the area of concern is returned to its original condition.
Haul Routes
(a) Haul routes and access to the construction sites will be discussed at the Pre-Bid Conference and are depicted on the Operations plans.
(b) During hauling operations, the Contractor shall provide a trained, security guard at the point(s) selected for the ingress and egress of men and equipment to the airport. A log of persons or vehicles shall be kept on forms to be furnished by the Contracting Officer and given to the COR each following day. Any incidents shall be immediately brought to the attention of the COR and Airport Director.
(c) The Contractor shall coordinate the location of any crossing of underground electrical circuits with the COR in an early operation. Any electrical circuits crossed shall then be checked for resistance to ground by Base Staff prior to the start of construction and all circuits shall have 50 megohm or greater resistance prior to the
Contractor crossing the circuit. The Contractor, under supervision of
COR and Airport Staff, shall check circuits after cessation of hauling. Any circuit showing less than 50 megohm shall be corrected by
Contractor at no additional compensation so as to provide at least 50 megohms resistance in that circuit. No additional compensation will be made for any corrective electrical work due to Contractor's operations.
(d) The Contractor shall conduct his operations on the airport in a manner that will minimize interference with the normal operation of those airport facilities that are designated under this contract to remain open to air traffic, and the Contractor shall implement all specified and other appropriate measures to ensure the safety of all users of the airport.
(e) Engineering Active Aircraft Operation Areas: Operations at Dane County
Regional Airport are controlled by the FAA control from 6:00 a.m. to
11:00 p.m. When a runway or taxiway is open to air traffic, the
Contractor must obtain clearance from the tower before any of his personnel or equipment proceeds onto or across the area. This will be accomplished by using a radio with frequency 121.9 MHz., furnished and operated by Contractor. A radio-equipped flag person shall be used to control vehicular traffic crossing active areas during hauling operations.
Radio Operations Person shall be checked out and approved by Airport
Operations personnel prior to using radios.
(f) Unused
(g) The Contractor shall provide "25 mph speed limit" signs and "haul route" signs spaced evenly along haul route.
(h) Contractors shall also abide by all WANG requirements contained within the specifications
(i) Contractor shall not use radio equipment or cell phones within 400' of aircraft
Enforcement
(a) Violation of these Rules and Regulations, depending upon severity of the violation, may result in one or more of the following:
(1) A verbal and/or written warning.
(2) Revocation of AOA badge and/or vehicle access permit.
(3) The contract work being stopped until corrective measures are taken to preclude a recurrence of the violations.
(b) Contractor shall also abide by all WANG requirements contained within the specification.
CONFORMS TO AC150/5370-2E
"OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"
Restricted Areas/Safety Areas
(a) Runways, Taxiways, and Apron: Construction activity adjacent to the runways, taxiways, and aprons which will be in use shall be coordinated with Airport Operations through the
COR. Construction activity will be authorized after Notams (notices to airmen) have been issued by the Airport (DCRA); and after it has been determined that the height of equipment and materials is beyond the reach of the aircraft or safely below any part of the aircraft using the operations areas which might overhang these areas. Information for runway approaches and other areas will be supplied by the COR if it is required.
(b) Except as provided on the contract plans or in contract special provisions or as may be authorized by the COR in writing, the Contractor shall not perform construction activities within 80 feet of the edge of an active taxiway or apron, within 250 feet of an active runway centerline, or within 1000 feet of a runway end. When so authorized to perform construction activities within such areas, the Contractor shall first implement appropriate marking and lighting provisions.
(c) Excavation and open trenches located within 250 feet from the centerline of an active runway shall be adequately signed, marked and lighted. Excavations and open trenches located adjacent to taxiway and apron pavement shall be adequately signed, marked and lighted.
(d) Equipment and materials shall not be stored or parked within 750 feet from the centerline of an active runway and within 250 feet from the centerline of an active taxiway, unless specifically provided in the contract documents or authorized in writing by the
COR. Debris shall not be deposited on any portion of an operational runway, taxiway, or apron. Should any debris be deposited accidentally, it shall be removed immediately.
(e Open-flame welding or torch-cutting operations are prohibited unless adequate fire and safety precautions are provided and have been approved by the Truax Fire Dept. All vehicles are to be parked and serviced behind the construction restriction line 750 feet or more from an active runway centerline or 200 feet from an active taxiway centerline.
Meetings and Correspondence
a. Contractor is required to attend coordination meetings as mentioned in the specifications at which safety issues will be discussed.
Effect on Aircraft/Airport Operations
a. Critical aircraft during construction operations consist of Design
Group IV Aircraft.
b. Construction equipment will not penetrate the part 77 surfaces.
SITE WAS APPROVED UNDER:
AIRSPACE CASE NO. 2004-AGL-748-NRA
DATED: 20-FEB-2004
CONTRACTORS PERSONNEL VEHICLES SHALL BE PARKED AT A LOCATION
OUTSIDE THE BASE FENCE PERIMETER. PERSONNEL TO BE TRANSPORTED TO
CONSTRUCTION SITE IN COMPANY MARKED VEHICLES.
C4
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
OPERATIONS PLAN
1" =200'-0"
NORTH
PLAN
4002001000
C-081
OPERATIONS PLAN
KSF
CAJ
LGK
COORDINATES (NAD 83)
POINT LATITUDE LONGITUDE HEIGHT
C4 (BUILDING) 43°08'05. 0738" 89°20'15.7560" 878.8
RUNWAY END COORDINATES (NAD 83)
RUNWAY LATITUDE LONGITUDE
18R 43°09'02.8296" 89°20'27.4834'
36L 43°07'27.9996" 89°20'31.9085"
14 43°08'52.4547" 89°20.296754"
32 43°08'10.6059" 89°19'35.3730"
3 43°07'59.8908" 89°20'30.4208"
21 43°09'02.0787" 89°19'43.3244"
CORRESPONDING RWY 3-21 ELEVATION = 859.8
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text 125.0'
AutoCAD SHX Text 93.0'
AutoCAD SHX Text 250.0'
AutoCAD SHX Text 59.0'
AutoCAD SHX Text 85.5'
AutoCAD SHX Text 129.5'
AutoCAD SHX Text 85.5'
AutoCAD SHX Text 129.5'
AutoCAD SHX Text
TO C-L
CP6
B
B
B
B
B B
E
BM1302
E
B
B x x x x x x x x x x x x x x x x x x x x x x x x x x
W
V
W
V
W
V
TRANS
E E
E
E E E E E E E E E E E E
E E
E
E E
E E
E E E E E E E E E E E E
E E
E
G G
G
G G G G G G G G G G G G
G G
G G
W W
W
W W W W W W W W W W W W W
W W
W
MSA COLD STORAGE
FFE=100'-0"=856.70
CONCRETE STOOP
(SEE STRUCTURAL)CONCRETE STOOP
(SEE STRUCTURAL)
ASPHALT PATCH
CONCRETE APRON
DOWEL ALL JOINTS,
CONCRETE APRON NOT
DOWELED TO BUILDING SLAB
CUT NEW SWALE, TYP
CONTRACTOR TO INSTALL WATER LINE
PRIVATE UTILITY (MG&E) TO INSTALL
GAS AND POWER LINES
(SEE NOTE 1)
CONNECT
TO EXISTING
CONNECT TO EXISTING
BLDG 705
FFE=857.11
RIPRAP OUTFALL FROM
ROOF DOWNSPOUTS, TYP
X
X X
X
X X
X X
CONNECT TO
EXISTING SWALE
CONNECT TO
EXISTING SWALE
5.0'
7.5'
130.0'
M I N
M I N
2.5'
7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 7.5' 5.0'2.5'
135.0'
2.5'
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
C-101
SITE PAVEMENT AND
UTILITY PLAN
KSF
CAJ
LGK
00 10 20
LEGEND:
WATER VALVE
GAS
ELECTRIC, UNDERGROUND
SWALE
WATER
ASPHALT
CONCRETE
X
ISOLATION JOINT
W V
G
E
W
SITE PAVEMENT AND UTILITY PLAN NOTES:
1. GENERAL CONTRACTOR SHALL COORDINATE WITH UTILITY (MG&E) FOR RELOCATION OF THE GAS AND
ELECTRICAL LINES BY MADISON GAS & ELECTRIC. GENERAL CONTRACTOR SHALL CARRY AN
ALLOWANCE FOR THIS WORK ACCORDING TO SPECIFICATION SECTION 012100 ALLOWANCES.
1099672745M Polygon
1099672745M Polygon
1099672745M Polygon
1099672745M Polygon
1099672745M Text Box
SEE ADDENDUM -1 & C-041
1099672745M Text Box
SEE ADDENDUM -1 & C-041
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Line
1099672745M Line
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Line
1099672745M Line
1099672745M Text Box
DECEMBER 2018
1099672745M Text Box EXIST. COMMUNICATION HANDHOLE. ADD 1-3" SCH 40 PVC CONDUIT. STUB 12" THRU FLOOR ADJ. TO ELECTRICAL ENTRANCE, SEE E-101.
1099672745M Line
1099672745M Oval
1099672745M Line
1099672745M Line
1099672745M Line
1099672745M Text Box
NEW 3" PVC
1099672745M Text Box E1
1099672745M Text Box E2
1099672745M Oval
1099672745M Oval
Polygonal Line
B
B B
E
BM1302
E
B
B
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
x x x x x x x x x x x x x x x x x x x x x x x x x
W
V
W
V
W
V
TRANS
857.0
856.5
.0
854.5
854.0
854.0
855.0
855.0
856.0
854.5
854.5
855.5
855.5
.5
MSA COLD STORAGE
FFE=100'-0"=856.70
BLDG 705
FFE=857.11
12" SEDIMENT LOG DITCH CHECK, TYP
(SEE 1/C-501)
SILT FENCE
(SEE 2/C-501)
EROSION MAT IN SWALE BOTTOM
(SEE 3/C-501)
RIPRAP OUTFALL FROM
ROOF DOWNSPOUTS, TYP
-0.50%
855.24
RELOCATED SWALE,
(SEE C-101)
855.04
854.41
855.91
855.47
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
C-121
GRADING AND
EROSION CONTROL
PLAN
KSF
CAJ
LGK
00 10 20
LEGEND:
DITCH CHECK
SILT FENCE
EROSION MAT
EXISTING CONTOUR LINES
PROPOSED CONTOUR LINES
GRADING LIMITS
SWALE
FINISHED / PROPOSED SPOT ELEVATION
FINISHED / PROPOSED SLOPE
SSSSSSSSSSSSSSS
xxx.x xxx.x xxx(.xx) xxx(.xx)
2%
3:1
EROSION CONTROL PLAN NOTES:
1. CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL SHALL COMPLY
WITH THE REQUIREMENTS OF THE WISCONSIN DEPARTMENT OF NATURAL
RESOURCES.
2. ALL EROSION CONTROL MEASURES SHALL BE ADJUSTED TO MEET FIELD
CONDITIONS.
3. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY
GRADING OR DISTURBANCE OF SURFACE MATERIAL.
4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL
MEASURES AS NEEDED.
5. EROSION AND SEDIMENT CONTROL SHALL BE INSPECTED WEEKLY AND
WITHIN 24 HOURS OF ANY RAIN EVENT OF 0.5-INCHES OR MORE IN A 24
HOUR PERIOD. A LOG OF ALL INSPECTIONS SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE PROJECT.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL OF
ALL SEDIMENT LEAVING THE SITE. EROSION CONTROL MEASURES SHALL
BE IN WORKING CONDITION AT THE END OF EACH WORKING DAY. THE
CONTRACTOR SHALL SWEEP THE ACCESS ROAD CROSSING THE APRON AT
LEAST ONCE PER DAY.
7. EROSION CONTROL MEASURES SHALL BE MAINTAINED BY THE
CONTRACTOR UNTIL THE SITE IS FULLY STABILIZED.
8. CONFORM WITH SPECIFICATION 31 23 19 FOR DEWATERING DISCHARGE
REQUIREMENTS.
1099672745M Polygon
1099672745M Polygon
1099672745M Polygon
1099672745M Polygon
1099672745M Line
1099672745M Line
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
SEE ADDENDUM -1
1099672745M Text Box
DECEMBER 2018
1099672745M Text Box
BLDG 705
1099672745M Text Box E2
1099672745M Text Box E1
1099672745M Oval
1099672745M Oval
1099672745M Polygonal Line
1099672745M Line
1099672745M Polygonal Line
Oval
W
W
W
W
W
W
W
W
W
W
V
W
V
W
V
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W
854.0
854.0
855.0
855.0
853.5
854.5
854.5
855.5
.5
856.5
.5
BIORETENTION AREA
SILT FENCE
(SEE 2/C-501)
12" SEDIMENT LOG DITCH CHECK
(SEE 1/C-501)
A
A
853.0
854.0
855.0
855.0
855.0
853.5
854.5
855.5
855.5
-0.50%
-0.50%
855.24
.0
.5
.5
CONNECT TO EXISTING SWALE
CONNECT TO EXISTING SWALE
EROSION MAT
(SEE 3/C-501)
200.0'
855.91
855.47
SECTION A-A
1.0'
6.0'
2' MINIMUM
ENGINEERED
SOIL
ELEVATION ~852.00
GROUND WATER
EXISTING
SWALE
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
C-122
BIORENTENTION
GRADING AND
EROSION CONTROL
PLAN
KSF
CAJ
LGK
00 10 20
LEGEND:
EROSION MAT
DITCH CHECK
SILT FENCE
EXISTING CONTOUR LINES
PROPOSED CONTOUR LINES
GRADING LIMITS
FINISHED / PROPOSED SPOT ELEVATION
FINISHED / PROPOSED SLOPE
SSSSSSSSSSSSSSS
xxx.x xxx.x xxx(.xx) xxx(.xx)
2%
3:1
1099672745M Text Box E2
Oval
SECTION
PERSPECTIVE
UNDISTURBED GROUND
GEOTEXTILE FABRIC
(SEE SPECIFICATION NOTES)
MINIMUM 8-INCH FABRIC IN A
4x4-INCH TRENCH OR A
4-INCH DEEP V-TRENCH,
TRENCH SHALL BE
BACKFILLED & COMPACTED
M I N
I M
U M
FLOW
F
L
O
W
M
A
X
I
M
U
M
S
2x2-INCH HARDWOOD
POST OR EQUIVALENT
TRENCH
GROUND
SURFACE
TWIST METHOD
HOOK METHOD
F L
O W
F L
O W
JOINING TWO LENGTHS OF SILT FENCE
SILT FENCE NOTES:
1. ENDS OF FENCE SHALL BE TURNED UPSLOPE 1 TO 2 FEET IN ELEVATION TO PREVENT FLANKING.
2. STAPLE FABRIC WITH MINIMUM 1/2-INCH STAPLES TO THE UPSLOPE SIDE OF THE POSTS.
3. FABRIC SHALL BE FROM A CONTINUOUS ROLL IF POSSIBLE. WHEN TWO SECTIONS OF FILTER
FABRIC ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY EITHER THE HOOK METHOD
WHERE TWO FENCES ARE OVERLAPPED 2'-0" AND EACH FENCE END IS ANGLED TOWARD THE
FLOW DIRECTION FOR THE 2'-0" LENGTH OR THE TWIST METHOD WHERE THE ENDS OF THE TWO
FENCES ARE OVERLAPPED AND TWISTED 180° UNTIL TWO POSTS ARE TOGETHER.
4. 8'-0" POST SPACING ALLOWED IF A WOVEN FABRIC IS USED.
5. FOLLOW WISCONSIN DNR TECHNICAL STANDARD 1056.
GEOTEXTILE FABRIC SPECIFICATIONS:
1. GRAB STRENGTH: 120 LB. MIN. IN ANY PRINCIPAL DIRECTION (ASTM-D-1682)
2. MULLEN BURST: MIN. 200 P.S.I. (ASTM D-3786)
3. EQUIVALENT OPENING SIZE:
· BETWEEN 50 AND 140 FOR SOILS WITH MORE THAN 15 PERCENT BY WEIGHT PASSING A NO.
200 SIEVE.
· BETWEEN 20 AND 50 FOR SOILS WITH LESS THAN 15 PERCENT BY WEIGHT PASSING A NO.
200 SIEVE.
4. WATER FLOW RATE OF 10 GAL/MIN/SQ.FT. AT 50MM CONSTANT HEAD IS DETERMINED BY
MULTIPLYING PERMITTIVITY IN SEC-1 AS DETERMINED BY ASTM D-4491 BY A CONVERSION
FACTOR OF 74.
5. ULTRA VIOLET RADIATION STABILITY OF 90%.
6. FABRIC WITH SUPPORT NETTING SHALL BE REINFORCED WITH AN INDUSTRIAL POLYPROPYLENE
NETTING WITH A 3/4 INCH SPACING OR EQUIVALENT. A HEAVY DUTY NYLON TOP SUPPORT
CORD OR EQUIVALENT IS REQUIRED.
GEOTEXTILE
FABRIC
POST
POST
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
POST
GEOTEXTILE
FABRIC
POST
M I N
I M
U M
M A
X I M
U M
2'
MAXIMUM
NOT TO SCALE
SILT FENCE DETAIL
EPOXY-COATED SMOOTH STEEL DOWELS, 1-INCH IN DIAMETER,
14-INCH IN LENGTH, SPACED AT 12-INCHES, PLACED IN BOTH DIRECTIONS,
OIL PRIOR TO CONCRETE PLACEMENT,
(PAINTED CAN BE SUBSTITUTED FOR EPOXY COATED)
ASPHALT PAVEMENT
(2-INCH BINDER, 2-INCH SURFACE)
SUBGRADE
8-INCH THICK PORTLAND
CEMENT PAVEMENT
T
JOINT SEALER
T
7" 7"
NOTE:
1. T = PAVEMENT THICKNESS (SEE 7/C-501)
NOT TO SCALE
DOWELED CONTRACTION JOINT DETAIL
T
JOINT SEALER
T
7" 7"
DOWELS THAT NEED TO BE DRILLED INTO EXISTING
CONCRETE SHALL HAVE HOLE BLOWN CLEAN AND DOWEL
EPOXIED. ALSO PLACE AT EXISTING PAVEMENTS WHERE
INDICATED AND AT CONTINUATION OF NEXT DAY PAVING
EPOXY-COATED SMOOTH STEEL DOWELS,
1-INCH IN DIAMETER,
14-INCH IN LENGTH, SPACED AT 12-INCHES,
PLACED IN BOTH DIRECTIONS,
OIL PRIOR TO CONCRETE PLACEMENT,
(PAINTED CAN BE SUBSTITUTED FOR EPOXY COATED)
NOTE:
1. T = PAVEMENT THICKNESS (SEE 7/C-501)
NOT TO SCALE
DOWELED CONSTRUCTION JOINT DETAIL
NOT TO SCALE
CONCRETE APRON DETAIL
BASE COURSE
SECTION
SUBGRADE
BASE COURSE
12-INCH DIAMETER
SEDIMENT LOG,
TRENCH LOG 3 TO 4-INCHES INTO GROUND
MINIMUM 3 STAKES DRIVEN
8-INCHES INTO GROUND,
MAXIMUM STAKE SPACING = 6-FEET
SECTION
NOT TO SCALE
SEDIMENT LOG DITCH CHECK DETAIL
4.
2.
5.
1.
3(A)
3(B)
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING SEED.
2. BEGIN AT THE TOP OF THE SLOPE OR CHANNEL BY ANCHORING THE
BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT
THE TRENCH AFTER STAPLING.
3. ROLL THE BLANKETS (3A.) DOWN OR (3B.) HORIZONTALLY ACROSS THE
SLOPE.
4. THE EDGES OF PARALLEL BLANKETS SHALL BE STAPLED WITH 4"
OVERLAP. USE ONLY BIODEGRADABLE STAPLES.
5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE OR CHANNEL,
PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH 6"
OVERLAP. STAPLE APPROXIMATELY 12" APART.
6. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SLOPE OR
CHANNEL BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS
AS RECOMMENDED BY THE MANUFACTURER.
7. USE EROSION CONTROL REVEGETATIVE MAT (ECRM) CLASS-1, TYPE-B.
CHANNEL INSTALLATION
SLOPE INSTALLATION
M
I
N
NOT TO SCALE
EROSION MAT INSTALLATION DETAIL
NOT TO SCALE
ASPHALT PAVEMENT DETAIL
ASPHALT PAVEMENT
(SEE 11/C-501)
CRUSHED AGGREGATE
BASE COURSE
EXISTING
ASPHALT PAVEMENT
EXISTING BASE COURSE
SAW CUT, APPLY TACK COAT
NOT TO SCALE
PAVEMENT TRANSITION DETAIL
CONCRETE PAVEMENT
(SEE 8/C-501)
SECTION
SUBGRADE
NOT TO SCALE
RIPRAP OUTFALL DETAIL
GEOTEXTILE FABRIC
TYPE "R"
M I N
I M
U M
LIGHT RIPRAP
(WISDOT SECTION 606)
FLARED
HEADWALL
M I N
I M
U M
8'
MINIMUM
LIGHT RIPRAP
(WISDOT SECTION 606)
GEOTEXTILE FABRIC
TYPE "R"
M I N
I M
U M
3.5 TO 4.5
PLAN
SECTION B-B
SECTION A-A
B
B
A A
NOTE:
BOTTOM OF TRENCH SHALL BE THE PIPE O.D. PLUS 16-INCHES
EXCAVATED
MATERIAL
BEDDING PER THE
SPECIFICATIONS
UNDISTURBED SOIL
PIPE O.D.
NOT TO SCALE
WATERMAIN BEDDING DETAIL
PLACE TACK ALONG CONCRETE
PRIOR TO PLACING THE ASPHALT,
CUT A JOINT AND SEAL THE INTERFACE
WITH APPROPRIATE SILICONE SEALANT
2% SLOPE
NOT TO SCALE
SIDEWALK DETAIL
4" 5'-0" 4"
5" THICK
4000 PSI CONCRETE
4" THICK GRANULAR FILL
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
3141300-160809.01
September 30, 2016
X
T
E C
H C
A D
C
D
W G
A
M
These documents shall not be used for any purpose or project for which it is not intended. Mead & Hunt shall be indemnified by the client and held harmless from all claims, damages, liabilities, losses, and expenses, including attorneys' fees and costs, arising out of such misuse or reuse of the documents. In addition, unauthorized reproduction of these documents, in part or as a whole, is prohibited.
XGFG162010
ANG NO.:
09/30/16 B-3 FINAL
T R
U A
X
F
I E
G
B
M A
D I S
O N
W
I
T R
U A
X
F
I E
G
B
C O
N S
T R
U C
T
M
O
R A
G E
X
T
E C
H C
A D
C
D
W G
A
M
DETAILS
KSF
CAJ
LGK
C-501
STRUCTURAL DESIGN CRITERIA
1. GOVERNING CODE: UFC 3-301-01, IBC 2015, ASCE 7-10
2. FLOOR LIVE LOAD (1603.1.1)
COLD STORAGE: 75 PSF
3. ROOF LIVE LOAD (1603.1.2)
MINIMUM ROOF LIVE LOAD: 20 PSF
4. ROOF SNOW LOAD (1603.1.3)
GROUND SNOW LOAD: PG = 35 PSF
FLAT ROOF SNOW LOAD: PF = 21.2 PSF
UFC FROST PENETRATION: 86" PER UFC
SNOW EXPOSURE FACTOR: CE = 0.90
SNOW LOAD IMPORTANCE FACTOR: IS = 0.80
THERMAL FACTOR: CT = 1.20
5. WIND DESIGN DATA (1603.1.4)
BASIC WIND SPEED (3-SECOND GUST): V3S = 115 MPH
RISK CATEGORY: "I"
WIND IMPORTANCE FACTOR: IW = 1.0
WIND EXPOSURE: "C"
INTERNAL PRESSURE COEFFICIENT: GCPI = +/- 0.18
6. EARTHQUAKE DESIGN DATA (1603.1.5)
RISK CATEGORY: "I"
IMPORTANCE FACTOR: IE = 1.0
MAPPED, MCE, 5% DAMPED, SPECTRAL ACCELERATIONS:
AT SHORT PERIODS: Ss = .08 G
AT A PERIOD OF 1 SECOND: S1 = .05 G
SITE CLASS: "D"
DESIGN EARTHQUAKE SPECTRAL ACCELERATIONS
AT SHORT PERIODS: SDS = .085 G
AT A PERIOD OF 1 SECOND: SD1 = .08 G
SEISMIC DESIGN CATEGORY: SDC = "B"
BASIC SEISMIC-FORCE-RESISTING-SYSTEM: SFRS = OMF (TABLE 12.2-1)
DESIGN BASE SHEAR: VS = .05 KIPS
SEISMIC RESPONSE COEFFICIENTS: CS = .024
RESPONSE MODIFICATION FACTOR: R = 3.5
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
7. GEOTECHNICAL DESIGN DATA (1603.1.6)
NET ALLOWABLE SOIL BEARING PRESSURE = 1500 PSF PER IBC,
BORINGS REVIEWED FROM PREVIOUS MUNITIONS COMPLEX
PROJECT: #23077-00-04004, DATED MAY, 2005.
8. FLOOD DESIGN DATA (1603.1.7)
BUILDING IS NOT LOCATED IN FLOOD HAZARD AREA; THEREFORE FLOOD
DESIGN DATA IS NOT REQUIRED
9. SPECIAL LOADS (1603.1.8)
SPECIAL LOADING CONDITIONS ARE NOT APPLICABLE TO THE DESIGN OF
THIS BUILDING; THEREFORE SPECIAL LOADS ARE NOT REQUIRED
10. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE (1603.1.9)
BUILDING IS DESIGNATED SEISMIC DESIGN CATEGORY B; THEREFORE
SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE ARE NOT REQUIRED.
GENERAL NOTES
G-1. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO START
OF CONSTRUCTION - RESOLVE ANY DISCREPANCY WITH ARCHITECT/ENGINEER.
G-2. FOR CLARITY, ALL EXTERIOR SLABS AND SIDEWALKS MAY NOT BE SHOWN.
FOR EXACT DIMENSIONS, LOCATIONS, JOINTS AND SCORE LINES, SEE
ARCHITECTURAL AND/OR CIVIL DRAWINGS.
G-3. VERIFY ALL SIZES, WEIGHTS AND LOCATIONS OF MECHANICAL AND ELECTRICAL
EQUIPMENT, ROOF PENETRATIONS, DUCTS, ETC. WITH MECHANICAL AND
ELECTRICAL CONTRACTORS AND FIELD CONDITIONS.
G-4. DETAILS MARKED "TYPICAL" MAY OR MAY NOT BE CUT ON PLANS, BUT SHALL
APPLY UNLESS NOTED OTHERWISE.
G-5. STRUCTURAL SYSTEM IS DESIGNED TO WORK AS A COMPLETED SYSTEM, ANY
SHORING OR BRACING NECESSARY DURING CONSTRUCTION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
G-6. SEE ARCHITECTURAL AND ELECTRICAL PLANS FOR SLEEVES, INSERTS, ETC.
NOT SHOWN ON STRUCTURAL PLANS.
G-7. NO PIPES OR SLEEVES FOR MECHANICAL TRADES SHALL PASS THROUGH
STRUCTURAL MEMBERS WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER.
G-8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL SITE SAFETY AND ALL
ACCIDENTS WHICH RESULT IN DEATH, PERSONAL INJURY, OR DAMAGE TO
PROPERTY ARISING OUT OF OR IN CONNECTION WITH THE PERFORMANCE OF
THE WORK.
G-9. IT IS THE OWNER'S RESPONSIBILITY TO POST LIVE LOADS PER SECTION 1603.3
OF THE GOVERNING CODE.
G-10. SECTIONS, DETAILS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED
TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE,
UNLESS OTHERWISE SHOWN.
DO NOT SCALE DRAWINGS!!!!
GENERAL SYMBOLS
KEYED NOTE
ELEVATION
DECK SPAN
STRUCTURAL SLAB TYPE
STRUCTURAL ELEVATION
DETAIL OR SECTION
STRUCTURAL SYMBOLOGY
MASONRY (CMU) WALL
ON CONCRETE FOOTING
CONCRETE FOOTING
CONCRETE FOUNDATION WALL
ON CONCRETE FOOTING
TOP OF FOOTING ELEVATION
TOP OF WALL ELEVATION
FOOTING STEP
STRIP FOOTING DESIGNATION
DENOTES DEPRESSION FOR
WALL/DOOR OPENING (-8" U.N.O.)
INDICATES PIER MARK
INDICATES PIER
INDICATES COLUMN
INDICATES CONCRETE FOOTING
INDICATES SPREAD FOOTING MARK
INDICATES NEW GRID DESIGNATION
(HEXAGON SHAPE AT EXISTING GRID)
TOF
96'-0"
TOW
100'-0"
SF1
A
F1 P1
FOUNDATION PLAN
FOUNDATION WALL DESIGNATIONFW08
SLAB X
S-201 #
S-501
ABBREVIATIONS
B.O.
CONCRETE & REINFORCING STEEL NOTES
MATERIAL PROPERTIES (U.N.O.)
COMPRESSIVE STRENGTH - F'c = 4 KSI CONCRETE REINFORCEMENT - Fy = 60 KSI (A615 GR 60)
CR-1. PROVIDE ONE (1) HOOKED REINFORCING BAR IN CONCRETE FOOTING
TO SERVE AS A “CONCRETE ENCASED ELECTRODE” IN ACCORDANCE WITH
THE NATIONAL ELECTRIC CODE. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR EXACT LOCATION. HOOKED REINFORCING BAR SHALL CONFORM TO
THE FOLLOWING:
A. UNCOATED, LOW-ALLOY STEEL, CONFORMING TO ASTM A706.
B. BAR SIZE NUMBER 4.
C. HOOKED AT ONE END ONLY.
D. MINIMUM HORIZONTAL LENGTH OF REINFORCING BAR ENCASED IN
CONCRETE FOOTING SHALL BE 20’-0” AS DEFINED IN NEC, ARTICLE 250.
E. MINIMUM VERTICAL PROJECTION OF REINFORCING BAR ABOVE
CONCRETE SLAB SHALL BE 0’-6”.
F. MINIMUM COVER ALL AROUND REINFORCING BAR SHALL BE 2”.
CR-2. ALL BAR LAPS SHALL CONFORM TO ACI 318 CLASS "B" SPLICE CRITERIA. USE
TOP BAR LAP LENGTHS FOR TOP BARS IN SLABS AND BEAMS OVER 14" DEEP.
MINIMUM BAR LAPS AS FOLLOWS U.N.O.:
#3:1'-4" #4:1'-4" #5:1'-10" #6:2'-7" #7:4'-2" #8:5'-2" #9:6'-4" #10:7'-8" #11:9'-0"
FOR TOP BARS PROVIDE 1.3 TIMES THE INDICATED LAP LENGTH.
CR-3. LAP LENGTH SHALL BE SPECIFICALLY NOTED ON SHOP DRAWINGS WHERE
MORE THAN ONE BAR MAKES UP A CONTINUOUS STRING.
CR-4. HORIZONTAL BARS SHALL BE DETAILED TO SHOW THE DISTANCE FROM AT
LEAST ONE END OF THE BAR TO THE NEAREST BUILDING GRID LINE OR WALL.
CR-5. REINFORCING SHALL BE DETAILED IN ACCORDANCE WITH ACI 315.
CR-6. ALL REINFORCEMENT BARS SHALL BE FABRICATED IN ACCORDANCE WITH
THE LATEST CRSI MANUAL OF STANDARD PRACTICE AND SHALL BE CLEAN
AND FREE OF GREASE AND SCALING RUST.
CR-7. CONTINUOUS TOP AND BOTTOM BARS, WHEN SHOWN IN TRANSVERSE SECTION
ONLY, SHALL BE LAPPED AS FOLLOWS:
TOP BARS NEAR MID-SPANS; BOTTOM BARS DIRECTLY OVER SUPPORTS, U.N.O.
CR-8. HOOK HORIZONTAL WALL AND BEAM REINFORCING BARS AT DISCONTINUOUS
ENDS, TYPICAL U.N.O. EXTEND REINFORCEMENT TO FAR FACE OF
PIERS/PEDESTALS AND/OR COLUMNS U.N.O.
CR-9. PROVIDE HOT/COLD WEATHER PROCEDURES AND PROTECTION IN
ACCORDANCE WITH ACI RECOMMENDATIONS AND PROJECT SPECIFICATIONS.
CR-10. CONCRETE REINFORCEMENT PROTECTION/CLEAR COVER, U.N.O.:
FOOTINGS:
BOTTOM & SIDES 3"
TOP 2"
WALLS:
EXTERIOR EXPOSURE 2"
INTERIOR EXPOSURE 1"
CR-11. PROVIDE ADDITIONAL #4 BARS AT 4'-0" LONG 1" BELOW TOP OF SLAB AT
45° TO ALL REENTRANT CORNERS,OPENINGS IN CONCRETE SLABS AND
AS INDICATED ON DRAWINGS.
CR-12. ALL CONCRETE FOUNDATION WALLS SHALL HAVE A MINIMUM OF (2) #5 BARS
CONTINUOUS TOP AND BOTTOM, UNLESS NOTED OR DETAILED OTHERWISE.
CR-13. EXTEND ALL PIER STEEL TO PROVIDE STD. HOOK UNDER FOOTING
REINFORCEMENT, UNLESS NOTED OTHERWISE.
CR-14. ALL CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM WITH THE
LOCAL BUILDING CODE REQUIREMENTS AND THOSE OF THE FOLLOWING
STANDARDS (LATEST EDITION):
"ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED CONC."
"ACI 315, DETAILS AND DETAILING OF CONCRETE REINFORCEMENT"
"ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BLDGS."
"ACI 307, RECOMMENDED PRACTICE FOR CONCRETE FORM WORK"
CR-15. SEE SECTION 033000 OF SPECIFICATIONS FOR INFORMATION REGARDING
CONCRETE MIX DESIGN, TESTING, MATERIALS, AND ADMIXTURES.
CR-16. ALUMINUM CONDUIT IS NOT PERMITTED TO BE EMBEDDED IN CONCRETE.
CR-17. REFER TO FLATWORK DRAWINGS AND/OR SPECIFICATIONS FOR
SLAB-ON-GRADE FINISH TYPES AND DEPRESSIONS REQUIRED FOR MATS,
TILE, AND OTHER FINISH MATERIALS.
CR-18. PROVIDE FOOTING DOWELS TO MATCH VERTICAL WALL REINFORCING.
WHERE WALL REINFORCING IS NOT INDICATED, DOWEL FOOTING TO
FOUNDATION WALLS WITH #5 REBAR AT 16" O.C. BY 3'-0" LONG, WITH
STANDARD HOOKS EMBEDDED A MINIMUM OF 9" INTO FOOTING.
CR-19. ALL PIER FOOTINGS TO HAVE DOWELS WITH STANDARD HOOKS OF SAME
SIZE AND QUANTITY AS PIER STEEL. DOWELS TO LAP PIER STEEL AS
REQUIRED FOR A CLASS "B" TENSION SPLICE.
CR-20. ALL OPENINGS IN CONCRETE FOUNDATION WALLS ARE TO HAVE (4) #5
DIAGONAL BARS EACH FACE OF THE WALL UNLESS OTHERWISE NOTED.
BARS SHALL EXTEND 2 FEET BEYOND OPENING ON EACH SIDE.
EARTHWORK NOTES
EW-1. SEE SPECIFICATIONS FOR DEFINITION OF MATERIALS AND COMPACTION
REQUIREMENTS.
EW-2. U.N.O., THE CONTRACTOR SHALL RETAIN AN INDEPENDENT, QUALIFIED
GEOTECHNICAL ENGINEERING FIRM/TESTING AGENCY TO IDENTIFY AREAS
OF POOR SOILS, TO MONITOR PROPER SUBGRADE PREPARATIONS AND TO
OVERSEE AND TEST THE PLACEMENT OF COMPACTED FILL MATERIAL.
EW-3. ALL SUBTERRANEAN STRUCTURES, UTILITIES, PIPING, ETC. IIN THE AREA
OF EXCAVATIONS TO BE LOCATED AND MARKED BY CONTRACTOR PRIOR
TO EARTH REMOVAL WORK. CONTRACTOR TO MAINTAIN MARKERS UNTIL
EXCAVATION ACTIVITIES HAVE CEASED. IF UNDERGROUND UTILITY
CONFLICTS ARE DISCOVERED BEFORE OR ENCOUNTERED DURING
EXCAVATION, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY.
EW-4. BEFORE PLACING FOOTINGS, FOUNDATIONS OR SLAB-ON-GRADE, THE
SUB-GRADE SHALL BE PREPARED AND INSPECTED AS REQUIRED BY THE
SPECIFICATIONS.
EW-5. EXISTING SOILS MAY EXPERIENCE A LOSS OF STRENGTH IF SURFACE
WATER IS ALLOWED TO ACCUMULATE IN THE EXCAVATIONS; DO NOT
ALLOW SURFACE WATER TO ACCUMULATE IN THE BOTTOM OF
EXCAVATIONS. COMPLY WITH SPECIFICATION SECTION 312319 DEWATERING.
EW-6. WHERE STRUCTURES DERIVE SUPPORT FROM FILL-SUPPORTED
FOUNDATIONS AND AT SLAB-ON-GRADE, FILL SHALL BE COMPACTED TO
98% OF STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698), U.N.O.
EW-7. NO FILL SHALL BE PLACED OVER FROZEN, MUDDY, OR OTHER DELETERIOUS
MATERIAL. NO FILL SHALL BE PLACED OVER A PREVIOUS LIFT THAT HAS
NOT BEEN ADEQUATELY COMPACTED PER SPECIFICATIONS.
EW-8. BACKFILL AGAINST FOUNDATION WALLS SHALL BE PLACED EVENLY ON ALL
SIDES IN ORDER TO ACHIEVE GENERALLY BALANCED LOADINGS.
STRUCTURAL TESTING AND INSPECTION
TI-1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT ALL STRUCTURAL
WORK FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY
STRUCTURAL INSPECTION PROVIDED BY OTHERS DOES NOT RELIEVE THE
CONTRACTOR OF THIS RESPONSIBILITY. ANY STRUCTURAL DEVIATIONS FROM
THE CONTRACT DOCUMENTS THAT ARE FOUND AT A LATER DATE AND ARE
DECLARED TO BE SIGNIFICANT BY THE STRUCTURAL ENGINEER SHALL BE
CORRECTED BY THE CONTRACTOR WITHOUT COST OR ANY DELAY TO THE
PROJECT SCHEDULE.
TI-2. THE CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING AGENCY TO
PROVIDE FIELD AND LAB TESTING OF CONSTRUCTION MATERIALS AND TO
PROVIDE CONSTRUCTION INSPECTIONS. THE CONSTRUCTION INSPECTION
SHALL BE DONE BY QUALIFIED INSPECTORS THAT ARE SATISFACTORY TO
THE CONTRACTING OFFICERS REPRESENTATIVE.
TI-3. THE CONTRACTOR SHALL PROVIDE THE TESTING AND INSPECTING AGENCY
ACCESS TO ALL PLACES WHERE THE WORK IS BEING PERFORMED. A
MINIMUM OF 24 HOURS NOTIFICATION SHALL BE GIVEN TO THE TESTING
AGENCY AND CONTRACTING OFFICERS REPRESENTATIVE PRIOR TO THE
COMMENCEMENT OF WORK REQUIRING TESTING OR INSPECTION.
TI-4. THE TESTING AGENCY IS NOT AUTHORIZED TO DIRECT OR APPROVE ANY
CHANGES FROM THE CONTRACT DOCUMENTS. IF THE CONTRACTOR WISHES
TO QUESTION THE TESTING AGENCY'S INTERPRETATION OF THE CONTRACT
DOCUMENTS, HE MAY DO SO DIRECTLY WITH THE CONTRACTING OFFICERS
REPRESENTATIVE
TI-5. THE TESTING AGENCY IS NOT AUTHORIZED TO STOP OR DELAY THE WORK. IF
THE CONTRACTOR ELECTS TO CONTINUE WITH A CERTAIN PORTION OF WORK
AFTER BEING NOTIFIED BY THE TESTING AGENCY THAT SUCH WORK IS NOT IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR
DOES SO AT THEIR OWN RISK AND MAY BE REQUIRED TO CORRECT THE
WORK AT A LATER DATE.
TI-6. THE TESTING AND INSPECTING AGENCY IS NOT INSPECTING FOR O.S.H.A.
COMPLIANCE OR REQUIRED TO INSPECT TEMPORARY CONSTRUCTION, SUCH
AS TEMPORARY BRACING. TEMPORARY CONSTRUCTION IS THE
CONTRACTOR'S SOLE RESPONSIBILITY.
TI-8. TESTING AND INSPECTION IS NOT REQUIRED FOR WORK PERFORMED AT AN
OFF-SITE FABRICATION SHOP, UNLESS SPECIFICALLY NOTED OR SPECIFIED
OTHERWISE.
TI-9. THE PROJECT SPECIFICATIONS TYPICALLY INDICATE THE FREQUENCY OF
CONSTRUCTION TESTING AND INSPECTIONS. WHERE THE FREQUENCY IS NOT
INDICATED, THE TESTING AGENCY SHALL SUBMIT A PROPOSAL OF
INSPECTION INTERVALS TO THE CONTRACTING OFFICERS REPRESENTATIVE.
TI-10. THE TESTING AND INSPECTING AGENCY SHALL ISSUE ONGOING REPORTS OF
INSPECTIONS AND TESTS TO THE CONTRACTOR, CONTRACTING OFFICERS
REPRESENTATIVE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN IF UNCORRECTED,
TO THE CONTRACTING OFFICERS REPRESENTATIVE.
TI-11. INSPECTION AGENCY SHALL INSPECT FOR CONFORMANCE TO SPECIFIED
REQUIREMENTS FOR PROTECTING NEW CONCRETE AND MASONRY FROM THE
ADVERSE EFFECTS OF WEATHER, HEATING EQUIPMENT AND OTHER
POTENTIALLY HARMFUL CONDITIONS.
TI-12. CONSTRUCTION TESTING AND INSPECTION BY THE TESTING AND INSPECTING
AGENCY IS REQUIRED AS FOLLOWS:
A. CONCRETE TESTING PER THE SPECIFICATIONS.
B. CONCRETE INSPECTION SHALL INCLUDE THE PLACEMENT OF REINFORCEMENT.
REINFORCING BAR SIZES, SPACING, TIES, LAPS, AND COVER.
C. FIELD BOLTING INSPECTIONS SHALL INCLUDE VISUAL INSPECTION OF
ALL THE CONNECTIONS RELATED TO STRUCTURAL STEEL. THE SIZE,
TYPE, AND QUANTITY OF BOLTS AND THEIR INSTALLATION SHALL BE
INSPECTED. WHERE SLIP-CRITICAL OR PRE-TENSIONED BOLTS ARE
SPECIFIED, PRE-TENSIONING OF BOLTS SHALL BE VERIFIED BY TESTING.
TI-13. SPECIAL STRUCTURAL INSPECTIONS ARE REQUIRED AS FOLLOWS PER 2015
INTERNATIONAL BUILDING CODE:
A. STEEL CONSTRUCTION - PER TABLE 1705.2
B. CONCRETE CONSTRUCTION - PER TABLE 1705.3
C. SOILS - PER SECTION 1705.6
SHOP DRAWINGS
SD-1. SHOP DRAWINGS SHALL BE SUBMITTED FOR STRUCTURAL ITEMS AS REQUIRED
BY THE SPECIFICATIONS. CONSTRUCTION DOCUMENTS SHALL NOT BE
REPRODUCED FOR USE AS SHOP DRAWINGS.
SD-2. THE GENERAL CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS AND PRODUCT
DATA FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS PRIOR TO
SUBMITTAL. REVIEWED SUBMITTALS SHALL BE STAMPED BY THE CONTRACTOR.
ANY SHOP DRAWING OR PRODUCT DATA NOT REVIEWED AND STAMPED BY THE
GENERAL CONTRACTOR WILL BE REJECTED. GENERAL CONTRACTOR SHALL
CLOUD OR FLAG ALL ITEMS NOT IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS AND SHALL VERIFY ALL DIMENSIONS.
SD-3. ANY CHANGES, SUBSTITUTIONS OR DEVIATIONS FROM THE ORIGINAL CONTRACT
DRAWINGS SHALL BE CLOUDED BY THE MANUFACTURER OR FABRICATOR. ANY
CHANGES, SUBSTITUTIONS, OR DEVIATIONS WHICH ARE CLOUDED OR FLAGGED
BY SUBMITTING PARTIES SHALL NOT BE CONSIDERED APPROVED AFTER THE
ENGINEER'S REVIEW, UNLESS SPECIFICALLY NOTED ACCORDINGLY BY THE
ENGINEER.
SD-4. THE APPROVED SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACT
DRAWINGS. ITEMS OMITTED OR SHOWN INCORRECTLY ARE NOT TO BE
CONSIDERED CHANGES TO THE ORIGINAL CONTRACT DRAWINGS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ITEMS OMITTED OR SHOWN
INCORRECTLY ARE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT
DRAWINGS.
SD-5. SHOP DRAWING REVIEW IS INTENDED ONLY FOR GENERAL CONFORMANCE TO
THE DESIGN CONCEPT AND CONSTRUCTION DOCUMENTS.
SD-6. SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF MAJOR ERRORS ARE
FOUND DURING REVIEW.
SD-7. ALLOW A MINIMUM OF (10) WORKING DAYS FOR REVIEW OF SHOP DRAWINGS BY
THE STRUCTURAL ENGINEER.
PRE-ENGINEERED METAL
BUILDING (PMB) SYSTEM NOTES
MB-1. THE ENTIRE PRE-ENGINEERED METAL BUILDING SYSTEM SHALL BE
DESIGNED BY THE METAL BUILDING MANUFACTURER IN CONFORMANCE TO
THE INTERNATIONAL BUILDING CODE, UNIFIED FACILITIES CRITERIA
AND/OR STATE/LOCAL REQUIREMENTS, AND THE "LOW-RISE BUILDING
SYSTEMS MANUAL" AS PUBLISHED BY THE METAL BUILDING
MANUFACTURER'S ASSOCIATION. WHERE THESE CRITERIA CONFLICT, THE
MORE STRINGENT CRITERIA SHALL APPLY.
MB-2. IT IS THE PRE-ENGINEERED METAL BUILDING MANUFACTURER'S
RESPONSIBILITY TO DESIGN THE COMPLETE BUILDING SYSTEM (STEEL
FRAMING, ANCHOR BOLTS, PURLINS, GIRTS, BRACING, CONNECTIONS,
ROOFING, WALL PANELS, ETC.) SUBMIT A CERTIFICATION LETTER BEARING
THE SEAL OF A PROFESSIONAL ENGINEER STATING THE BUILDING
SYSTEM DESIGN MEETS THE INDICATED CODE, PERFORMANCE, AND
LOADING REQUIREMENTS.
MB-3 THE PRE-ENGINEERED METAL BUILDING MANUFACTURER SHALL BE
CERTIFIED BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION
CATEGORY MB.
MB-4 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE ENTIRE METAL
BUILDING SYSTEM FOR REVIEW. THE CONTRACTOR SHALL ALSO SUBMIT A
COMPLETE STRUCTURAL DESIGN ANALYSIS OF THE BUILDING SYSTEM.
THE SHOP DRAWING SUBMITTAL SHALL INCLUDE ALL ANCHOR BOLT
REQUIREMENTS AND FOUNDATION REACTIONS. ALL SHOP DRAWING AND
CALCULATION SUBMITTALS SHALL BEAR THE SEAL OF A PROFESSIONAL
ENGINEER.
MB-5 DESIGN LOADS TO BE USED IN CONNECTION WITH THE METAL BUILDING
DESIGN ARE PER THE "DESIGN CRITERIA". IN ADDITION TO THE ACTUAL
DEAD LOAD, AN ADDITIONAL COLLATERAL ROOF FRAMING DEAD LOAD OF 5
PSF SHALL BE INCLUDED. COORDINATE ANY EQUIPMENT LOADS WITH THE
ARCHITECTURAL DRAWINGS.
MB-6 CALCULATIONS FOR FRAME DEFLECTIONS SHALL BE DONE USING ONLY
THE BARE FRAME METHOD. REDUCTIONS BASED ON ENGINEERING
JUDGEMENT USING THE ASSUMED COMPOSITE STIFFNESS OF THE
BUILDING ENVELOPE SHALL NOT BE PERMITTED. DRIFT SHALL
FOLLOW AISC'S "SERVICEABILITY DESIGN CONSIDERATIONS FOR LOW-
RISE BUILDINGS". CALCULATIONS SHALL BE SUBMITTED VERIFYING
THAT THE ACTUAL DRIFT UNDER CODE REQUIRED LOADINGS DOES
NOT EXCEED THE ALLOWABLE.
MB-7 THE PRE-ENGINEERED MANUFACTURER SHALL PROVIDE ALL GIRTS,
PURLINS, AND OTHER COMPONENTS REQUIRED FOR A COMPLETE SYSTEM.
ALL WALL SYSTEMS, SUCH AS METAL STUDS, STOREFRONTS, ETC. SHALL
BE PROPERLY SUPPORTED BY THE METAL BUILDING SYSTEM.
ALLOWABLE DEFLECTIONS OF COMPONENTS SHALL BE IN ACCORDANCE
WITH THE INTERNATIONAL BUILDING CODE.
MB-8 THE FOUNDATION DESIGN IS BASED UPON INDUSTRY STANDARDS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ANY
REVISIONS REQUIRED AS A RESULT OF A CHANGE IN THE BUILDING
DESIGN ASSUMPTIONS, INCLUDING REDESIGN OF THE FOUNDATIONS.
MB-9 THE SIZE, NUMBER AND PLACEMENT PATTERN OF ALL ANCHOR BOLTS
SHALL BE DETERMINED BY THE PRE-ENGINEERED BUILDING
MANUFACTURER. MINIMUM ANCHOR BOLT EMBEDMENTS ARE INDICATED
ON THE CONTRACT DRAWINGS.
MB-10 THE PRE-ENGINEERED METAL BUILDING SHALL BE DESIGNED BY THE
MANUFACTURER TO RESIST LATERAL LOADS AS FOLLOWS:
INTERIOR FRAME LINES - RIGID FRAMES (PINNED BASED COLUMNS)
PERIMETER WALL LINES - BRACED BAYS OR PORTAL FRAMES
MB-11 THE METAL BUILDING ERECTOR SHALL PROVIDE ALL TEMPORARY GUYING
AND BRACING (SEE "GENERAL STRUCTURAL NOTES").
MB-12 UNLESS OTHERWISE NOTED OR SPECIFIED, ALL STEEL MEMBERS SHALL
BE CLEANED AND PAINTED IN ACCORDANCE WITH MANUFACTURER'S
STANDARD PROCEDURES OR THE CONTRACT DOCUMENTS, WHICHEVER IS
MORE STRINGENT.
THE FOLLOWING REACTIONS ARE THE MAXIMUM ALLOWED LOADS ON THIS
FOUNDATION DESIGN.
REACTION PER COLUMN ON TYPICAL FRAME.
DL 6.0k DOWN WL 10.0k UPLIFT LL 9.0k DOWN SL 10.0k DOWN
REACTIONS FOR COLUMNS ON LINES 2 AND 7 WERE ASSUMED TO BE HALF OF
TYPICAL FRAME.
PRE-ENGINEERED METAL
BUILDING REACTIONS:
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
/2
/2
:4 :3
A
M C
R e v it L o c a l\ -1
.0
-S
-C E
N T
R A
L -2 m a b .r v t
T R
U A
X F
IE
L D
A N
G B
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
C O
N S
T R
U C
T M
S A
C O
L D
S T
O R
A G
E
S-001
STRUCTURAL NOTES
XGFG62010ANG NO.:
3141300-160811.01
MAB
JJB
September 30, 2016
ZJE
B.O. = BOTTOM OF ________
BP# = BASE PLATE TYPE
BRG = BEARING
C TO C = CENTER TO CENTER
CCJ = CONSTRUCTION CONTROL JOINT
CJ = CONTROL JOINT
CLSM = CONTROLLED LOW STRENGTH MATERIAL ("FLOWABLE FILL")
CONT = CONTINUOUS
COR = CONTRACTING OFFICERS REPRESENTATIVE
DIA = DIAMETER
EF = EACH FACE
EL = ELEVATION
EW = EACH WAY
F# = SPREAD FOOTING TYPE
FDTN = FOUNDATION
FV = FIELD VERIFY
GALV = GALVANIZED
LLH = LONG LEG HORIZONTAL
LLV = LONG LEG VERTICAL
NIC = NOT IN CONTRACT
NTS = NOT TO SCALE
OC = ON CENTER
P# = PIER TYPE
Rxn = REACTION
SF# = STRIP FOOTING TYPE
SIM = SIMILAR
STL = STEEL
T.O. = TOP OF ________
TBD = TO BE DETERMINED
TOC = TOP OF COLUMN
TOF = TOP OF FOOTING
TOL = TOP OF LEDGE
TOP = TOP OF PIER
TOS = TOP OF STEEL
TOW = TOP OF WALL
TSL = TOP OF SLAB
TYP = TYPICAL
UNO = UNLESS NOTED OTHERWISE
WWF = WELDED WIRE FABRIC/REINFORCEMENT
09/30/16 B-3 FINAL
FOUNDATION
PLAN GENERAL NOTES:
1. SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE…